AMIR SHAUKAT
GharayAhmer Sherje Mukalla Yemen
Mobile No.: +967*********,+967*********
E-mail: **************@*****.***, *************@*******.***
PROFILE
Demonstrated accomplishments in a Electrical and Electronics
field with the broad range of related expertise for the past eighteen
years. Worked on Projects IRON&STEEL, FMCG,MEP,,PULP&PAPER,OAG,SECURITY&FIRE ALARM SYSTEM, and PLC system S7(Siemens). DCS
system ABB (Asia Brown Borvi) Distributed Control System also Trouble
shouting of AC/DC Drives programming and electrical control circuit,
electronic card, power supply unit reparing . also worked on autocad
drawings. And Generators & EOTcranes, Furnaces,Transformers,VCB, MV panels
Harmonic filter,33kv Substation installation, commission.(CHINT)
Carrier oriented jobs in a reputed organization in new
Projects Installation Modification and Electrical Panels PDB or Electronic
cards reparing side. Also handling break down and preventive maintenance of
plant Also documentation and implementation of ISO 9001 to 2000 and SAP
program, HACCP, ISO 14000 TO 14001.
WORKING EXPERIENCE
Head of Electrical Department.
> Mukalla Iron and Steel Company (Republic of Yemen) From 31/03/ 2010
to till present
Achievements :
To worked on project also control running maintenance on steel
plant SMS and Rolling Mill production .Work on autocad technical drawings
or some current modification by location installation errcetion
commissioning on project also testing Sms plant Megathrem and Continues
casting machine two stand Oxygen plant (Sanghi) 200 Cu.m/hr and Rolling
mill Siemens VAI also MV switchgear (L&T), Harmonics filters (AB
Solution),Furance Transformers 8.4 MVA 11kv to 1.135kv,VCB,LT panels
AC,DC,VSD drives, Furnaces and Instrumentation,33kv Substation power
transformer 30/40 MVA 33kv to 11kv .Switch gear,Compressor (Ingersoll
Rand), Weighing Bridge (DanWay) etc on time in agreed budget.
RO Plant Water Land (Turkey) & WTP (Sideridraulic) Itly. Complete
Engineering Work. Electrical Network Designing, Single line Diagram
Preparation, Total Load Calculation, Motor Control Panel and PLC S7-200
system designing, Technical Submits preparation and took approval from the
client. Complete Project Management up to final hand over to the client
MISC.
Project Engineer in SMS capacity 100000 T/Y Billet and Rolling Mill of
capacity 300000 T/Y Rebar & Section mill & Steel Melting Shop (Ind. F/c 18T
X 2nos.,LRF 20T) & Billet Caster- 6/11. Project-Erection & Commissioning
of Rolling Mill,SMS & Caster, 4.7 MVAR Harmonic filter (SVC)
5TH,7TH,11TH, Balling m/c & shredder m/c (Jain Hydrolic) for scrap
.Control the Manpower & Spare parts also Management planning, Shut Down &
Preventive Maintenance and Power Distribution.
Job Description:
Execution and supervision of Maintenance Activities of
Instruments, Control Systems and Electrical equipment at steel plant floor
level. Major Responsibilities/Duties: Good understanding of preventive,
predictive and corrective maintenance tasks and is fully aware of the
importance of proper workmanship and
Technical competencies :
1. Complete understanding of key electrical engineering principles.
Demonstrated expertise in circuit design and analysis. Strong
knowledge of other engineering principles.
2. Synthesize and develop complex electrical circuit designs to the point
of manufacture and release to production or lead teams in this effort.
Works independent of technical supervision.
3. Evaluates and applies design trade-offs and constraints for design
optimization. Skilled in the use of advanced analysis tools and
methods.
4. Has advanced understanding of test methods and analysis tools to solve
technical problems.
5. Solid understanding of manufacturing and test principles. Able to
apply design trade-offs.
Prepare electrical maintenance plans & Follow up the execution.
6. Make failure analysis & Put the suitable countermeasures.
7. Prepare technical reports & submit to the Technical manager.
8. Prepare spare parts budget and follow up providing the needed
Electrical Spare parts
9. Upgrade electrical Equipments to achieve better performance.
10. Manage internal Affairs for Steel plant electrical section.
11. Coordinate between steel plant operation, mechanical section & other
sections.
12. Study and prepare technical reports and modification proposals to
avoid troubles repeating.
WORKING EXPERIENCE PAST
> Yemen Company for Industry and Commerce (YCIC) HAYEL SAEED
ANAM GROUP (Republic of Yemen, Taiz) ISO 9001 certified
from 12 July 2009 to19 feburary 2010.
Electrical Engineer
Designing and Modification of Siemens PLC S7-300, using
Simatic Manager software, Designing Of Electrical control panels using
PLC, inverters, Pneumatic systems, interface relays, photocells,
contactors and more,
Repairing of Different types of Electronics Cards like DC motors, Power
Supplies, Inverters, Industrial Instruments, pressure switches Analogue and
Digital Temperature controllers, battery chargers. Timers, etc
Maintenance of different type of Processing (American, Italian, German,
etc) machines, installation of new Electronics and Electrical Items
Maintenance of Automatic control feeding and processing systems,
controlling through Photo cells and solenoid valve,
Calibration and repairing of Different type of digital scales, load cells
and Temperature controllers, as per ISO standard.
