Substation SCADA Engineer Profile
SANTOSH MAURYA
Nationality: Indian
Languages: English, Hindi
Curriculum: B.E (Electronics Engineer)
Email-id : *******.***@*****.***
Mobile No. +91-997*******
Date of Birth: 21st Oct 1986
Technology Expertise:
SCADA/HMI Micro SCADA 9.2,9.3,WINCC SCADA
IEC-104, IEC-101,IEC-61850,AXS-4 SISCO,CP-16,
Communication
Protocols SYS 600 C
Tools RTUTILL, Multi Prog, CPTT
Organization School/College Period Percentage
Central Railway School
S.S.C 44.93 %
March 2002
Kalyan
Model College Kalyan H.S.C March 2004 52.00%
Shri Sant Gadge Baba July 2004
College of Engineering and Electronics Engg. To Aggregate 59.00%
Technology,Bhusawal June 2008
Experience Summary: July 2008 to Present
5+ Years of experience in Substation SCADA and RTU.
Currently Doing the Commissioning for DVC (Damodar Valley Corporation )Site.
Done the Commissioning for Tata Consultancy Service Jamshedpur.
It include two substation 132/33kv Sonari and Bara.
ABB Qatar 3 Months
Working As SCS Engg. For ABB LLC QATAR (Kalkitech) for End Client Qatar petroleum.
Testing and Commissioning of 33kv Sub Station Dhukan Site.
VSP Siemens –SAS ENGG 3 Months
Worked as SAS Engg. For Siemens (Kalkitech)
220kV, 33kV and 11kV Bay Respectively
Pre Commissioning of SCADA using Software WinCC, OPC - AXS4,CP-16 Protocol Convertor .
Vishakhapatnam Steel plant LBSS-6 and MRS Substation.
Power Grid Site Survey Done For PMU Installation
Site Survey, Trouble shooting of DCU Sync 5000 for power grid AMR.
1
Substation SCADA Engineer Profile
ABB DUBAI : 6 Months
Worked As SCMS Engg. For ABB LLC Dubai (Kalkitech)For End Client FEWA and SEWA.
Testing and Commissioning of Substation Automation System by using software tool
Micro SCADA 9.3
Commissioning of Substation Automation System for FEWA and SEWA 132/33KV S/S.
Reliance Airport Metro Express line: 2years
Maintenance of RTU and Scada Server
Trouble shooting of Siemens RTU AK-1703
ABB SAS Server in RSS
Delhi Metro Rail Corporation Project: 1 years 6 months
Testing and Commissioning of RTU560D and Micro SCADA 9.2.
Local END to END testing of RTU to SCADA and then Final Testing With Client
Configuration and Troubleshooting of RTU 560D
SLD and Data preparation in Microscada.
Projects Reference:
Tata Power: 1 year
Testing and Commissioning of RTU through SCADA SYSTEM
Handled the following tasks:
Configuration of RTU as per customer requirement
Interfacing of the controllers to communicate with the Control center through IEC104 protocol.
Software Used: Micro SCADA Pro 9.1 and RTU AC31
Customer: TATA POWER (Mumbai)
Installation Testing and Commissioning of SCADA System for B.E 4&5 Project.
Description: In this ongoing project stages involves Installation, testing and commissioning of SCADA system
for B.E 4&5 Project to supervise, control and acquire the various specified data from the ‘controlled station’
such as Receiving substations, Auxiliary Substations, Traction and auxiliary networks,
Metro stations, switching stations (SP, SSP etc) along the Line, Depot etc.
Handled the following tasks:
Maintenance and Troubleshooting of Siemens SCADA Server Power Spectrum CC and RTU Ak -1703
Maintenance of ABB SCADA SAS Server
.
Software Used: RTU560D &MICROSCADA Pro 9.2
Customer: Delhi Metro Rail Corporation Ltd (DMRC)
PassPort No. – K8048474
I hereby declare that the information furnished above is true to the best of my Knowledge and belief.
(SANTOSH MAURYA)
Place: Bangalore
2
Substation SCADA Engineer Profile
3