FAHIM RAZA
Communication Address: #**, *th Main
4th A cross, Mobile: +91-998*******
BTM Layout 1st Stage,
Bangalore-560029. Date of birth: 20th Dec 1976, India
India (As recorded in Matriculation)
Nationality: India
Email: acecf0@r.postjobfree.com Driving: Indian
driving license
acecf0@r.postjobfree.com Marital Status: Married.
Education:
B.Tech 1996-2000 B.Tech in Manufacturing Engineering,
University of Ranchi, India. Result obtained: 9.11 CGPA
out of 10.
Intermediate (12th): Passed in 1993 with Aggregate (63.2 %).
Matriculation (10th): Passed in 1991 with Aggregate (76.11 %).
SKILL SET
# Skill Area Experience (in Years) Proficiency
1 CADDS5 1.5 EXPERT
2 CATIA V5(part 4.5 EXPERT
3 design,sheetmetal,GSD,FTA) 2.0 EXPERT
VPM(ENOVIA)
4 PRO-Engineer 1 EXPERT
5 ICAD 1.5 EXPERT
6 AUTOCAD 2002 1.0 EXPERT
7 Wind chill 1.0 EXPERT
8 PRIMES 2.0 1.0 EXPERT
9 SAP 1.0 EXPERT
10 DPDS 1.0 EXPERT
Employment History
Company Position Held From Date To Date
Wipro Technical 12Aug 2011 Till Date
Technologies Consultant 01 Feb 2011 05 Aug 2011
Goodrich Technical Lead 05-Apr-2010 31 Jan 2011
Aerospace Senior
Goodrich Engineer-
Aerospace
Infosys Engineering Lead 01-Oct-2009 31-Mar-2010
Infosys Project Manager 01-Feb-2008 30-Sep-2009
Infosys Sr. Design 01-Aug-2005 31-Jan-2008
Engineer
Infosys Design Engineer 12-Jul-2004 31-Jul-2005
ADA Research Fellow-A 13-Jun-2002 08-Jul-2004
Overall Summary of Experience
. I have 12 years' experience in the field of Aerospace Design and
Development projects and project management.
. Currently holding US B1 visa valid upto 23 Jan 2023.
. Currently handling multiple aerospace projects like CESA, Recaro, P3 and
also non aero project like Rolls Royce Marine and Shell.
. I have nearly 1.5 years onsite experience at Airbus, Filton, UK as a
subcontrator for IFTE (Inner Fixed Trailing Edge) -A380-Freighter -Design
of Skin and stringers.
. Worked on Aerospace projects of Light Combat Aircraft..
. Expertise in Tools like ICAD, CATIA V5, CADDS5, VPM, DMU,&Pro/Engineer
. Worked on Hyde concession of Long Range Aircraft (A330-200/300 and A340-
500/600). Hyde Group is one of the suppliers of Airbus.
. Worked on MRJ 90 Mid Fuselage structure specially Frames, Skin, Stringer,
Floor structure, Splices and Cutouts etc. at onsite MJET Nagoya Japan for
1 year and at offshore Infosys Mysore.
. Worked on C Series (Bombardier)/MRJ Engine Mount at Goodrich Aerospace
Ltd, Bangalore.
. Currently managing the project of Recaro Aircraft Seating,P3,CESA and
Shell DDC Program at Wipro (Engineering Design Services)
Work Experience:
01 Project Re-engineering of S92 MLG Actuator.
Name
Company Wipro Technologies Ltd.(Engineering Design Services)
Client CESA, Spain
Description of the project
This Project involves in the design support activity of S92 MLG
Actuator.The team in Wipro (Engineering Design Services) supports CESA in
Solid modelling, assemble and detailing of Manufacturing Parts. This
project also involve the Solid modelling of Standard parts in Catia V5.
Role : Technical Consultant
Responsibility : 3D Solid modelling and 2D drawings of S 92 MLG Actuator
component.
Review of the project deliverables.
Compliance of CESA Standards
Direct Interaction with customer and weekly and monthly
reporting.
Fully involved in Invoicing and payment process.
Vendor coordination and interaction with global teams.
Leading and developing the team of Engineers.
Project planning, monitoring and reporting.
Implementing Wipro Quality process methodologies
Managing offshore and onsite team
Monitoring and controlling the deliverables to client
Designing to confirm the materials, fastening & assembly
specs.
