Alfredo J. Llop Mera

**** **** *** **

Seattle, WA 98116

787-***-****

PROFESSIONAL EXPERIENCE

President, On Point Corporation, October 2012 – Present

Project and Construction Management Consulting Services -through self-performance, sub-contract or contract

management- to public and private owners, design firms, insurance companies and contractors. Areas of service

include:

Claims Avoidance and Management. Design and implement construction claims consciousness and avoidance

program. A proactive, preventative and non -adversarial approach to managing project disputes and claims.

Project Feasibility/site analysis. Project feasibility/site analysis includes technical feasibility, preliminary

economic feasibility, infrastructure availability, potential environmental impacts and mitigation, preliminary

consultation with pertinent government and regulatory agencies.

Conceptual/Master Planning. Manage the planning process and conceptual plan to the level of detail necessary

to initiate the permits process, environmental impact analysis and documents, infrastructure requirements,

government agencies’ coordination and endorsements efforts, and cash flow projections.

Pre-design/engineering studies. Manage land survey and topography, soil studies (preliminary for master plan

and detailed for final design). Percolation, H/H studies, wetland delineation studies and others required for final

design and permits.

Environmental Impact Compliance. Manage the environmental compliance process including environmental

impact studies and documents such as environmental assessments and environmental impact statements. Plan

and hold scope and follow up meetings with regulatory agencies.

Location Consultation, Endorsements and Permits. Manage the preparation of proposed project submission for

site approval (P.R. Planning Board), for infrastructure agencies preliminary and final endorsements, as well as

for site development and construction permits.

Design Management. Management and coordination of conceptual, preliminary and final design activities with

the permits and environmental activities, as well as with the bid package(s).

Construction Management. CPM scheduling, cost control, contract management, resource management, chan ge

order impact analysis, estimating, procurement, claim analysis a nd claim preparation, constructability review

and value engineering.

Project Management Consultant, January 2010 – September 2012

President, Llop Construction Corp, February 2007 – December 2009

President, Llop Consulting Corp., July 2001 – December 2009

Business Development Director, Caribbean Region, CSA Group, August 2000 – July 2001

Direct and oversee business development planning and execution activities.

Oversee the responsibilities of the five staff members of the Business Development Group in the Puerto Rico

office, including presentation material, proposal management, lead and contacts management.

Plan, develop and deliver presentations to potential customers, asso ciations, professional organizations and

government agencies.

Provide advice and support to CSA staff to identify and manage leads and client accounts.

As Director of the Business Development Group, CSA was awarded over 20 million dollars worth of

professional service contracts.

Resumé A. Llop

Page 2

Project Manager, Puerto Rico Convention Center District, CSA Group, June 1998 – July 2000

Structured and managed, as CSA Project Manager, on behalf of Puerto Rico Tourism Company, the Program

Management Office for the Americas World Trade District development in Isla Grande, a 300 million-dollar

project, including:

o Program Management proposal, including the scope of services and fee estimates.

o Developed the Work Breakdown Structure for the entire program.

o Planning and control of the following: Establishing the program management office, staffing, operational

procedures and budgets, information technology (IT) systems, document management, project CPM

scheduling system, cost management, contracts management, procurement management, master planning

consultant qualification/ selection /oversight, environmental and permitting (EIS and Location Approval),

land acquisition, pre-design consultants qualification/ selection /oversight, government and regulatory

agency coordination, community relations and public information, public hearings, design consultants

qualification/selection/oversight, master developer qualification/selection, environmental site assessment,

asbestos and lead abatement, demolition and construction managers qualificat ion/selection.

Project Controls Director, CSA Architects and Engineers, July 1997 – June 1998

In charge of developing, implementing and maintaining CPM scheduling, cost control and resources

management systems.

Identified, qualified, recruited and managed the workload and project assignments of four Project Controls

Specialists.

Developed a standardized Work Breakdown Structure to assist in planning and control of tasks in the areas

of project management, environmental documents, environmental studies, con sulting and improvement

studies, permits and endorsements, procurement, design, construction and operations and maintenance.