Routine wise preventive maintenance of Plant, overhauling of Different
types of Electrical motors, Installation of Forward Reverse, Star Delta,
ON and OFF motors with Electrical control and relay logics. Moving Panels
from one place to another
Reconditioning of old machine, making Electrical Drawing using CAD
software, Reviewing Old diagrams into standard system
Errection and commissioning of Packing machines and wafer line, wiring of
PLC S7-300 connections and Troubleshooting.
Handling separate projects as per requirement of Management, Markem,
Domino printing machines installation and maintenance
Daily report writing.
My duty was worked as a shift controller if any problem come on running
production then sortout with in short time also I have good experience in
maintenance side. Electrically modification in wafer plant also
installation new food processing machines.Chocolate processing
machines.Ovens.Wrapping Machines.
> ARJ Engineering Services Ahmed Ramadhan Juma est. (SONAA
PUR DUBAI) MEP Building system And Medical Waste Treatment
Plant from 29 December 2008 to 12 may 2009.
Electrical supervisor
My responsibilities work for reviews and monitoring of
activities on technical issues with focus MEP Building system engineering
development environment. Also
Excellent communication skills in English and Arabic. Installation data
address system.telephone.smatv.firealarm system.wiring.coduting.power
system.bms system.etc according to drawing work done on it.Till complele
this project.
> Yemen Company for Industry and Commerce (YCIC) HAYEL SAEED
ANAM GROUP (REPUBLIC OF YEMEN, TAIZ)
ISO 9001 certified from 7 May 2005 to 6 May 2008
Electronic Engineer
Installation and designing also modification new wafer line and fault
finding in electrical panel or electronic card repairing sides. Siemens S7
PLC system invertors (Sew, Dan Foss, Micro master, Lenz) working with
German engineer at the mixing area Tecon Company. baking oven, Franz
Haas (Austria) wafer cutting books of Tecon Company, chocolate processing
equipment (Metra, Italy), also cooling system and wrapping machine of Hi-
Tech Company (Italy) and date printing machine Domino (U.K) and Cartoon
packing machine Bedo ( Germany ).
> Al-Hushani Group of Industries National Cartoon Factory
Al-Hushani Plastic Factory (KINGDOM SAUDI ARABIA
Al-Riyadh) Sonya Industrial Area from April 2004 to
October 2004
Electronic Engineer
My responsibilities were to Installation and maintenance the machines
and solved the electrical and electronic problems in corrugation plant.
Computech (Taiwan). Extruder sealing or bag making machine (Himengston
Taiwan) Cartoon folder machine Emba.
> ADESCO COMPANY (UNITED ARAB EMIRATES
ABU-DHABI) Electra Road from May 2002 to July 2003
Electronic Engineer
Installation and eraction and commissioning of automatic gates
and fault finding the problems in electronic card programmer in gate
controlling units, barriers, sliding gate, swing gates, gate operator,
remote system, magnetic card, transmitter and receiver in hotel, airport,
supper mart, and villas access control, industrial, security and parking
system.
> PACKEGES LIMITED (Pulp & paper industry) AMER SIDHU LAHORE
(PAKISTAN) ISO 9001 Certified from October 1996 to April
2002
Maintenance Superintendent
Specialized in continuous process chemical or pulp plant DCS system,
distributor control system. ABB (Asia Brown Borvi) handling the breakdown
of plant, pneumatic and fault finding the level control flow valve (Fisher)
calibration also solved the problems in electrical panel motors, display
meter.
> OFFICE AUTOMATION GROUP (OAG) Panasonic Company (PAK) from
30 Davis Road, Lahore from March 1995 to Sep 1996
Associate Electronics Engineer
Installation of new fax and photocopier machine in
offices, repair the machine and fault finding electronic card, power supply
card, also trouble shooting and overhauling machine, Panasonic and Konica
etc.
> AKBAR T.V. CENTER
86-E Allama Iqbal Road Lahore (PAK) from July 1992 to Sep
1994.
Electronic Technician
Troubleshooting the problem in house appliances
e.g. T.V, CDs, Cartapes, mobile phone, repaired different companies.
EDUCATION:
B -TECH : (Bachelor Of Technology
Electroincs) 4yr,66.3%
From Preston
University.Islamabad. Pakistan
AEE : (Associate Engineering
Electronics) 1992-1995 (first division)
From Ahmed Hassan Poly Technical
University, Lahore.
DCH : (Computer Hardware) 1997
(first division)
From Punjab Computer College,
Lahore. Pakistan
HSC : (Science) 1990-1991
(first division)
From Federal Board, Islamabad .
Pakistan
DOMINO UK : (Date Printing Machine) 2008
Training Certificate
From,Taiz.
Yemen
TECON GmbH : (Spezialmaschinen) 2007
Experience Certificate
From,Taiz.
Yemen
PERSONAL DATA:
Father's name : Shaukat Ali (Late)
Nationality : Pakistani
Religion : Islam
Date of birth : 01.03.1974
Passport No : AA-5192712