Engineering design & supporting documentation
Tracking the timeframe for the deliverables
Duration : From: Jun-2013
To: Till date
Hardware : Dell, Unix HP
Software : CATIA V5
01 Project Design support of Recaro Aircraft Seating for different
Name airlines and Standard part Harmonization of Rolls Royce
Marine.
Company Wipro Technologies Ltd.(Engineering Design Services)
Client RECARO and Rolls-Royce
Description of the project
This Project involves in the design support activity of Aircraft Seating.
Recaro team in Wipro (Engineering Design Services) supports RECARO
seating division in Germany, at different stages of the product
development and design.
Role : Project Manager
Responsibility : Tolerance and Interface Analysis of seating component.
Direct Interaction with customer and weekly and Monthly
reporting.
Fully involved in Invoicing and payment process.
Vendor coordination and interaction with global teams.
Leading and developing the team of Engineers.
Project planning, monitoring and reporting.
Implementing Wipro Quality process methodologies
Managing offshore and onsite team
Monitoring and controlling the deliverables to client
Designing to confirm the materials, fastening & assembly
specs.
Engineering design & supporting documentation
Tracking the timeframe for the deliverables
Duration : From: Aug-2011
To: Till date
Hardware : Dell, Unix HP
Software : CATIA V5
01 Project DDC Shell Program.
Name
Company Wipro Technologies Ltd. (Energy and Utility)
Client Shell Houston.
Description of the project
This Project involves in document and data controlling of engineering
drawings.
Role : Project Manager
Responsibility :
Direct Interaction with onsite team and weekly
reporting.
Fully involved in Invoicing and payment process.
Vendor coordination and interaction with global teams.
Leading and ramp up the team of document controllers.
Project planning, monitoring and reporting.
Implementing Wipro Quality process methodologies
Managing offshore and onsite team
Monitoring and controlling the deliverables to client
Contract management.
Program management activity
Duration : From: Sep-2013
To: Till date
Hardware : Dell
02 Project Detail design of Engine Mount for C series
Name (Bombardier)/MRJ using MBD approach
Company Goodrich Aerospace Ltd.
Client Bombardier
Description of the project
This Project involves in the detail design of Engine Mount. Engine Mount
team in Goodrich IDC (India Development Center), supports Goodrich Aero
structure division in USA, at different stages of the product development
and is being developed as a COE.
Role : Technical Lead
Responsibility : Tolerance and Interface definition for the Engine
Mounts.
GD&T development for the different components involved.
Detailed design development in Catia FT&A module - MBD
(Model Based Definition).
Vendor coordination and interaction with global teams.
Leading and developing the team of Engineers.
Project planning, monitoring and reporting.
Implementing Goodrich CI (Continuous Improvement) and
GLPD (GR Lean PD) methodologies
Defining Enovia and Catia Attributes
Concurrent approach to ensure design for manufacture &
assembly
Designing to confirm the materials, fastening & assembly
specs.
Engineering design & supporting documentation
Tracking the timeframe for the deliverables
Fair understanding on aircraft production methods and
processes
Duration : From: APR-2010
To: Aug-2011
Hardware : SUN Microsystem Unix,HP
Software : CATIA V5, VPM (ENOVIA LCA).
03 Project Design of MRJ 90 -Mid Fuselage structure- specially Frames,
Name Skin, Stringer, Floor structure, Splices and cutouts etc
Company Infosys Technologies Ltd.
Client Mitsubishi Aircraft corporation, Japan-Worked at onsite in
Japan for 1year and now working at offshore
Description of the project
This Project involves in the design of Skin, stringers, Frames, splices, cutouts, Floor structure,,intercoastals etc of Mid Fuselage structure
.
Role : Onsite and offshore Design Lead (Engineering Lead)
Responsibility : Design of Sheet metal frames
Design of Machined frames
Design of Edge frames of cutouts
Design of Door Cutout structure
Customer and interface partner Interaction.
Creating Design definition.
Weight reduction activities
Involved in the design and modelling of skin panels RSM
and DDMs
Creating sheet metal model of frame using CATIA V5.
Creating RSM (Relational skeleton Model)s for Frames and
Cutout activities .
Parametric RSM approach linked with Design Table.
Involved in defining Relational Map of RSM (relation
skeleton model) and DDM (detail design model).
CAD 3D modelling, detail design and detailing using
CATIA V5
Used the VPM for data management.
Used DMU for clash checking of interface component.
Defining Enovia and Catia Attributes
Concurrent approach to ensure design for manufacture &
assembly
Designing to confirm the materials, fastening & assembly
specs.
