JIM WEISHENG GUO
*** ****** ****, *********, ** *0016, USA
(:678-***-****, E-Mail: ******@*****.***
Global/China Manufacturing Expertise with strong background in Supply Chain
Management/Strategic Sourcing, Manufacturing Operations, Engineering,
Quality Assurance, Lean-Sigma Continuous Improvement AND Manufacturing
Problem Solving.
Hands-on experience with: Global Sourcing & Supplier Management, Capital
Projects, Plant Management, Manufacturing Operations, Materials
Management, Master Production Scheduling, SIOP, Global Logistics,
Statistical Analysis Tools, Value Stream Mapping, Lean-Sigma, Quality
Assurance, Root Caused Analysis/8D, Lean Production, Engineering in
Metal, Plastics manufacturing processes, Casting (Gray Iron/ductile
iron/carbon steel/stainless steel/alloy steel/aluminum/zinc/brass in
process of sand/investment/die/permanent mold casting), Injection,
Machining, Stamping, Coatings, Assembling, Testing and other MFG.
Processes.
Attributes: Proven and demonstrated leadership ability, Very good
Communication & Interpersonal Skills, Team Player as well as strong
Individual Contributor, Critical Thinking, Data Analysis Skills,
Situation Analysis & Problem Solving Skills, Negotiation and
Prioritization Skills, Thrives under Pressure, Adaptable to Change.
Strategic as well as Hands-on style; shop floor, day-to-day leadership by
example.
Technical Expertise: Fluent in Mandarin Chinese & English, Advanced
Computer Skills including ERP (QAD, Epicor), CAD (AutoCAD, Solidworks),
Inventory Analysis tools (ABC, VED, SDE, FSN, HML and XYZ) and
Statistical Software Tools (R, PAW, KNIME and ROOT)
More than 20 years of experience with:
o Created and managed the Global Supply Chain system, Strategic Sourcing
system, continuously improved and re-evaluated the purchasing activities,
optimized total cost while increasing reliability, continuous Improving
quality, customer service. Directed and hands-on experience with
purchasing, sourcing, contract negotiation, supplier partnership
management, category management and import & global logistics processes.
Sourcing & managed suppliers in the countries of US, China, Mexico, and
India.
o Created and managed the Global Supply Chain system, a cross function &
involved in producing and delivering a final product from the supplier's
supplier to the customer's customer, through steps of Planning,
Execution, Performance Measurement and Integrating Functions in the
Supply Chain. Managed Information about demand, the flow of physical
goods, the manufacturing process and the money.
o Created and managed the Global Strategic Sourcing system, continuously
improved and re-evaluated the purchasing activities, through steps of
assessment of current spend and the supply market, total cost analysis,
identification of suitable suppliers, developed Sourcing Strategy (where
to buy what considering demand and supply situation, while minimizing
risk and costs), negotiation with suppliers, implementation of new supply
structure, and track results and restart assessment.
o Created the Global Supplier Total Cost Monitoring program with currency
exchange rate, transportation, global supplier country economy/labor/raw
material/utility costs changes, resulted the forecasting trend.
o Created global sourcing strategy to leverage the Company's purchasing and
organizational capabilities. Optimized total cost(quality, service,
delivery, and price) while increasing reliability, continuous Improving
quality, customer service, and generating sustainable revenue/EBITDA
gains; Implemented strategic supplier development, quality management
processes, and evaluate and measure performance; Implemented better
processes for inventory management and maintain a reliable perpetual
inventory system; Established alternative supply sources - adopt best
practices and develop supplier management strategies; Developed and
motivated a high performing team with a focus that is in sync with
corporate objectives and strategic procurement initiatives.
o Developed productive strategic sourcing & supplier partnership management
in Asia including vendor select, contract negotiation, on site audit,
monitor performance, communicate constantly, rating suppliers, checked
out quality and stability of manufactured products. Directed suppliers on
its quality assurance system improving, supply chain system establishing.
o Reversed growth trend in production material costs. Established climate
of constant cost reduction. Achieved multi-year multi-million dollar
savings across multiple commodity lines.
o Led cross functional & multinational team to develop standardized global
supply chain practices resulting in $1.1M+ in savings, and improved the
delivery on time from 50% to 99%.
o Directed, managed and participated in purchasing, sourcing/contracting
process for castings & stamping parts with material of
carbon/alloy/stainless steel/iron/aluminum/zinc, plating chrome/nickel
process parts, powder metal parts and the tooling/molds/patterns.
o Integrated the supplier development function. Established a data driven
supplier-rating system resulting in measurable reductions in the number
of supplier quality, delivery and response issues.
