Gerardo Torres Loya
Lean Six Sigma Black Belt
*** ***** **** ****** ***. # 4 Rutherfordton NC 28139 828-***-****
acehva@r.postjobfree.com
PROFESSIONAL SUMMARY:
. Process improvements, AIAG Core Tools, SPC, DOE & Problem
solving,.
. Achieved cost reduction targets by implementing Six Sigma
& Lean Manufacturing Techniques
. Participated in six successful launches of automotive
industries in Mexico and USA.
. Managed engineers, technicians, data clerks and operators
in different areas of a high volume manufacturing plant.
. Participated as Lead auditor/Management Representative in
preparing and achieved ISO/TS-16949:2002, ISO 9001:2000
certifications in two manufacturing plants.
. Quality management systems implementation, maintenance and
improvement.
AREAS OF STRENGTH:
. Quality Management System (Third Party, Internal, External
& Layered Audits)
. Core Tools (PFMEA, PPAP, MSA, SPC, APQP)
. Process Improvement by using Six Sigma and Lean
Manufacturing tools
. Problem Solving (K.T., 8D)
. Lean Manufacturing & Six Sigma
. Supplier Development
. Statistical Process Control
EDUCATION:
Instituto Tecnol gico Regional de Chihuahua, M xico. 1981.
Bachelor of Science Degree in Industrial Engineering with a major in
Electronics
PROFESSIONAL EXPERIENCE:
Timken Corporation
Principal Quality Engineer
Rutherfortdton NC
December 2011 up to date (salary 83K/Year)
. Lead Auditor for AS-9100C QMS, responsible scheduling
and Corrective / Preventive actions implementation
and effectiveness verification.
. Responsible for Layered Process Audits and Corrective
/ Preventive actions implementation
. Process variation and process capability Analysis and
action plans implementation
. Scrap reduction, risk analysis (PFMEA's and MSA)
Precor Strength LLC
Sr. Quality Engineer
Whitsett NC
September 2009 to Dec 2011(Salary 76K/ Year)
. Responsible for Supplier development and supplier
certification
. Perform functions pertaining to discrepant material,
including working with other functional areas within
the facility and off-site location to contain and
correct the immediate situation, drive to root cause,
and prevent future non-conformances
. Investigate customer issues regarding our product
quality and facilitate appropriate resolution.
. Maintain log of customer quality issues and records
of investigations and resolution.
Collection, organization and meaningful analysis of
quality data in ways to support root cause analysis
and improvement plans and implementation.
Berger Safety Textiles LP / Narricot Industries LLC Continuous
Improvement Manager / Q.A. Manager
South Hill and Boykins VA. August
2002 to December 2008(Salary 65K /Year)
. Responsible for Quality Control dept in a Seatbelt Plant.
Achieved ISO/TS 16949:2002, ISO-9001:2000 & ISO/IEC17025
certifications
. Improved 10% First Quality Yield and reduced Customer
complaints in 50% in one year.
. Management representative for ISO/TS16949 & ISO9001
successfully implemented
. Responsible for Implementing all documents needed for the
Quality Management System
. Continuous improvements projects and Lead auditor in TS-
16949
. Responsible for QC Lab certification under A2LA (ISO
17025:2002) Norm.
. APQP for Airbags, run at rates AIAG core tools.
TRW Automotive Six Sigma Black Belt
Washington, MI
March 2001 August 2002
. Responsible for process improvement project
implementation and cost reductions.
. Responsible for teaching Six Sigma to green belt level.
. Coach and mentor Green Belts projects on process
improvement Projects.
. Monitor cost reduction objectives and present results to
upper management
. Support manufacturing processes from design phase to
start of production with quality and manufacturing
issues..
TRW Automotive/Aguirre Safety Technologies (TRW / MIIM J.V.)
Manufacturing Engineering Mgr.
Detroit, MI
Dec. 1998- March
2001(Salary 53K / Year)
. Developed documents for Production Parts Approval Process
(PPAP), in a side curtain and rollover airbags
manufacturing facility.
. Trained workforce in lean manufacturing principles.
. Developed plant measurables for Quality Operation System.
. Participated in launching of new side curtains
manufacturing lines.
TRW Occupant Restraints ALPS (Accelerated
lean production system) Project Facilitator
Chihuahua, Chih., Mexico
Dec. 1996- Dec. 1998
. Managed a cost reduction program and implemented some
elements of Toyota Production System such as; Poka
Yokes, One Piece Flow, Five S's, TPM and 8 kinds of
waste.
. Reduced model changeover from 2 hours to 20 minutes by
using Single Minute Exchange of die Technique (SMED).
. Achieved an overall cost reduction target of 40% of
Compressible cost on a high volume manufacturing plant
without sacrificing product quality and efficiency.
TRW Occupant Restraints
Maintenance Superintendent
Chihuahua, Chih., Mexico
1992-1996
. Trained workforce on Total Productive Maintenance
techniques in order to reduce downtime from 1 hour to 20
min. per shift.
. Developed and reduced yearly maintenance department
budget.
. Equipment troubleshooting and support technicians with
equipment problems.
. Managed five engineers, sixty-seven technicians, five
lead technicians and four data clerks.
. Developed maintenance measurables for Quality Operation
System such as Overall Equipment Effectiveness and
Reliability and Maintainability Indexes.
. Responsible for mistake proofing index and audits for
error proofing devices.
. Coordinated the design of mistake proofing devices for
every manufacturing operation in the plant.
Motion Control Technology (Warner Electric)
Manufacturing Services Manager
Chihuahua, Chih., Mexico
1990-1992
. Responsible for production equipment, buildings, tool
crib and environmental issues.
. Implemented a computerized maintenance management system,
including spare parts control and conducting
environmental surveys.
. Responsible for 4 engineers, 15 technicians and 3 data
clerks.
. Responsible for equipment and machinery installation and
facility startup.
Tableros de Yeso de Chihuahua
Plant Superintendent
Chihuahua, Chih., Mexico
1987-1990
. Responsible for performance in a gypsum wallboard plant.
. Responsible for production, engineering and maintenance
departments.
. Responsible for equipment and machinery installation and
facility startup.
Packard Electric Mexican Operations
Maintenance Supervisor
Chihuahua, Chih., Mexico
1985-1987
. Responsible for production equipment, buildings, tool
crib and environmental areas.
. Implemented predictive and preventive maintenance system,
including spare parts control, conducted environmental
surveys.
. Developed process letters, capability studies for
equipment.
Computer skills: Microsoft office 2000, Microsoft Projects, Auto Cad
light, SPC Software and Minitab.
Bilingual: Fluent in English and Spanish.
Six Sigma: Six Sigma Black Belt: certified by Rath and Strong.
(August 2002)
Immigration Permanent resident (Green Card)
Status:
References available upon request