In charge of evaluating progress of and claims from contractors of the North Coast Super Aqueduct Project,

and issuing recommendations to PRASA.

Project Management Consultant, 1988 - 1997

Provide professional project management consulting services to engineering and construction firms in areas of:

CPM Scheduling, cost control, resource management, change order impact analysis, estimating, procurement,

claim analysis and claim preparation.

Operations Manager, Fernández & Gutiérrez, Inc.- General Contractors, 1993 - 1994

In charge of all administrative functions of a construction firm.

Functions included estimating, contracting, cost control, CPM scheduling, procurement, submittals preparation,

claim analysis and preparation.

Engineering Technician, Metcalf & Eddy, Inc., 1986 - 1988

Develop design project CPM schedules, including the Blue Plains Wastewater Treatment Plant Dual

Sedimentation Basins project in Washington, D.C.

Contributed significantly in the development of the Nomenclature and Enumerat ion System for Washington

D.C. Water and Wastewater systems.

FORMAL EDUCATION

Bachelor of Science, Boston University, 1988

Major in Mathematics. Minor in Psychology; Additional courses in Engineering, Accounting, Management and

Computer Science.

RELATED EDUCATION

Appraisal Institute Courses

Resumé A. Llop

Page 3

Real Estate Development Course: Bortech Institute. 2006

PROFESSIONAL SKILLS

Certified Project Management Professional (PMP) by the PMI 1

Certified Planning & Scheduling Professional (PSP) by the AACEI 2

Certified Earned Value Professional (EVP) by the AACEI 3

Excellent planning, management, public and human relations skills

Knowledge of up-to-date project management information technology (hardware and software),

telecommunications systems, and their business applications

Fully bilingual: Spanish and English

Project Experience as Project Management Consultant, January 2010 - Present

Plaza Universitaria, San Juan, Puerto Rico. Forensic claim expert witness for Desarrollos Universitarios

1.

in a lawsuit filed by the general contractor. 2012- Current

Massapequa Train Station Reconstruction, Long Island, New York; Dennis Quicker. CPM Scheduling-

2.

Development. 2013.

Pfyzer PNS Project, Guayama, Puerto Rico; Torcon Inc.; CPM Scheduling- Development and

3.

Maintenence. 2011

New School of Toa Alta,Toa Alta, Puerto Rico; PGM/César Masó; CPM Scheduling- Development and

4.

Maintenence. 2011-2012

Basilio Milán School,Toa Baja, Puerto Rico; Pyramids; CPM Scheduling- Development and Maintenence.

5.

2010-2013

Scheduling and claims consultant to CDM Program Management Consortium for the PRASA Capital

6.

Improvement Program South/West/East regions, in charge of evaluating baseline schedules, updates

and revisions of over 25 projects under construction. Evaluate contractor claims and make

recommendations. 2010- Current

Forensic project delay expert witness for Dorado Academy in an arbitration case against general

7.

contractor. 2010- 2011

Project Experience through Llop Consulting & Llop Construction:

Beam Bearing Repairs- Bridge 1875,Guaynabo, Puerto Rico; CC Construction; CPM Scheduling-

1.

Development and Maintenence. 2009-2010

Patillas WTP, Patillas, Puerto Rico; Black & Veatch; Claims and Dispute Resolution Expert Work. 2007 -

2.

2008

Aceituna Water Filtration Plant, Villalba, Puerto Rico; Black & Veatc; Claims and Dispute Resolution

3.

Expert Work. 2007

Aceituna Water Transmissio n Line, Villalba, Puerto Rico; Black & Veatch. Construction Monitoring and

4.

Inspection Support. 2007-2008

Méndez Residence, Guaynabo, Puerto Rico; Mari Méndez. General Contractor. 2009 -Current

5.

San José 757, Santurce, Puerto Rico; City Development. Land Development Management. 2007-Current

6.

Rio Cibuco Cleaning, Vega Baja, Puerto Rico; Pyramid Architecs. CPM Scheduling- Development and

7.

Maintenence. 2008

Ponce Underground Electrical Distribution, Ponce, Puerto Rico; Belmec. CPM Scheduling-

8.