o Established a data driven monthly supplier performance rating system
which increased supplier performance by more than 40% in the first six
months of implementation.
o Directed and experienced import/export process and global logistics.
o Led sourcing activity to achieve both strategic and operational success
for launch of new products in support of goals and priorities established
by the company.
o Global/China manufacturing operations expertise in all aspects of
operations. Increased sales from zero to $120 million. Created and
managing production management system in compliance with optimization of
productivity, quality, cost, delivery, safety and morale, and generating
sustainable revenue/EBITDA gains. Created and managing inventory policy,
production plan and master schedule, material requirement plan,
operations schedule and production control, material management,
purchasing and warehousing, traffic and distribution. Directed equipment
maintenance, safety management, P&L management and budgeting. Familiar
with USA and Chinese labor law.
o Lean-Sigma continuous Improvement leader for 6 years. Directed and
deployed Lean and Six Sigma into company operations. Built the Lean
culture, facilitated lean tools into manufacturing operations, and
implemented lean continuous improvement processes including Kaizen
events.
o Built and managed quality assurance system in compliance with
ISO9001/TS16949 standard. Implemented quality assurance process,
allocation of resources, authority and responsibility, and monitoring of
results. Managed on a hands-on basis, directed roots caused analysis,
corrective & preventive action, and quality continuous improvement.
o Experienced Capital Projects, starting new operations, taking them
through growing pains and through rapid increases in capacity
development. Established the brand-new manufacturing facility, design
manufacturing processes & equipment selection & layout. New Product
Developed (NPD) through 8 steps.
o Applied and gained broad engineering & manufacturing expertise in
materials, casting, stamping, CNC machining, injection molding, coatings,
fabricating, welding, heat treatment, coating finishing, assembling, lab
testing, quality inspecting, and tooling & fixtures.
(For achievement in details, please see the Enclosure)
PROFESSIONAL EXPERIENCE
RATO NORTH AMERICA/DENVER GLOBAL PRODUCTS, INC. Lincolnton, NC, USA,
08/2012 - Present
Executive Vice President, Operations
Responsible for set up new manufacturing operations and run the operations,
including Sourcing, purchasing, manufacturing, planning, production, QA,
engineering. Set up QA system, manufacturing operations, new production
facility and assembly line, new products production. Products including
Power Tools, Generator, Motorcycle, etc.
TP ORTHODONTICS CHINA, (TP ORTHODONTICS USA's subsidiary, US based business
in China), Wuxi, China, 01/2012 - 07/2012
General Manager
Fully responsible managing TP's China operations, including marketing &
sales, production & scheduling, manufacturing process management, staffing,
purchasing, engineering, QA/QC & inspection, inventory control,
distribution & global logistics, P&L management and budgeting.
SHENGDONGBANG AUTOMOTIVE PARTS & COMPONENTS CO., (Stonebridge Industries,
Inc's subsidiary, US based business in China), Hebei, China, 02/2005 -
01/2012
General Manager
Fully responsible 1). Establishing the brand-new manufacturing facility,
design manufacturing processes & equipment selection & layout, shops &
production lines of Casting/machining/assembling. New Product Developed
(NPD) through 8 steps. 2). Managing China operations, including marketing &
sales, production & scheduling, manufacturing process management, staffing,
purchasing, engineering, QA/QC & inspection, inventory control,
distribution & global logistics, P&L management and budgeting. 8 department
managers direct reports and 500 indirect reports, which including Marketing
& Sales Dept Manager, Production Dept. Manager, QA Dept. Manager,
Purchasing & Logistics Dept Manager, Engineering Dept Manager, HR Dept
Manager, Accounting Dept. Manager, Shops Manager
(Casting/machining/assembling).
STONEBRIDGE INDUSTRIES, INC, Conyers, GA, USA, 05/1999 - 02/2005
Director, Supply Chain & Quality & Engineering
Responsible for Supply Chain, Quality and Engineering. (Including global
sourcing/supplier management/ purchasing/inventory control/logistics,
Quality Assurance and Engineering. Sourcing from US, China, India and Asian
countries.
STONEBRIDGE INDUSTRIES, INC, Conyers, GA, USA, 01/1996 - 05/1999
Manager, Global Sourcing & Supplier Quality
Responsible for global sourcing & supplier management, purchasing, quality
assurance, logistics. Sourcing from US, China, India and Asian countries.
PREMIER INTERNATIONAL, INC., Covington, GA, USA, 06/1991 - 12/1995
Manager of Global Sourcing & Supplier Quality
Responsible for sourcing, supplier management and supplier quality, in
consumer products. Sourcing for Power tools, hardware, etc from US, China,
India and Asian countries.