Engineering design & supporting documentation
Tracking the timeframe for the deliverables
Fair understanding on aircraft production methods and
processes
Duration : From: Dec-2008
To: Mar-2010
Hardware : SUN Microsystem UNIX, HP
Software : CATIA V5, VPM(ENOVIA LCA).
04 Project Name : Concession of Long Range Aircrafts (A330-200/300
and A340-500/600)
Company Infosys Technologies Ltd.
Client : Hyde Group, UK (Airbus supplier)
Description of the project
Concession is the written authorization to use or release an item
which does not conform to the specified requirements, i.e. Definition
Dossier (ISO 8402) (Ref 1) or concession is the way by which
nonconforming items may be accepted for use, with or without repair.
Once the manufacturing personnel raise concession, it comes to Design
office, which decides the remedy/answer for the non-conformance. The
decision to accept a nonconforming item, with or without repair, by
concession shall be taken only by the Design Office
The decision is recorded on the concession form, with all supporting
drawings and sketches attached, and the concession classified
according to this decision. Design Office acceptance is given by an
authorized signatory(s), as per the Design Organization Manual.
Role : Design Lead (Senior Design Engineer)
Responsibility : 1. Design Assessment of the non-conformance
occurred in the aircraft component.
2. Review of the concession executed by team
members
3. Controlling the defect tracker.
4. Ensuring a defect free delivery to Hyde group.
5. Consultation with Hyde design signatory and
stress team also.
Duration : From Date: Jun-2006 To Date: Nov-2008
Hardware : Pentium IV and III PCs
Software : SAP, DPDS, AutoCAD
05 Project Name Skin Extension-Inner Fixed Trailing Edge of
A380-Freighter
Design of Stringers Using ICAD.
Company Infosys Technologies Ltd.
Client GEDSitec, UK-Worked onsite at United Kingdom.
Description of the project
This Project involves in the design of Skin, stringers, and
stiffeners of Inner Fixed Trailing Edge -A380 Freighter.
Role : Senior Design Engineer
Responsibilit : ICAD design of stringers
y Design of Fastener Maps
Generation of ICAD scheme drawings.
Customer and interface partner Interaction.
Creating drawing set in the primes and sign off as
Designer.
Involved in the design and modelling of skin Top and
btm toolbody,flat skins, skin thk drawing, skin
profiles, Edge beam, Stiffener beam,Striffener edge
beam, top skin stiffener,Owp Buttstrap,Seal carrier,
Reinforcement Plate,FWD Hinge brkt door etc.
Creating Formed model of the flat skin using ICAD.
Creating loft and Formed Models of stringer using
ICAD.
Configure Management at onsite.
CAD 3D modelling, detail design and detailing using
CADDS5
Used the CAMU tree as the design aid for designing
components
Used DMU for clash checking of interface component.
Concurrent approach to ensure design for manufacture
& assembly
Designing to confirm the materials, fastening &
assembly specs.
Engineering design & supporting documentation
Tracking the timeframe for the deliverables
Fair understanding on aircraft production methods
and processes
Duration : From: Jan-2005
To: Jun-2006
Hardware : SUN Microsystem Unix,HP
Software : ICAD, CADDS 5, CATIA V5, PRIMES 2.0, Wind chill.
06 Project Name ATCHKSTR (WP1 Covers Geometry & WP9 Ribs Geometry
Support)
Company Infosys Technologies Ltd
Client ATKINS, UK
Description of the project
The project involves data collection activities. The data collected
shall be used for static and F&DT Checkstress analysis of the
A380-800 main wingbox covers and spars, and in particular with
regards to skin overhang widths and fwd & aft skin panel widths.
Task 1: Data collection of skin overhangs and skin panel dimensions.
Provision of true length of the skin line (i.e. taking account of
curvature) as follows:
from the spar datum to the skin edge.
from the spar datum to the first skin to spar bolt.
the separation between the aft-most stringer bolts to the fore-most
rear spar bolt.
the separation between the fore-most stringer bolt and the aft-most
front spar bolt.
Task 2: Data collection of Stringer bolting positions.
As part of the static and F&DT Checkstress analysis of the A380-800
covers there is a requirement to identify the location and size of a
large number of bolting positions. We Provide following parameters of
fasteners from CAD model:
Pitch
Edge distance.
Distance from stringer datum.
Panel Thickness.
Runout dimensions (Flange width, Flange Thickness etc.)
