Post Job Free

Resume

Sign in

Quality Control Power Plant

Location:
San Diego, CA
Posted:
July 28, 2014

Contact this candidate

Resume:

Confidential Resume of:

DAVID KHALAF

**** ******* ***** **, # **

San Diego, Ca 92115

ace44d@r.postjobfree.com

405-***-****

Accomplished in the areas of project management, senior superintendent, quality control, and material

management. Exhibit leadership qualities with the ability to direct, motivate and supervise personnel to

achieve maximum productivity. Attention to detail and strong follow through; able to establish priorities

and manage multiple tasks simultaneously with innovative problem-solving and decision-making

abilities.

Assurance activities for Commercial, Industrial/Retail, Military, from ground up- GSA, Corp Of

Engineers, NAFAC, USAF, USCG, USMC and FAA. Both internationally and domestic

Value Engineering and design built. Formulate insightful cost estimates, bid proposals, Contracts, RFI,

RFQ,,CMP,PPC Scope of works, change orders, Buy out, developed and implemented operating

procedures and construction schedule, RMS, QCM, SWPPP

LEARNING CREDENTIALS

1985/BS/Construction Management/San Diego State University, California

1982/AS/Engineering/Saddleback Collage-Mission Viejo, California

1983/ Project Management Professional Certificate/OCC-Costa Mesa, California

2014 Current enrollment SDSU Fall Semester Civil Engineering

2014 P.E Exam scheduled Oct 2014

P ROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)

2011/USACE/Construction Management Course 2014-2016/Basic First Aid, CPR and AED

2013/OSHA Construction Safety & Health (30 Hours) 2009/OSHA Construction Safety & Health (10

2009/OSHA Construction Safety & Health (30 Hours) Hours)

2013/ATL1 Certificate 2013/Environmental Compliance Assessment,

Primavera 3, RMS, Pro log, Sure Trac Training and

Tracking System

CAREER TRACK

Flour/ Richard Brady and Assoc

Triple Hat- Senior Superintendent, QC, SSHO Kittery Maine

6 million, Building 42 Historical Renovation, Building 375 and 342 5 million

Supervised, conducted the Quality control program and implemented Safety program following

EM 385 1.1 Total of 25 million in project including a historical renovation

Nov 2013 to Present

Lakeshore Toltest

Quality Control Mgr Bagram, Afghan

Fire Station, Fighter Hanger, Rigging Facility

56 million Supervised 3 quality Engineers and projects May 2013 to Nov 2013Construction of a

36,600 sq. ft. High Bay Aircraft Maintenance Hangar at Bagram AB, Afghanistan. This hangar is required

to house various flights of the 455th Expeditionary Maintenance Group which perform disassembly,

inspection, repair and storage of aircraft and their components used to support Combat Air Support

operations throughout Afghanistan

Triune/ Beck

Senior Superintendent and Quality Control Mgr, Tinker AFB, OK

76,000sft total remodel 2 story Navy Operation Building

NOAA- National Weather Center 28 mill ground up, Tuscaloosa, ALDesign-Build of a new 60,000 sq.

ft. National Weather Center facility for the National Weather Service and University of Alabama that

includes laboratory, training space, administration, and conference. This project also receive a LEED

Gold Certification from the USGBC

March 2012 to May 2013

Security Construction

Senior Superintendent and QC Manager Cutler, ME

Mechanical, Quality Inspection of Power Plant

Contract based assignment

Aug 2011 to March 2012

Parsons,

Corp of Engineer Tuscaloosa, Al…. QA/QC

Quality Assurance Inspection and Quality Control

Worked side by side with Corp of Engineers to monitor Storm clean up

Contract-based Assignment

June 2011- Aug 2011

Parsons

Corp of Engineers QA Homestead, Fl... Senior MEP Inspector QA/QC

Mobile District, as the Senior Quality Control MEP Inspector on eight (8) projects at Homestead AFB,

Florida. These eight projects ranged from $100K - $32M. Responsibilities for the COE included

providing QA/QC inspections for each of projects assuring each Prime Contractors met their QC contract

requirements. Assisted Corp of Engineers Contract-based Assignment

April 2010 to June 2011

BARNHART-HEERY

Quality Control Mgr NAVAC... China Lake, Ca

90 MILLION- Design Build, GOLD LEED WEAPONS Testing Facility, from ground up

Feb 2009 to April 2010

ALLUTIQ

Senior Superintendent/ Safety

GSA- Port of Entry- US/ Canada 27 Million Border Patrol facility from ground up, Portal ND

Jan 2008 to Feb 2009

KBR

Senior Superintendent- Iraq

Hangers and fire station 46 million

March 2006 to Jan 2008

KEY CONSTRUCTION

Estimator/ Superintendent, Health and Safety

Wal-Mart Stores, Wal Greens, and 3 Months secured 4 contracts. Built Wal-Mart Super center 213k sift

from ground up to completion and Wal Greens,

May 2004 to March 2006

PARSON

ARMY CORP OF ENGINERRS, EGLIN AIR FORCE BASE, FL, Ft Sill, Ok

SENIOR INSPECTOR MEP, VARIOUS PROJECTS RANGING FROM 2 MILLION TO 16

MILLION

Contract –based Assignment 2003 to 2004

T.O.N CONSTRUCTION

Senior Superintendent, Health and Safety.

Tilt walls. Projects included: Joe Cooper Service Center- Midwest City, Jackie Cooper BMW

Dealership Tilt-up’s Edmond, Ok, Contract-based Assignment 2001 to 2003

PARSON

ARMY CORP OF ENGINEERS, SAN ANGELO, TX

SENIOR INSPECTOR QA VARIOUS DORMS AND PROJECTS

Contract- based assignment 1997 to 2001

AMERICAN

PROJECT MANAGER: ESTIMATING & SENIOR SUPERINTENDENT, QC 1992 - 1997

ined cognizant of building costs, manpower requirements and local code requirements. Previous projects

include: Mid- Rise (7), Office parks, School K-12, Tilt up,

Retirement/Nursing center, Strip malls, Retail, Medical, Prison and T.I improvements, Military

Housing, Training Center, Hangers Multifamily 5mil to 47 mil

68 MM Federal Prison, U.S, Federal Bureau of Prisons, PROJECT MGR, SUPER

Aircraft Hanger, NWS, Seal Beach, CA PROJECT MGR, SUPER 9 Million

Military Housing NWS Seal Beach, CA PROJECT MGR, SUPER 14 Million

BALDWIN BUILDERS

Project Superintendent 1985 to 1992 Irvine Ca

Built single family, condo and town homes Yorba Linda, Orange and El Toro



Contact this candidate