Post Job Free
Sign in

Quality Control Project

Location:
Rolla, MO
Posted:
August 04, 2014

Contact this candidate

Resume:

SEPIDEH ALMASI MONFARED

***,*,**** ****, *****, MO 65401, 860-***-****, *****@***.***

SUMMARY

Master of Science in Engineering Management is interested in innovation to solve the manufacturing and logistic problems.

Additionally my professional experience has taught me how to consider environmental concerns and collaborate to reduce the

environmental impacts of firms’ activities and expected cost of transportation under “carbon tax” and “carbon cap -and-trade”

situation. I should mention my Employment Authorization Document (EAD) would help me on this.

EDUCATION

Missouri University of Science & Technology, Rolla, MO Aug2013- Dec2014

M.S. in Engineering Management, Graduate Research Assistant, GPA: 4

Thesis: Analysis of Carbon Emission Regulations and supplier selection using genetic algorithm.

Graduate certificate in statistics and SAS programming.

University of Connecticut, Storrs, CT Aug2012-Apr2013

Lab Assistant.

Teaching MS office in Business school.

Business Communication Certificate.

Azad University, Tehran, Iran Sep2007-Feb2011

B.S. in Industrial Engineering, Emphasis: Programming & Analyzing Systems, GPA: 3.7

Thesis: reducing the installation time of elevators using six sigma techniques.

PROFESSIONAL EXPERIENCE

Golestan (the Biggest Tea Company in IRAN), Tehran, Iran Dec2011-Feb2012

Intern at Project Management Department

Revised of OPC & FPC charts to keep track of improving the performance using re -engineering method.

Revised of motion and time study factors in guide directions, 5S actions, and transporting materials inside the plant.

Applying new structure based on quality factors in production line and increasing the capability of production by 5%.

Noor Neda Factory (Production of Fire station Facilities), Tehran, Iran Oct2011-Dec2011

Intern in Project Control Department

Studied the production line of revolving lights using simulation method (GPSS and Arena).

KONE Elevator Company, Tehran, Iran Jan 2011-Dec2011

Intern at Quality Control Department

Utilizing Six Sigma to decrease the delay in installation of elevators and escalators.

Revision of reporting steps in control projects department using MS project software and gathering data from project experts.

Scheduling and forecasting installation plans for elevators and escalators.

Suggesting new solutions to increase the level of sigma or decreasing the delay.

Tehran 4th District Central Fire Station, Tehran, Iran March2010-April2010

Intern in research Department

Applied three phases of six sigma methodology in order to reduce waiting time.

Finding the shortest route in emergency situations to keep tracking of the lowest possible service time (there was no GPS

system at the time in IRAN).

Parsian Hospital, Tehran,Iran April2010-May2010

Intern in Maintenance Department

Scheduled Repair and Maintenance of medical instruments.

Offset Printing House,Tehran, Iran May2009-June2009

Intern in research and Development Department

Worked in an assembly line to measure the time of activities in order to reduce it by a solution.

Revising the offset printing procedure to keep tacking of the most significant factors in a high quality print using multiple

regressions.

Increasing the “efficiency ratio” by changing facility layout in the color print part.

Petrorahbaran(a subset of IRAN oil ministry) Company,Tehran,Iran Feb2008-Dec2010

Business Analyst

Data gathering – using evaluation forms and extracting quantitative factors form the last 5 years’ documents.

Building a database for MIS department to keep track the efficiency for executive managers using MS. Access.

Classifying the managers based on the built database using SPSS software.

Shahabkhodro Company (Automobile manufacturing), Tehran, Iran Oct2008-Dec2008

Intern in Process Control

Improving the efficiency of production line by 3% with new design of facility layout in a hood production part.

Revised and studied light beams process in production line of the plant layout to reassure the best flow.



Contact this candidate