Development and Maintenence. 2008-Current

1

PMP under re-certification process

2

PSP under re-certification process

3

EVP under re-certification process

Resumé A. Llop

Page 4

Plaza de la Convalecencia, Río Piedras, Puerto Rico; HBA Contractors. CPM Scheduling- Development

9.

and Maintenence. 2008-2010

Demolition Clínica Fernández, Hato Rey, Puerto Rico; Homeca Recycling Ceneter. CPM Scheduling-

10.

Development and Maintenence. 2008

Portugués River Clean-up and Deficiencies Corrections, Ponce, Puerto Rico; Hot Asphalt Paving, Inc.

11.

CPM Scheduling- Development and Maintenence. 2007-2010

Brisas de Costa Real, Guayama, Puerto Rico; SIGA Corp. General Contractor. 2008-2009

12.

Yiu Residence, Condado, Puerto Rico; Steven Yiu; General Contractor. 2009

13.

Plaza del Centenario UPR,Cayey, Puerto Rico; Pagán Heavy Equipment; CPM Scheduling -

14.

Development and Maintenence. 2008-2009

Piccola Fontana Restaurant Remodelling- El San Juan Hotel, Carolina, Puerto Rico; FE Restaurant;

15.

Construction Management at-Risk. 2007

Aqua Bar & Grill Restaurant Remodelling- Condado Plaza Hotel, San Juan, Puerto Rico; Fontana

16.

Restaurant; Construction Management at-Risk. 2007

Yamato Restaurant Remodelling- El San Juan Hotel, Carolina, Puerto Rico; DWT; Construction

17.

Management at-Risk. 2007

Finca Monte Rey Development, San Juan, Puerto Rico; Empresas Fonalledas; CPM Scheduling-

18.

Development and Maintenance. 2007- 2009

Condado Underground Electrical Distribution, San Juan, Puerto Rico; Edison Electrical Contractors;

19.

CPM Scheduling- Development and Maintenance. 2006-2007.

Quebradillas Coliseum, Quebradillas, Puerto Rico; Belmec Construction; CPM scheduling and

20.

development and maintenance. 2006- 2009.

Quebradillas Coliseum, Quebradillas, Puerto Rico; Belmec Construction; Claims and Dispute Resolution

21.

Expert Work. 2006- Current

Plaza Cacique Agueybaná, Ponce, Puerto Rico; Modern Technology Construction; Claims and Dispute

22.

Resolution Expert Work. 2006- 2007

Eje Sociedad Publicitaria, New Office Facilities, Guaynabo, Puerto Rico; Eje Sociedad Publicitaria;

23.

Construction Management at-Risk. 2006- 2007

Rivieras del Río Development, Trujillo Alto, Puerto Rico; Claims and Dispute Resolution Expert Work.

24.

Expert Witness in Court Hearing. 2006- 2011

Martins BBQ, LMM Airport, Carolina, Puerto Rico; Fasola Corporartion; Construction Management at -

25.

Risk. 2006

600-space Parking Deck, Hospital del Maestro, Hato Rey, Puerto Rico. Metal Building Construction.

26.

Project Management. 2006- 2009

El Coral Housing Project, Carolina, Puerto Rico; Orion Contractors; Administración de Vivienda Pública.

27.

CPM schedule development and maintenance. 2006- Current

Jardines de San Fernando Housing Project, Toa Alta, Puerto Rico; Orion Contractors; Administración

28.

de Vivienda Pública. CPM schedule development and maintenance. 2006 - Current

Hidden Valley vs CNA Casualty, San Juan, Puerto Rico; CNA Casualty; Claims and Dispute Resolution

29.

Expert Work. 2006

Palmer School, Río Grande, Puerto Rico; Crufón vs Autoridad de Edificios Públicos; Claims and Dispute

30.

Resolution Expert Work. 2006- 2008

Colomer Pump Station Removal and New Sanitary Main; Longo de Puerto Rico, Inc.; AFI / AAA.

31.

