Michael Liang
***** ********** ****** ********, ** 90703 562-***-**** (H) 562-***-**** (C) *******.*****.***@*****.***
Professional Summary
Raytheon El Segundo, CA Mission Assurance Technical Staff 2/2008 -9/2013
• Quality Assurance on Enterprise Management Systems - Customer Performance Appraisal Report,
Development Work Product Management and Gate Review, and Engineering Changes, Program EVMS,
Program Quality and Risk Management; Effectiveness Metric Reports to OPS review
• Collaborate Value Stream- Functions and Programs for Enterprise Excellence Initiatives; SAP BI Data
Mining, Statistical Analysis applied to unveil systemic concerns and improvement opportunities
• Independent Review SME for Electrical, Mechanical, Chemical, M&P and Optical Troubleshooting
• Prioritize AS9100 category for Quality Group to conduct CAPA and Nonconformance Audits
• Mentor junior rotating engineers; assign project for SPC, DOE, Six Sigma and Minitab training
SLH Design Corp Buena Park, CA Co-Founder, Product Development, Launching & Sales 1/1995 – 12/2007
• Collect Business Intelligent for Marketing Strategy, Financial Planning, Proposal and Contract Closure SWOT
Analysis and Risk Assessment, Multivariate, Stochastic and Time series Categorical Analyses applied
• Participate Industrial Colloquium to define New Product Platform, Standard and Specification; flow
down Design Criteria for NPD/NPI; specialized in Electro-Mechanical System Design and Packaging
Solution for Computer Peripherals, Medical Device, and Automotive OEM customers
• Design and built hundreds of tooling for Plastic Injection Molding, Metal Stamping, Die Casting, Casting,
Extrusion, Powder Metal Components, Fixtures for Semiconductor Fabrication, SMT and PCB
• Supply Chain Management for Vendor Site Evaluation, Technology Transfer and Partnership Agreement
• Install Quality System, Metrology Lab, ISO9000/9001, Supplier Quality Rating System and MRB to US and
Off-Shore facilities, to assure Product Quality and Compliance by Vendors
Optical Radiation Corp Azusa CA Engineering Project Manager 8/1993 – 12/1994
• Negotiate with EPA Regulatory for CFC Emission term; build business case to meet emission goal
• Develop and implement Aqua Cleaning System for Plastic Lens Coating; emission goal met
• Install SPC to CR39 Resin Compounding and Molding Processes; DOE for process Optimization
Other: R&D Metallurgy Lab Manager, MPE(Scale Up/Automation), PMP (Medical Device packaging/ Cleaning)
Engineering Skill Set
PMP EVMS System Engineering Electro-Mechanical Design Electrochemistry Corrosion Control
Linear Control System Thermal Management Hardware Engineering Semiconductor Physic & Devices
Material Characterization & Failure Analysis M&P Engineering Metallurgy Risk Management FRACAS
Lean Manufacturing Six Sigma CMMI SPC DOE FMEA DFSS MRB KPI CAPA MRP
Supplier Rating, Quality and Sourcing ERP Statistical Analysis and Tool(Minitab, R, Excel SPC XL, SPSS)
Education
M.S. Material Science and Engineering University of Southern California
B.S. Materials and Metallurgical Engineering National Cheng Kung University, Taiwan, R.O.C.
TA Statistics and Solid State Physic for Engineering College Student
RA Laser/Acouto-Optic Device for Optical Computing SUNY Stony Brook New York