Post Job Free

Resume

Sign in

Production and Inventory Control Manager

Location:
Troy, OH
Salary:
65000
Posted:
June 03, 2014

Contact this candidate

Resume:

DAVID B. DUNFEE

**** ********** *****

Troy, Ohio 45373

Mobile: 937-***-****

Email: aceeuz@r.postjobfree.com

Education: BS Secondary Education, Miami University, Oxford OH

SAP JD Edwards 5P problem solving

Method/Time Management Studies Shop Floor Control Facilities Layout Planning

APICS classes Future 3 EDI Software TPS

TS16949 ISO9004 KanBan

Production Planner Aug 2011 to Jan 2014

Rittal Corporation, Urbana, OH

Responsible for Master scheduling and daily production scheduling of over 500 SKUs in the Climate Control Department.

This consisted of three separate product lines and distinct products. Responsible for the creation, release and material

confirmation for all orders. Primary contact for customer service questions regarding delivery. Utilized a KanBan system to

maintain proper inventory levels of all fabricated material. Developed and maintained annual forecasts. Work is performed

within an SAP environment and extensive utilization of Excel to import and consolidate information.

Accomplishments:

• Improved production efficiency 5% in 1 month

Manager of Production Control and Material Services Dec 1989 – Oct 2009

Neaton Automotive Products Mfg., Inc. Eaton, OH

Responsible for the scheduling of all operations for component part supplier to the automotive industry. The

processes involved included; die casting, reaction injection molding, injection molding and assembly. Provided input for

manpower planning and machine capacity evaluation for this Japanese owned company, with annual sales of $185 million and

inventory turns of 21. Inventory and Production Control were accomplished through a variety of visual control systems

(KanBan and MRP) using JD Edwards as the base ERP system. Managed the Shipping, Receiving, Warehouse (plant and off-

site) and Repack functions using Future3 EDI software to handle all shipment, order processing and communication with our

customers. Used RF scanners to complete ASN information. Also responsible for carrier selection and coordination of

inbound overseas containers. Responsible for an overall budget of $2 million. Managed 5 salaried direct reports and 27

hourly associates

Accomplishments:

• Saved $100K/per year on Freight in 4 months by analyzing inbound and out bound freight patterns and consolidation

• Saved $60K per year in 8 months by renegotiating external warehousing contract

• Developed the packaging engineer function to handle all packaging requirements internally and with customers

• Saved $2K per month by developing an internal returnable container tracking system, project took 6 months

• Supported TS16949 certification

• Eliminated need for 2 associates on 3rd shift by establishing a dock time for all suppliers, in less than 4 months.

• Module leader in the implementation of JD Edwards and Future 3 software

• Assisted in the planning and layout of 5 expansions to the facility

• Managed annual warehouse layout changes based upon new model introductions

• In the last year reduced organization by 40% and trimmed expenses by 25%

Manager Production Planning Dec 1988 – Dec 1989

Harris Graphic, Dayton, OH

Responsible for development of the Production Planning Department in an MRPII environment using newly purchased

Cullinet software. Developed planning bills of material to be used to effectively forecast and plan the production of Business

Forms Presses and Bindery equipment. Module leader for the implementation of the MPS module of the Cullinet System.

Project Supervisor Jan 1985 – Dec 1988

Whirlpool Corporation/Kitchen Aid, Dayton, OH

Responsible for coordinating the implementation of new products, models and parts. Interfaced with various plant, P and IC

groups, purchasing departments, vendors, tool engineering and design engineering. Products include disposers, mixers, ovens

and cooktops.

Manager of Manufacturing Jan 1979 – Dec 1984

Hobart Corporation, KitchenAid Division, Medina, OH

Responsible for managing the daily activities of entire 70,000 Sq. Ft. Facility which employed 100 hourly employees and

produced 600 disposers each day. Supervised four department managers and four line supervisors.

Manager Production & Inventory Control

Hobart Corporation, KitchenAid Division, Medina, OH

Within an MRP environment responsible for directing the duties of all production functions, all data support functions and all

shipping, receiving, warehouse and stockroom functions. Supervised seven salaried and 4 hourly personnel. Responsible for a

budget of over $500,000. Routinely left in charge of the total manufacturing facility in the absence of plant manager.

ADDITIONAL SOFTWARE

• Proficient in Excel, Word, Access, PowerPoint



Contact this candidate