CPM schedule development and maintenance. 2005- Current

AEELA Offices, Mayaguez, Puerto Rico; Modern Technology Construction, Inc. AEELA. CPM schedule

32.

development and maintenance. 2006- 2009

Rio Blanco Off-Stream Reservoir-, Naguabo, Puerto Rico. Las Piedras Construction, Inc.; AAA. CPM

33.

schedule development and maintenance and Project Management Consulting. 103 Million. 2005- Current

Water Transmission System Improvements-Toa Alta-, Toa Alta, Puerto Rico. Rullán Ruiz Group, Inc.;

34.

AFI / AAA. Delay Claims and Dispute Resolution Work. 2005 - 2008

Elementary Urban School, Cidra, Puerto Rico; César A. Masó, Inc.; Autoridad de Edificios Públicos.

35.

CPM schedule development and maintenance. 13 million. 2005 - 2009

Inifinity Tower, San Juan, Puerto Rico; MCA Development Corp. Comprehensive Project and

36.

Construction Management Services; 2005-2008

Ponce de León Housing Project- Phase II, Ponce, Puerto Rico; Constructora I. Meléndaz; Administración

37.

de Vivienda Pública. CPM schedule development and maintenance. 12 MM. 2005- 2008

Resumé A. Llop

Page 5

Francisco Oller High School, Cataño, Puerto Rico; HBA Contractors; Autoridad de Edificios Públicos.

38.

CPM schedule development and maintenance. 9 million 2005 - 2007

Par-Lyo Compendial Project, Bristol Myers Squibb, Manatí, Puerto Rico; Torcon Construction.

39.

Planning & Scheduling. 2004- 2009

Security Forces Facility, Base Muñiz, Carolina, Puerto Rico. Edison Electrical Contractors; PR Air

40.

National Guard. CPM schedule development and maintenance. 2004- 2006

Prototype Manufacturing Building, Arecibo, Puerto Rico; HBA Contractors; PRIDCO. CPM schedule

41.

development and maintenance. 2004- 2006

Fermín Delgado High School, Naguabo, Puerto Rico; HBA Contractors; Autoridad de Edificios Públicos.

42.

CPM schedule development and maintenance. 2004- 2007

Playita Residential Community, San Juan, Puerto Rico; HBA Contractors; PR Housing Department.

43.

CPM schedule development and maintenance. 2004- 2007

Water Transmission Main Guaynabo-Caguas-Gurabo- CP 7A, Guaynabo, Puerto Rico. Longo de

44.

Puerto Rico, Inc.; AFI / AAA. CPM schedule development and maintenance. 2005 - 2007

Water Transmission Main Guaynabo-Caguas-Gurabo- CP 12, Guaynabo, Puerto Rico. Rullán Ruiz

45.

Group, Inc.; AFI / AAA. CPM schedule development and maintenance. 2004-2007

Water Transmission Main Guaynabo-Caguas-Gurabo- CP 11, Guaynabo, Puerto Rico. Longo de

46.

Puerto Rico, Inc.; AFI / AAA. CPM schedule development and maintenance. 2004 - 2007

Improvements to Carolina-Canóvanas Water Supply System- Phase IV, Trujillo Alto, Puerto Rico.

47.

Longo de Puerto Rico, Inc.; AFI / AAA. CPM schedule development and maintenance. 2004- 2006

Condado Lagoon Condominium, Paseo Caribe, San Juan, Puerto Rico. Dick Corporation; Lema

48.

Developers AFI / AAA. CPM schedule development and maintenance. 2004- 2007

Yauco Underground Electrical Improvements, Yauco, Puerto Rico; Modern Technology Construction,

49.

Inc. Puerto Rico Highway and Transportation Authority. CPM schedule development and maintenance.

2004

Coto Laurel Sanitary Sewer System, Ponce, Puerto Rico; Robles Asphalt Corp. AFI / AAA. CPM

50.

schedule development and maintenance. 2003- 2004

Rebekah Colberg Sports Complex Improvements, Río Piedras, Puerto Rico; Modern Technology

51.