Task 3: Check of ICAD & DFM Data
As part of the static and F&DT Checkstress analysis for A380-800,
main wingbox metallic ribs Cabot Design (Cabot) have created a
database of rib geometry data which has been populated with
information from ICAD and DFM sources.
Task is to validate the geometry data within this database against
the CADDS 5 solid model. This will validate the accuracy of both the
initial transfer of CADDS 5 information into ICAD & DFM, and the
transfer of ICAD & DFM data into Cabot's database.
Task 4: Provision of non-ICAD and non-DFM Data
The Cabot database is not complete, as few rib geometry do not have
ICAD and DFM sources. We measure the CAD model and update the
database.
Task 5:Provision of Spar to Rib connection Data
Provision of X and Y distances of bolt centre for outboard and
inboard forward ribs as follows:
Outboard rib connection to front spar.
Outboard rib connection to rear spar.
Inboard fwd rib connection to front spar.
Inboard fwd rib connection to centre spar
Inboard aft rib connection to rear spar
Provision of parameters X, SL, B, L2, and D for inboard aft rib
connection to centre spar.
Role : Module Lead
Responsibilit : Customer Interaction.
y Migration of CADDS 5 solid model to Catia V5.
Measurement and data collection of skin overhang and
skin panel dimensions from Catia V5 model.
Measurement and data collection of covers fastener
map dimensions from Catia V5 model.
Verifying geometry data against the Catia V5 model
of skin.
Review of skin overhang database and Fastener Maps
database.
Duration : From: Aug-2004
To: Dec-2004
Hardware : Pentium IV and III PCs
Software : Catia V5, CADDS5
07 Project Name FERCHCAG3 (Creation of Standard Part Library)
Company Infosys Technologies, Ltd.
Client Airbus Germany
Description of the project
The project included creation of CATIA V5 Standard Part Library. The
process involved Modelling the part, Creating the design table and
linking it to the part, which facilitated in deriving various
configuration of the standard, Resolving the parts and maintaining
the standards.
Role : Design Engineer
Responsibilit : 1.Creation of 3D model drawings for system equipment
y of Aircraft.
2. Review of models received from suppliers to
ensure conformity to Airbus Standards.
Duration : From: Jul-2004
To: Aug-2004
Hardware : Pentium IV and III PCs
Software : Catia V5
PRIOR EXPERIENCE OUTSIDE INFOSYS
Company worked for : AERONAUTICAL DEVELOPMENT AGENCY, BANGALORE
Duration : From Date: 13-Jun-2002 To Date: 08-Jul-2004
Worked As : RESEARCH FELLOW
1 Project Name : Drop Tank of Light Combat Aircraft (LCA)
Client : ADA, Bangalore
Description of the project
An external store, detachable during flight meant to serve as
additional fuel tank in order to enhance the range of flight of the
aircraft. The two Drop tanks are of fuel capacity 800 litres and 1200
litres. Drop Tank is divided into three main parts externally nose
cone, centre section and rear cones and internally into two parts
namely fwd and aft shells. Whole Drop Tank Design is carried out in
Detail Design, ADA. CPDC, Hyderabad carries out the Drop Tank
production. Job involved drafting 2D layouts, subassemblies,
assemblies, part drawings of sealing bulkhead, bottom frame assembly,
rack assembly etc, and corresponding 3D modelling for stress and
weight analysis and to the final assembly of parts.
Role : Research Fellow
Responsibility : 1. Surface & Solid modelling of the Structural
components for
Analysing, weight calculation & checking for
interference.
2. Detail study of parts of aircraft, control
surfaces with their
location in the Aircraft assembly
3. Converting 3D views to suitable 2D views and
drafting detail
Drawing.
4. Creation of 3D and 2D preliminary layouts,
station diagram of
A/C structures, sub-assemblies, assemblies and part
drawings.
Duration : From Date: Jun, 2002 To Date: Jul, 2004
Hardware : Pentium IV and III PCs
Software : Catia V5, Pro-E, AutoCAD
2 Project Name : Air brake of Light Combat Aircraft (Technical
Demonstration -1)
Client : ADA, Bangalore
Description of the project
Airbrake is one of a control surface, which helps in creating a
control Drag during take off, taxing and landing. LCA has twin
airbrakes, one on LH & RH sides mounted on the outer periphery of
fuselage surface in between the fin attachment frames Station #34 and
Station #37. These airbrakes are operated by means of Hydraulic
jacks. Job involved in
modelling of parts such as Stiffeners, Ribs, Beams, Torque box &
assembly of all the parts. Air brake is used for the Manoeuvring of
the Aircraft. It is used as brake while landing the Aircraft.
