Post Job Free
Sign in

Manager Power Plant

Location:
United States
Posted:
July 30, 2014

Contact this candidate

Resume:

Bobby L. Sebesta

***** ** **** ( Hempstead, TX **445 ( 979-***-**** ( 713-***-**** (

************@*****.***

Operations Manager Fabrication Specialist

Astute, results-driven operations management professional with an

impressive record of accomplishments and leadership experience in

manufacturing based technology, quality systems, staff development, process

engineering, and improvement within fabrication and manufacturing

environments. Comprehensive and progressive knowledge of the policies,

procedures, processes and techniques required to drive profitability, build

top-performing and customer-focused teams, while achieving organizational

and customer objectives. Dynamic, driven, and versatile team leader with

exceptional communication skills and the ability to work with diverse

groups while inspiring confidence at all levels.

Areas of Expertise

Supply Chain Manufacturing Fabrication Supplier Relations Customer

Service

Project Management Cost Control Revenue Growth Strategic Planning

Quality Management

. Working knowledge of ISO 9001:2008 and ISO/TS 29001:2010 standards and

API, ABS and DNV requirements

. Project management experience in leading all aspects of multi-million

dollar projects from initial scope definition to developing cost and

resource estimates, through to project execution.

. Provided and promoted a safe work environment with a record of

achieving no loss time accidents for 2+ years.

. Managed and led the fabrication of a $12 million power plant.

. Successfully managed a team of 125 employees across three geographic

locations on two multi-million dollar projects, cutting costs while

improving overall process efficiency.

. Launched component outsourcing initiatives to drive manufacturing

efficiencies while slashing production costs.

. C.W.I. Certified with 25 years of welding experience.

Professional Experience

PRODUCTION MANAGER( RTI Energy Systems, Inc. Spring TX ( Feb. 2012 to Oct

7,2013

Managed over 100 employees and supervisors overseeing the direct plant

manufacturing and operations of the machine shop, along with two

fabrication shops with an influential and motivational leadership style,

accountable for achieving the manufacturing revenue plan, while managing

cost and driving efficiencies. Insured the safety and wellbeing of the

team. Some of my responsibilities included machining carbon and titanium

subsea stress joints up to 49' long, pull tubes out of carbon steel and

connectors for subsea raiser pipe. The Fabrication area specialized in both

high volume and custom fabrication while maintaining cost and schedule

performance through strategic staffing and planning. The high volume pipe

shop is fabricating production subsea raiser pipe to customers

specifications. I was directly responsible for the quality and

profitability of the products manufactured while maintaining a schedule to

the customers.

Quality Manager ( Navasota Oilfield Services Inc., Navasota, TX (

April/2011 -Feb.2012

Managed the implementation of ISO/TS 29001:2010 (API Q1) quality management

system for certification by API and the implementation of quality work

instructions using API requirements, API recommended practices and best

industry practices. Acts as liaison to customers and suppliers, and

provides guidance to all departments relating to documented procedures for

the quality system. Provides general support of continual improvement

processes and quality management techniques and facilitates application of

those techniques within the company. Ensures employee compliance with all

safety, environmental and regulatory guidelines and policies. Performs

routine audits of employee activities to ensure compliance with established

quality management system requirements and company policies.

Senior Manager of Manufacturing ( Aker Solutions, Katy, TX ( 2007-2009

Supervised the day-to-day manufacturing operations and staff, accountable

for the safety and well being of a team of managers tasked with building

derricks for drill ships, telescopic mask, and conventional derricks.

Direct responsibility for managing multiple manufacturing projects

including the preparation of job cost estimates, process implementation,

and equipment procurement, upgrades, and maintenance.

. Regarded as a derrick fabrication expert, Acknowledged and credited

with the force behind building and assembling the first plate box

column derrick at the facility.

. Assisted in the successful implementation of outsourced fabrication

processes with overall responsibility for vendor assessment and setup

and product inspection.

. Accountable for the profit and loss of the plant

. Implemented and enforced workplace safety standards, working with the

safety department in realizing an 18-month period without a lost time

accident.

Production Control Manager ( Orizon Industries, Inc., Brookshire, TX ( 2005-

2007

Managerial leadership and oversight of documentation control, programming,

and production departments, accountable for the leadership of a staff of

100+ in the execution of production projects including power plants,

chemical plants, compressor skids, and drilling rigs. Accountable for

defining material and labor cost estimates and for assisting with the

procurement of all relevant project material.

. Accountable for the profit and loss statement of the facility.

. Transformed an underperforming company operating at a consistent 5-

year loss to one operating at a profitable level within eight months.

. Instrumental in increasing productivity through the updating of

Computer Numerical Control (CNC) equipment, network and server

updates, and the restructuring of the welding department.

. Worked closely with the safety department to improve the safety lost

time accident record from an average of two every 30 days to zero in

six months.

Vice President of Operations ( Trinity Steel Fabricators, Trinity, TX (

1995-2005

Provided operational direction and leadership in managing the day-to-day

operations of three facilities and 120 employees in the planning and

execution of fabrication projects for chemical and power plants, gas

refinery repairs, and offshore girders for drilling platforms and

compressor skids. Managed the AISC certification program, training welders

and fitters in the trade.

. Instrumental in transforming operations that provided the resources

and strategy to take the company from a $4 million operation to a $30

million company during tenure as VP of Operations.

. Accountable for the development and compliance of safety department

procedures, leading teams to achieve a two-year period with zero lost

time due to accidents.

. Increased production by 50% with the management and implementation of

strategic facility and process improvements including the construction

of a truck dock and the expansion of the main facility operations.

. Accountable for the profit and loss of three facilities in three

different locations.

SUPERINTENDENT/MAINTENANCE MANAGER ( Trinity Industries, Houston, Tx 1978

- 1995 Managed the day to day fabrication and

manufacturing of multi-million dollar projects, like High Rise Buildings

"Three Allen Center" and "Enron Towers". While fabricating highway bridge

girders, heat curving 160' highway bridge beams with oxy/gas fuel torches,

on projects like "The Sam Houston Toll-way", Jumbo Boiler Girders for Power

Plants, Box Girders, Trusses, Skids and Railcar Bottoms. I had 9 direct

report Supervisors as well as 225 shop employees.



Contact this candidate