Construction, Inc. Municipality of San Juan. CPM schedule development and maintenance. 2003- 2006

Plaza Universitaria Project, Río Piedras, Puerto Rico; Desarrollos Universitarios, Inc. Cost and time

52.

extension claim analysis and recommendations to owner. 2003- 2007

Erbitux Manufacturing Facility- Bristol Myers Squibb, Mayaguez, Puerto Rico; Caribbean Project

53.

Management. Master Planning & Scheduling. 2004

Humalog Bulk Manufacturing Facility - Eli Lilly, Carolina, Puerto Rico; Caribbean Project Management.

54.

Master Planning & Scheduling. 2003-2004

Sanitary Trunk Sewer at PR-14, Phase II, Ponce, Puerto Rico; Rullán Ruiz Group, Inc.; AFI / AAA.

55.

CPM schedule development and maintenance. 2003- 2004

Altos de Cuba Special Community, Vega Baja, Puerto Rico; Krupp & Co.; Depatamento de la Vivienda.

56.

CPM schedule development and maintenance. 2003- 2004

Salinas High School, Salinas, Puerto Rico; Aireko Construction Co.; Autoridad de Edificios Públicos.

57.

CPM schedule development and maintenance. 2003-2004

Water Transmission Line, Villalba-Juana Díaz, Villalba, Puerto Rico; Longo de Puerto Rico, Inc.; AFI /

58.

AAA. CPM schedule development and maintenance. 2003 - 2005

Villalba Regional Aqueduct, Juana Díaz-Coamo, Juana Díaz, Puerto Rico; Constructora de Hato Rey,

59.

SE; AFI / AAA. CPM schedule development and maintenance. 2003 - 2004

Sanitary Trunk Sewer at PR-14, Phase IB, Ponce, Puerto Rico; Rullán Ruiz Group, Inc.; AFI / AAA.

60.

CPM schedule development and maintenance. 2003-2004

Amgen Administration Building & Site, Juncos, Puerto Rico; Caribbean Industrial Construction; Amgen.

61.

CPM schedule development and maintenance. 2003

Luis Muñoz Rivera Vocational School, Utuado, Puerto Rico; Aireko Construction Co.;

62.

Autoridad de Edificios Públicos. Change order impact analysis and claim preparation.

2003

Warehouse 25A Expansion, Barceloneta, Puerto Rico; Beayley Construction Group Corp.; Abbott

63.

Pharmaceuticals. CPM schedule development and maintenance. 2003

Escuela Elemental Emilia Bonilla, Villalba, Puerto Rico; J.R. Ramos, Inc; Autoridad de Edificios

64.

Públicos. CPM schedule development and maintenance. 2003

Resumé A. Llop

Page 6

Escuela Vocacional José Felipe Zayas, Coamo, Puerto Rico; J.R. Ramos, Inc; Autoridad de Edificios

65.

Públicos. 2003 CPM schedule development and maintenance.

Escuela Libre de Música, Caguas, Puerto Rico; Muñiz Burgos, Inc.; Autoridad de Edificios Públicos.

66.

2003 CPM schedule development and maintenance.

Wyeth, Effexor Manufacturing Facilities; Foundations and Structural Steel Packages, Guayama,

67.

Puerto Rico; LG Scott; Wyeth. CPM schedule development. 2003

Trujillo Alto Historic Bridge Restoration (3 million), Trujillo Alto, Puerto Rico. Project Manager on

68.

behalf of general contractor. Management of all daily activities, which included scheduling, supervision of

personnel, security monitoring, sub-contract management, progress meetings, payroll, procurement,

certifications for payment and daily reports.

Santo Tomás Development. (12 million), Naguabo, Puerto Rico. Project Manager in the areas of land

69.

acquisition, conceptual planning, environmental studies and documents, consulting pre -design studies,

permits and endorsements, procurement, design and construction; for a 273 -lot residential sub-division

project.

Santa Clara Development. (8 million), Río Grande, Puerto Rico. Project Manager in the areas of land

70.

acquisition, conceptual planning, environmental studies and documents, consulting pre-design studies,

permits and endorsements, procurement, design and construction; for a 120 -lot residential sub-division

project.

