JESUS R. QUINTO Jr.
Block ** Lot **, Pearl St., Medallion Homes, Marilao Bulacan, Philippines
Tel. No. (Phils) : mobile : +639**-*******
Tel. No. (KSA) : +966**-*******-ext’n. 228 mobile : +966*********
E-mail: ***********@*******.*** or ****@**-*******.***
WORK EXPERIENCES
Nov. 8, 2000 – Present AL SORAYAI TRADING and INDUSTRIAL GROUP
Jeddah, Kingdom of Saudi Arabia
Oct. 03, 2011 – Present Position: Product Development & Systems Coordinator
- QUALITY CIRCLE FACILITATOR – responsible in assisting the Circle Teams in getting started and
train the circle leader and participants in problem-solving techniques, brainstorming techniques,
creativity techniques. Conducts the regular meetings of all quality circle teams. Help them
coordinate with concerned department to solve problems or topics they selected as project.
- PRODUCTION SYSTEM COORDINATOR – Responsible in receiving and checking orders prior to
creation of ERP product codes using ORACLE system and AIMS (Advance Industrial Manufacturing
Solutions) in preparation for production.
- Interface and coordinate with operations to ensure specs meet the needs of customer and
operations.
- Coordinates all project requirements such as raw materials (yarn), product codes and project
specifications but not limited to:
Project Coordination & Project Controls
CAPEX preparation
Project Management Summary (project description and cost)
Project Schedule Adherence
Project Meetings
Meeting Minutes and Documentation
Project Monthly Report Generation
Feb. 9, 2006 – Oct. 03, 2011 Position: Production and Development Coordinator
- Do regular interaction with respective departments like Design, Planning, Production, Sales & Q.C.
for immediate update of the department’s task.
- Ensures that our product (samples produced) complies with required specifications. As such it will
readily pass Sales Department evaluation and gain customer satisfaction.
- Responsible for the timely delivery of required samples and other paraphernalia during
exhibitions.
- Performs min-max planning of fast moving samples on stock and other materials to ensure its
availability all year round.
- Maintains and controls the showroom at its best arrangement, keeping it updated with the latest
development and outgoing collections.
- Supervise helpers in any sample and showroom related jobs
- Chief operator / technician of Axminster Prototype (KIBBY)
- Prepares PR (Purchase Requisition) using Oracle Application
- As member of ISO/QS 9001: 2000 Core Team, conducts Internal Quality Audit periodically to check
if quality and process standards are maintained and observed. Give immediate feedback to
departments for their corrective measures.
Dec. 2001 – Feb. 8, 2006 Position: Production Planning Coordinator
- Responsible for the ORDER-INTAKE from Sales Dep’t. ( International, Local and Gulf Region )
- Prepares (plan and schedule) JOB ORDERS on the Network System and forward it to Production
Dep’t. (Weaving).
- Performs the processing stage of carpet design files prior to production on Schonherr looms.
- Prepares yarn color changes as per design’s combination requirement.
- Plans and schedules newly developed carpets for sampling.
- Does the monthly inventory (half-finished carpets).
- Coordinates to the following Dep’ts. for more effective and precise planning
Nov. 8, 2000 – Dec. 2001 Position: Production Supervisor, Finishing Section
- Responsible for the monitoring and supervision of operators during production.
- Responsible in keeping the good level of production and meet the target.
- Responsible for the implementation of Quality Standards during production.
- Responsible for the training of new operators.
- Prepares Daily Production Reports.
- Conducts evaluation of operators.
July 6, 2000 – Oct. 28, 2000 CONCEPCION INDUSTRIES, INC.
Refrigeration Division
Light Industry and Science Park
Cabuyao Laguna, Philippines
Position: Plant Facilities Eng’r.
- Conducts daily inspection at prod’n. line to ensure that Sub -Contractor Head has assigned only
qualified and authorized operators.
- Conducts on-the-spot audit at the prod’n. line to determine if machine parameters are adhered .
- Ensures the regular and proper implementation of Preventive Maintenance of machines based on
their frequencies.
- Complete monitoring of machine spare parts.
