Work Experience:
S.NO COMPANY NAME EXPERIENCE RESPONSIBILITY
1. BHUSHAN STEEL LIMITED 1.10 YEARS COMPLETION OF PROJECT
ANGUL. (From July OF 4.3m RECOVERY TYPE
2008 to COKE-OVEN(Chinese
2010.) tech.) WITH
MAINT.(stamp charging)
2. ELECTROSTEEL LIMITED 3 YEARS COMPLETION OF PROJECT
BOKARO. TILL( From AND COMMISSIONING &
june 2010 t0 MAINTENANCE OF 4.3m
2013) NON-RECOVERY
COKE-OVEN(Chinese
Tech.) WITH
MAINTEINANCE AS SHIFT
INCHARGE.(stamp
charging).
3. BOKARO STEEL PLANT. 1MONTH. ON JOB TRAINING IN
7.3m TOP CHARGING
COKE-OVEN.
4. USHA MARTIN TATANAGER June 2013 T0 PROJECT & COMMISSIONING
(JH) TILL. & MAINTENANCE OF
HORIZONTAL COKE-OVEN
PLANT(Chinese Tech.) AS
ASST. MANAGER.
Company Profile:
S.NO COMPANY NAME PROFILE
1. BHUSHAN STEEL 4.6 MTPA WITH BILLET,HR COIL.
LIMITED ANGUL.
2. ELECTROSTEEL 2.2 MTPA WITH DI PIPE, WIRE ROLLMILL,BAR
LIMITED BOKARO. MILL.
3. USHA MARTIN .7 MTPA WITH WIRE ROLL MILL.
TATANAGER (JH)
Job Responsibilities ;
Project Stage # To ensure safety and quality at the green field
construction site of coke-oven plant and associated equipment. Ensure
the safe and reliable commissioning of coke-oven in allocated time schedule
of project.
To interact with technology suppliers and the consultant for
ensuring the interface engineering and overall completeness of Mechanical
equipment of coke-oven.
Ensure the completeness and integration of all coke-oven mechanical
equipment.
Manage the mechanical maintenance activities at coke-oven to prevent and
control failures.
Manage the mechanical maintenance repair activities at coke-oven to
ensure timely availability of machinery.
Manage safety, health and environment (SHE) in the coke-oven
department of Mechanical Maintenance to ensure adherence to statutory
requirements.
I am working as M-3 in mechanical maintenance of coke-oven plant. &
completion of 3 project on time with team work. I am successfully
commissioned of 3 coke-oven project 1 recovery & 2 non-recovery.
INVOLVE IN USHA MARTIN
1- involve in project,commissioning & maintenance of Horizontal Coke-
oven plant.
2-
INVOLVE IN ESL BOKARO
1-Fabrication,Erection,Alignment & Maintenances of Gallery Structure &
Equipment,
2-Erection of Guide car, Quenching car, Stamping unit.
2- Making of PWI/SWP of all Equipment of Material Handling.
3- Making & follow up of Maintenances Schedule of Every Equipment of
Material Handling.
4- Making of Spare Part List of Material Handling.
5- Making of Spare Part Drawing.
6-Making a Purchasing Requisition of Spare Parts.
7-Making & follow up Lubrication Schedule for Zero Break Down.
8- Attending all type of Brake-down in order to provide the 99% of Machine
for production.
9-Monitoring the Record downtimes of machines in a logbook.
10-Check Logbooks & Reports to the concerned for corrective actions.
11-Declaration of Daily Maintenance time based on the pushing sequence.
12-Check Staff & Workmen Availability.
13-Preparation of Schedule, Preventive and Break down Maintenance to carry
out the same time to time.
14- Maintenance of Pusher Car Cum Charging Car, Guide Car, Quenching Car,
Stamping Machine, Coal & Coke-Route Machine & Conveyor.
15-Material management & resources mgt.of incoming material during project
time.
INVOLVE IN BSL ANGUL.
1- Planning for the erection & erection of equipment in cold blast area,
desulphurization area, ammonia section,
benzene section, &in oil depot . Equipment.
2- Erection of the pipes of SS & MS dia. 15mm to 1800mm dia. fittings,
paints& other fittings.etc.as per drawing.
3- Checking the alignment of all equipment like blowers,pumps, compressor,tanks, agitator, fan .etc. as per drawing.
4- Fabrication & erection of the pipe of dia more then 600 mm etc.as per
drawing.
5- Stores correspondence, on time in full delivery to internal customer.
6- Effective utilization of resources.
7- Manpower planning & handling.
8- Testing of the hydraulic pipe.
9- Erection of the steam line up to 5km.
10-Testing of the tanks, pipes, etc.
11- Planning for the storage of equipment in site yard.
12- Development of land for the storage of equipment.
13-Procurement of material for project
14-Meeting with Chinese regarding the material, drawing.
15-Material management & resources mgt.during project
Educational Background:
S.NO QUALIFICATION SCHOOL/BOARD/INSTITUTE/UNIVERSITY % DIVISION
1 10TH D.A.V PUBLIC MAJHGAWAN 63.67 1
(PANNA)/CBSE (2001)
2 12TH D.A.V PUBLIC MAJHGAWAN 63.8 1
(PANNA)/CBSE(2003)
3 B.E TIT BHOPAL/RGPV BHOPAL(2008) 76.9 1(HONOURS)
(MECHANICAL)
4. MBA (OPR.MGT) SMU(2012) 67 B GRADE
Vocational Training:
. BHILAI STEEL PLANT BHILAI
Project:BIO-DIESEL SYSTEM
Organization: TIT Engg. College, BHOPAL.
Team size : 4
Role : Team-leader
Duration : Two month
Computer Proficiency:
Diploma in AUTOCAD
Operating System: Windows98/2000/XP, MS DOS
Office Automation: MS- Office (Word, Excel).
Extra curricular activity:
Active member of PARWAZ, the organizing committee of ME department and
organized many technical and cultural activities..
Participate in mathematics olympaid
Hobbies:
Playing Cricket
Listening music.
Personal Details:
Permanent address : Village- Majhagawan,Post -N.M.D.C Majhagawan
Distt-Panna.(M.P).488101.
Father's Name : Mr. S.L SAHU
Date of Birth : 15/07/1984
Sex : Male
Nationality : Indian
Marital Status : Married
Current Salary Drawn :
Salary Expected : Negotiable
Current Experience : 6 YEARS
Category : OBC
Declaration:
I here by declare that the above-mentioned data are true, complete and
correct to the best of my knowledge and belief.
Date; 15/5/2014.
Place: Tatanagar
(HARGOVIND SAHU)