ALFREDO J. LLOP- PROJECT CONTROLS CONSULTANT- PROJECT EXPERIENCE

1. New Pharmaceutical Facility and Production Transfer, Vega Baja; Warner Lambert, Inc.

2. Aqua-Expreso Intermodal Terminal Building, San Juan; Calzadilla Construction Corp.; Ports Authority

3. Toa Alta Wastewater Treatment Facility, Toa Alta; Golden Eagle Corp.; PRASA

4. Zeno Gandía Housing Project Modernization, Arecibo; Rodríguez & Del Valle, Inc.; CRUV

5. Tank Farm Upgrade Project, Barceloneta; Bristol Myers.

6. Banco Bilbao Vizcaya Office Tower, Caparra; Rexam Limited Partnership.

7. American International Plaza, San Juan; Rexach Construction Co.; American Insurance Group.

8. Manuel A. Pérez Housing Project Modernization - Phase 2, San Juan; Rodríguez & Del Valle, Inc./

CRUV.

9. Aibonito Water Treatment Plant, Aibonito; Longo Puerto Rico, Inc.; PRASA.

10. International Trade Center, Guaynabo; Caribbean Industrial Construction Corp.; Commonwealth of PR.

11. Columbus Landing Housing Project, Mayaguez; S & D Contractors, Inc.; CRUV.

12. Lubriderm Transfer Project, Vega Baja; Warner Lambert, Inc.

13. In-House Plastic Bottle Blow Molding Project, Vega Baja; Warner Lambert, Inc.

14. OC Dust Collector Facility & Equipment Upgrade, Fajardo; Warner Lambert, Inc.

15. San Lorenzo Wastewater Treatment Plant, San Lorenzo; Golden Eagle Corp.; PRASA.

16. Antilles Middle School, Fort Buchanan; Miramar Construction Co.; U.S. Navy.

17. San Lorenzo WWTP Rehabilitation & Upgrade, San Lorenzo; Golden Eagle, S.E.

18. Yabucoa WWTP Rehabilitation & Upgrade, Yabucoa; Prota Construction, S.E.; PRASA.

19. José Gándara Housing Project Modernization, Ponce; Constructora Estelar, S.E.; CRUV

20. Dr. Pila Extension Housing Project Modernization, Ponce; Constructora Estelar, S.E.; CRUV

21. Ramos Antonini Housing Project Modernization, San Juan; Constructora Estelar, S.E.; CRUV.

22. New Office & Service Building, Vega Baja; Longo PR, Inc.; Army Corps of Engineers.

23. Entrance Channel, Contract No. 3, Ponce; Longo PR, Inc.; Army Corps of Engineers.

24. Centro Cardiovascular de Puerto Rico y el Caribe, Río Piedras; Triangle Engineering Corp.

25. Metropolitan Detention Center, Guaynabo; Triangle Engineering Corp.; Federal Bureau of Prisons.

26. Francisco Figueroa Housing Project Modernization, Añasco; Caribe Tecno, S.E.; CRUV.

27. Manuel Hernández Rosa Housing Project Modernization, Mayaguez; Caribe Tecno, S.E.; CRUV

28. DEMI Expansion Projects - Package 2, 3, 4, Manatí; DuPont Electronic Materials, Inc.

29. Syntex Manufacturing Facility Expansion Project, Humacao; Rexach Construction Co.; Syntex.

30. SB Pharmaceutical Pilot Plant Project, Cidra; Rexach Construction Co.; SB Pharmaceuticals.

Rexach’s New Office Building, Guaynabo; Rexach Construction Co.

31.

32. ICI Pharmaceuticals Process Building, Guayama; Rexach Construction Co.; ICI Pharmaceuticals.

Resumé A. Llop

Page 7

33. Eli Lilly Pharmaceuticals Process Building, Carolina; Rexach Construction Co.; Eli Lilly

Pharmaceuticals.

34. Eli Lilly Pharmaceuticals Utility Building, Carolina; Rexach Construction Co.; Eli Lilly

Pharmaceuticals.