- Updates maintenance checklist and machine history records consistently.
- Regularly evaluates machine condition and recommends improvements if needed.
- Prepares training guides and conducts training to operators.
- Prepares reports on problems and violations.
April 1995 – May 2000 KAWASHIMA TEXTILES MFG. PHILS., INC.
Laguna Technopark, Binan Laguna, Philippines
Feb.1998 – May 2000 Position: Maintenance Chief Engineer., Weaving Section
- Provides technical direction, trainings and evaluation to Line Engineers.
- Assist Section Leader during loom conversion for new products.
- Implemented spare parts inventory control for both local and imported.
- As member of ISO/QS 9000 Core Team, conducts Internal Quality Audit periodically to check if
quality and process standards are maintained and observed. Give immediate feedback to
departments for their corrective measures.
- Analyzes weekly the defects encountered during the process and come up with preventive and
corrective solutions.
- Prepares work instructions and procedures for weaving maintenance section.
- Participates and implements the following activiti es for the improvement and cost reduction of the
process :
1. Quality Control Circles
2. Kaizen ( continuous improvements )
3. Management by Objectives ( MBO) – Cost-Cutting Projects
4. Total Preventive Maintenance ( TPM )
April 1995 – Feb.1998 Position: Maintenance Engineer, Weaving Section
- Participates in loom conversions for new products.
- Periodically maintain weaving machines through cleaning, inspection and lubrication based on its
established schedules.
- Updates and reviews history of repairs of each machine and make proper actions
EDUCATIONAL BACKGROUND
College: 1988 – 1993 Bachelor of Science in Mechanical Engineering
Adamson University, Manila, Philippines
High School: 1982 – 1986 Holy Cross School
Lagangilang Abra, Philippines
AWARDS / RECOGNITION
rd th
3 PLACE, The 6 New Honda Quality Circle Competition (Honda Cars Phils., Inc. – Jan. 30, 1998)
(Circle Theme: Reduction of Surface Defects in Weaving Section)
SEMINARS / TRAININGS ATTENDED
June 2008 Internal Auditor Course
Conducted by Dahlan Management Consulting
Al Sorayai Carpets (Plant 2), Jeddah, K.S.A.
Oct. 1999 Internal Quality Audit Training
Conducted by ECCI Consultants
Kawashima Textiles Mfg.Phils.,Inc., Binan Laguna, Philippines
June 24-26, 1999 & Training the Trainors
July 9, 1999 Conducted by Mindbrokers Corp.
Kawashima Textiles Mfg.Phils.,Inc., Binan Laguna, Philippines
Feb. 8 – Mar. 25, 1999 The Association for Overseas Technical Scholarship (AOTS) Training
1. General Orientation Course
Sponsored by The Ministry of International Trade and Industry of Japan
Yokohama Kenshu Center, Yokohama, Japan
2. Technical Training Course
(weaving prod’n. processes, preventive maintenance, process and quality control)
Kawashima Textiles Mfg. Ltd., Ichihara, Kyoto, Japan
Aug. 14-16, 1998 Leadership Through Self-Knowledge
Sponsored by Kawashima Textiles Mfg.Phils.,Inc.
Development Academy of the Phils., Tagaytay City, Philippines
April 25-26 & Quality Circle
May 10, 1997 Conducted by John Clements Consultants, Inc.
Kawashima Textiles Mfg.Phils.,Inc., Binan Laguna, Philippines
PERSONAL DATA
Nationality : Filipino
Date of Birth : July 10, 1969
Place of Birth : Tayum Abra, Philippines
Civil Status : Married
CHARACTER REFERENCES
1. Eng’r. Fuad Sultan Al Nahdi - Plant Maintenance Manager - Weaving
Al Sorayai Trading & Industrial Group (Plant 1 & 3), Jeddah, KSA
Tel. No. +966*-******* or 6376976 local 274
2. Mr. Tarek I. Ali - Contract & Project Division Manager
Al Sorayai Trading & Industrial Group, Jeddah, KSA
Tel. No. +966*-******* or 6376976 local 343