Post Job Free
Sign in

Engineer Project

Location:
India
Posted:
August 05, 2014

Contact this candidate

Resume:

Substation SCADA Engineer Profile

SANTOSH MAURYA

Nationality: Indian

Languages: English, Hindi

Curriculum: B.E (Electronics Engineer)

Email-id : *******.***@*****.***

Mobile No. +91-997*******

Date of Birth: 21st Oct 1986

Technology Expertise:

SCADA/HMI Micro SCADA 9.2,9.3,WINCC SCADA

IEC-104, IEC-101,IEC-61850,AXS-4 SISCO,CP-16,

Communication

Protocols SYS 600 C

Tools RTUTILL, Multi Prog, CPTT

Organization School/College Period Percentage

Central Railway School

S.S.C 44.93 %

March 2002

Kalyan

Model College Kalyan H.S.C March 2004 52.00%

Shri Sant Gadge Baba July 2004

College of Engineering and Electronics Engg. To Aggregate 59.00%

Technology,Bhusawal June 2008

Experience Summary: July 2008 to Present

5+ Years of experience in Substation SCADA and RTU.

Currently Doing the Commissioning for DVC (Damodar Valley Corporation )Site.

Done the Commissioning for Tata Consultancy Service Jamshedpur.

It include two substation 132/33kv Sonari and Bara.

ABB Qatar 3 Months

Working As SCS Engg. For ABB LLC QATAR (Kalkitech) for End Client Qatar petroleum.

Testing and Commissioning of 33kv Sub Station Dhukan Site.

VSP Siemens –SAS ENGG 3 Months

Worked as SAS Engg. For Siemens (Kalkitech)

220kV, 33kV and 11kV Bay Respectively

Pre Commissioning of SCADA using Software WinCC, OPC - AXS4,CP-16 Protocol Convertor .

Vishakhapatnam Steel plant LBSS-6 and MRS Substation.

Power Grid Site Survey Done For PMU Installation

Site Survey, Trouble shooting of DCU Sync 5000 for power grid AMR.

1

Substation SCADA Engineer Profile

ABB DUBAI : 6 Months

Worked As SCMS Engg. For ABB LLC Dubai (Kalkitech)For End Client FEWA and SEWA.

Testing and Commissioning of Substation Automation System by using software tool

Micro SCADA 9.3

Commissioning of Substation Automation System for FEWA and SEWA 132/33KV S/S.

Reliance Airport Metro Express line: 2years

Maintenance of RTU and Scada Server

Trouble shooting of Siemens RTU AK-1703

ABB SAS Server in RSS

Delhi Metro Rail Corporation Project: 1 years 6 months

Testing and Commissioning of RTU560D and Micro SCADA 9.2.

Local END to END testing of RTU to SCADA and then Final Testing With Client

Configuration and Troubleshooting of RTU 560D

SLD and Data preparation in Microscada.

Projects Reference:

Tata Power: 1 year

Testing and Commissioning of RTU through SCADA SYSTEM

Handled the following tasks:

Configuration of RTU as per customer requirement

Interfacing of the controllers to communicate with the Control center through IEC104 protocol.

Software Used: Micro SCADA Pro 9.1 and RTU AC31

Customer: TATA POWER (Mumbai)

Installation Testing and Commissioning of SCADA System for B.E 4&5 Project.

Description: In this ongoing project stages involves Installation, testing and commissioning of SCADA system

for B.E 4&5 Project to supervise, control and acquire the various specified data from the ‘controlled station’

such as Receiving substations, Auxiliary Substations, Traction and auxiliary networks,

Metro stations, switching stations (SP, SSP etc) along the Line, Depot etc.

Handled the following tasks:

Maintenance and Troubleshooting of Siemens SCADA Server Power Spectrum CC and RTU Ak -1703

Maintenance of ABB SCADA SAS Server

.

Software Used: RTU560D &MICROSCADA Pro 9.2

Customer: Delhi Metro Rail Corporation Ltd (DMRC)

PassPort No. – K8048474

I hereby declare that the information furnished above is true to the best of my Knowledge and belief.

(SANTOSH MAURYA)

Place: Bangalore

2

Substation SCADA Engineer Profile

3



Contact this candidate