35. Eli Lilly Pharmaceuticals Utility Arbor, Carolina; Rexach Construction Co.; Eli Lilly Pharmac euticals.

36. Park Davis Office Building & Parking, Carolina; Rexach Construction Co.; Warner Lambert, Inc.

37. Paseo Portuario Project Master Schedule, San Juan; Rexach Construction Co.; Paseo Portuario, S.E.

38. El Monte Office Tower, Río Piedras; Rexach Construction Co.; Interstate General Properties.

39. Aguadilla Shopping Mall, Aguadilla; Rexach Construction Co.; Luan Investment.

40. Roche Hydrogenation Project, Manatí; Rexach Construction Co.; Roche Pharmaceuticals.

41. Anaquest Process Building Foundations, Guayama; Rexach Construction Co.; Anaquest

Pharmaceuticals.

42. ICI Pharmaceuticals - Site & Off-Site Work, Guayama; Rexach Construction Co.; ICI

Pharmaceuticals.

43. Condominio Puerta del Sol, Río Piedras; Rexach Construction Co.; Universidad de Puerto Rico.

44. Highway PR-22, Manatí; Rexach Construction Co.; Autoridad de Carreteras.

45. Residencia Viso, Caparra; Rexach Construction Co.; Joaquín Viso.

46. Manuel A. Pérez Housing Project- Ph. 3, Río Piedras; Rodríguez & Del Valle, Publc Housing

Administration.

47. Southern Regional Institution - Phase 4B, Ponce; Rodríguez & Del Valle, Inc.; Public Buildings

Authority.