Role : Research Fellow
Responsibility : 1. Surface & Solid modelling of the Structural
components for
Analysing, weight calculation & checking for
interference.
2. Detail study of parts of aircraft, control
surfaces with their
location in the Aircraft assembly
3. Converting 3D views to suitable 2D views and
drafting detail
Drawing.
4. Creation of 3D and 2D preliminary layouts,
station diagram of
A/C structures, sub-assemblies, assemblies and part
drawings.
Duration : From Date: Jan-2003 To Date: Feb-2003
Hardware : Pentium IV and III PCs
Software : Catia V5, Pro-E, AutoCAD
3 Project Name : Rear Fuselage of Light Combat Aircraft Trainer.
Client : ADA, Bangalore
Description of the project
Trainer is a two-seater aircraft, which is similar to fighter used to
train the pilot. The fighter version of LCA is already completed the
design part .The Design work of front fuselage is carried out in
Detail Design. I was involved in modelling team of Sta #16 Bulkhead,
Inclined shear walls, Central shear wall, Framelets, Side door
assemblies, Skin & Stringer assembly.
Role : Research Fellow
Responsibility : 1. Surface & Solid modelling of the Structural
components for
Analysing, weight calculation & checking for
interference.
2. Detail study of parts of aircraft, control
surfaces with their
location in the Aircraft assembly
3. Converting 3D views to suitable 2D views and
drafting detail
Drawing.
4. Creation of 3D and 2D preliminary layouts,
station diagram of
A/C structures, sub-assemblies, assemblies and part
drawings.
Duration : From Date: Nov-2002 To Date: Dec-2002
Hardware : Pentium IV and III PCs
Software : Catia V5, Pro-E, AutoCAD
DETAILS OF TRAINING UNDERGONE
# Trained On Period (in Days)
1 Undergone intensive training on Advance GD & T at 5 Days
IDC (India Design Center), Goodrich Aerospace
Ltd, Bangalore.
2 Undergone intensive training on Windchill Primes 2 days
2.0 for A380 at Filton Airbus UK.
3 Undergone intensive training on Windchill DMS for 1 day
A380 at Filton Airbus UK.
4 Undergone intensive training on CATIA V5 for 20 days.
solid /surface/wire frame modelling conducted by
EDS Technologies, Bangalore.
5 Undergone intensive training on PRO-E 2001 for 12 days
Solid modelling conducted by Rolta India Pvt Ltd
Bangalore.
6 Undergone intensive training in VPM for Solid/ 6 days.
Surface modelling conducted by CSM Software Ltd,
Bangalore.
7 Undergone intensive training on PRO-E Wildfire 12 days.
for Solid modelling conducted by Rolta India Pvt
Ltd Bangalore for a period of 12 days.
8 Undergone Project Management Certification 6 Days
training within WIPRO LTD
Training Courses:
Computer and IT: MS Office 98', MS Project 98', AutoCAD 2000, . Use
of Word processing, presentation packages, spreadsheets and
analytical tools were endemic in my daily job at Airbus UK
as well as in Infosys, Bangalore.
Skills:
Interpersonal Skills Team working, group meeting and report writing were
common at work experiences, which continuously helped me to
improve my communication skills both verbally and in
writing.
Problem Solving Design activities and calculations at UK and Japan enabled
me to enhance my technical knowledge about Interface
matrix; I was able to develop a Design solution for
Interface related Problem.
Languages Fluent in English, Urdu and Hindi.
Leisure Interests:
Sports: I enjoy playing Cricket, Badminton, Vollyball, and tennis at
non-competitive level.
Permanent Adress: C/O Mohammad Nasim, 3rd Floor Flat -E
Haideri Apartment Block -B Main
Road Ranchi-834001
References:
Mahammad Nayeem Annavaram Mohammad Vasib
Engagement Manager Design Lead,
Unisys Global Services Quest,
IndiaBangalore, India Bangalore, India
Mobile +91 Tel. No. +91 (0-944*******
97829765535917829765535 Email:
Email: acecf0@r.postjobfree.com acecf0@r.postjobfree.com
m
Previous UK Work Permit Details:
PERMIT NUMBER: F030592
WORKER REFERENCE NO. C094265
DATE OF ISSUE: 13OCT 2004
VALID UNTIL : 01OCT 2006