48. Bowling Center, Fort Buchanan; Pro-Builders; Army Corps of Engineers.

49. Puente Teodoro Moscoso- Plan Director, Río Piedras; Autopistas de Puerto Rico; HTA

50. DEMI Expansion Project; Manatí; Dupont Electronic Materials.

51. Lopid SR 100% Conversion, Vega Baja; Caribbean Industrial Construction; Warner Lambert, Inc.

52. Hospital Universitario- Phase B, Río Piedras; RB Construction Corp.; Public Buildings Authority.

53. Peñuelas Family Health Center, Peñuelas; Fernández & Gutiérrez, Inc.; Public Buildings Authority.

54. La Plata- El Torito Elementary School, Cayey; Fernández & Gutiérrez, Inc.; Public Buildings Authority.

55. Ramos Antonini Housing Project, Ponce; Constructora Estelar, S.E.; Public Buildings Authority.

56. Dilantin Manufacturing Project, Vega Baja; Caribbean Industrial Construction; Warner Lambert, Inc.

57. LVP Bags Project, Barceloneta; Caribbean Industrial Construction; Sterling Pharmacueticals.

58. Terminal Access Improvements- Luis Muñoz Marín Airport; Rexach Construction; Ports Authority.

59. Isabela Family Health Center, Isabela; Rido Construction; Public Buildings Authority.

60. Metropolitan Juvenile Detention Center, Bayamón; Rexach Construction; Public Buildings Authority.

61. Certenejas Second Unit School, Cidra; Muñiz Burgos, Inc.; Public Buildings Authority.

62. Ortho New Facilities, Manatí; Caribbean Industrial Construction; Ortho Pharmaceuticals.

63. Efferdent Foundation Work, Vega Baja; Caribbean Industrial Construction; Warner Lambert, Inc.

64. Paseo Portuario- Building M-4, San Juan; Rexach Construction Co.; Paseo Portuario, S.E.

65. Caguas Sur Jr. High School, Caguas; Fernández & Gutiérrez, Inc.; Public Buildings Authority.

66. Cidra Vocational High School, Cidra; Fernández & Gutiérrez, Inc.; Public Buildings Authority.

67. Las Piedras Jr. High School, Las Piedras; Constrctora de las Américas; Public Buildings Authority.

68. Humacao Vocational High School, Humacao; Constructora Estelar, S.E.; Public Buildings Authority.

69. Guaynabo Fine Arts Center, Guaynabo; Rexach Construction Co.; Municipality of Guaynabo.

70. Highway PR-53, Humacao; Rexach Construction Co.; Highway and Transportation Authority.

71. Danbury Pharmacal, Humacao; Caribbean Industrial Construction; Danbury Pharmacal Caribe, Inc.

72. Utility Building, Barceloneta; Rexach Construction Co.; Abbott Laboratories.

73. Sanitary Sewer And Lift Station, Barceloneta; Rexach Construction Co.; Abbott Laboratories.

74. Builder’s Square Store, Bayamón; Rexach Construction Co.; Builder’s Square.

75. Carps Tabletting Facility, Vega Baja; Caribbean Industrial Construction; Warner Lambert, Inc.

76. Efferdent Manufacturing Facility, Vega Baja; Caribbean Industrial Construction; Warner Lambert, Inc.

77. Fire Station/Civil Defense/Tourism Office, Ponce; Redondo Construction Corp; Public Buildings

Authority.

78. Hazardous Waste Incinerator- Site, Barceloneta; ; Caribbean Industrial Construction; Merck, Sharp &

Dohme.

79. Juana Matos Housing Project, Cataño; Rodríguez & Del Valle, Inc.; Public Buildings Authority.

80. Medianía Alta School, Loíza; Constructora Intercontinental, Inc.; Public Buildings Authority.

Resumé A. Llop

Page 8

81. Manuel A. Pérez Housing Project- Ph IV, Río Piedras; Constructora Estelar, S.E.; Public Buildings

Authority.

82. Pharmtec Expansion, Fajardo; Caribbean Industrial Construction; Warner Lambert, Inc.

83. New Purified Water Systems, Vega Baja; Warner Lambert, Inc.

84. Sam’s Club Store, Bayamón; Rexach Construction Co.; Wal Mart.

85. San Patricio Housing Project, Loíza; Eutech Construction, S.E.; Public Buildings Authority.

86. Manuel Martorell Housing Project, Comerío; Fernández & Gutiérrez, Inc.; Public Buildings Authority.

87. La Rosaleda Housing Project, Guaynabo; Eutech Construction, S.E.; Public Buildings Authority.

88. Herbicide DG Facility, Manatí; Rexach Construction Co.; Cyanamid Co.

89. Fire Pumping Station & Water Tanks, Barceloneta; Rexach Construction Co.;Abbott Laboratories.

90. Ignacio Morales Dávila Housing Project, Naguabo; Fernández & Gutiérrez, Inc.; Public Buildings

Authority.

91. Rosendo Matienzo Cintrón Housing Project, Cataño; Fernández & Gutiérrez, Inc.; Public Build ings

Authority.

92. Daskalos Elementary School Expansion, Río Piedras; Fernández & Gutiérrez, Inc.; Daskalos.

93. Aguilita Elementary School, Juana Díaz; ; Fernández & Gutiérrez, Inc.; Public Buildings Authority.

94. Sizzler- Plaza del Caribe, Ponce; Caribbean Industrial Construction; Sizzler.

95. New Horse Stables- El Comandante; Fernández & Gutiérrez, Inc.; HB Development.

96. Los Primos Nissan Car Dealer; Fernández & Gutiérrez, Inc.; Ambar Nissan.

97. Colegio Regional de Carolina Expansion, Carolina; Fernández & Gutiérrez, Inc.; Adm. Colegios

Regionales.

98. CEA Industrial Supply Expansion, Hato Rey; Fernández & Gutiérrez, Inc.; CEA Industrial Supply.

99. Urbanización Lomas del Unibon, Morovis; Best Value Engineering; Desarrolladora Orama.

100. New Social Security Office, Bayamón; Caribbean Industrial Construction; Inamar Investment.

101. New Covered Basketball Court- Hill Brothers, Carolina; Karmar Construction; Municipality of San Juan.

102. Juana Matos Housing Project, Cataño; Quintero Construction; Public Housing Administration.

103. North Coast Superaqueduct Water Treatment Plant, Arecibo; Constructora de Hato Rey, Inc.; PRASA.

104. Storm Sewer System Improvement - Hill Brothers, Carolina; Newtec, SE; Municipality of San Juan.

105. Jardínes de Sellés Housing Project, Río Piedras; Urban Builders, S.E.; Public Housing Administration.