MILLIKEN & COMPANY, LaGrange, GA, USA, 1989 Summer Intern
Consultant, Carpets Division. Consulted carpet market in China. Completed
the Market Research Report.
CHINA NATIONAL PACKAGING CORP., Beijing, CHINA, 06/1985 - 07/1988
Manager, Equipment Engineering, Responsible for Engineering, including NPD
and process engineering.
LISHU PAPER MACHINERY COMPANY, Jilin, CHINA, 08/1982 - 06/1985
Mechanical and Process Engineer,
Experienced machinery making process in casting, stamping, fabricating,
welding, machining, finishing, assembling, etc.
EDUCATION
. DUKE UNIVERSITY THE FUQUA SCHOOL OF BUSINESS, Durham, NC, USA, Master of
Business Administration (MBA), 1991
. RENMIN UNIVERSITY OF CHINA, Beijing, CHINA, E. B.S. in Industrial
Engineering, 1988
. SOUTH CHINA UNIVERSITY OF TECHNOLOGY, Guangzhou, CHINA, B.S. in
Mechanical Engineering, 1982
TRAINING
. Six Sigma Championship Training (2007)
. Lean Manufacturing Training (2006)
ENCLOSURE - Achievement in Details
o Directed and deployed Lean Manufacturing philosophy focusing on
eliminating the 7 wastes and tools into company manufacturing
operations, including VSM (Value Stream Mapping), SMED (Setup Time
Reduction), TPM (Total Productive Maintenance) and Kaizen Events.
Integrated six-sigma concepts into lean manufacturing systems.
o Built the Lean Enterprise system from zero to increased multi-million
dollar profitability by created and developed Lean Enterprise
Deployment Strategy includes steps: Planning and Executive Development
- Building the Foundation for a Lean Culture - Implementing Lean
Improvements - Evaluation, Continuous Improvement, and Sustaining a
Lean Culture.
o Designed and implemented operation Value Streams Mapping. Analyzed
existing physical and information flows based on the drawing of
current value stream map, and designed a optimize the lay-out of the
plant with the flow of materials and information, created the whole
operation's Value Stream Map by eliminating wastes, focusing initial
efforts on a critical area, with elements of Material Flow, Inventory,
Buffer stock, Suppliers, Customers, Material Transport, IT System, and
Information Flow.
o Used Kaizen disciplines to implement the lean enterprise for
continuous improvement. Directed, led and participated weekly Kaizen
Events, with steps: Planning - Implementing - Follow Up - Evaluation,
started 5S Visual Workplace, and following of inventory reduction and
over-production reducing, motion, reducing waiting time, reducing the
over-processing/rework, defect reducing/improving quality, and
unnecessary transportation reducing.
o Established and participated the 5-days Kaizen Event Plans (Kaizen
team member selection, Kaizen charter approval, Location preparation
(including equipment, materials, etc.), Data needs identification and
preparation), within the 6 Sigma DMAIC framework, seeks to define,
measure, and analyze the process that be the Kaizen focus.
o Directed and participated the Kaizen Events implementation, primarily
focused on actual improvement additional measurement and analysis,
including Train members of the Kaizen team on the Lean principles that
they will be applying, Review the VSM, and perform additional
measurements and analyses - Facilitate an ideation/brainstorming
processes to identify improvement options - Implement improvements by
"breaking apart" the process and putting it back together without the
waste - Prepare an action plan with a list of activities required to
complete the Kaizen process - Verify the alignment of the selected
improvements with the future state VSM - Identify expected measurable
improvements - Obtain participant feedback - Report Kaizen results to
Champions and celebrate success.
o Directed and participated the Kaizen Events Follow-up, completing the
improvement and control DMAIC elements, on timely completion of the
Improvement process and effective change management, including
Following-up to ensure that action items are successfully completed,
Working with Lean Champions to breakdown obstacles, Measuring the
actual results of the Kaizen to document and quantify benefits, and
Establishing process control to ensure the ability to consistently
obtain improved performance.
o Directed and participated the Kaizen Events Evaluation process for
recognizing Kaizen as a continuous process of improvement, including
Identifying improvements to the Kaizen implementation process,
Encouraging employees to identify further improvement opportunities,
and Establishing a schedule to re-evaluate the VSM and start a new
Kaizen improvement cycle.
o Designed and implemented numerous control charts, pivot tables and
OLAP queries to provide real time parameter tracking for all
departments, resulting in significant improvements in process
efficiency and reliability.
o Directed and designed company training program strategy with
formulation instructional objectives, developing learning experiences
to achieve the objectives, having performance criteria to be met, and
obtaining evaluative information.
o Directed the implementation process through assessment phase with
organizational analysis, task analysis, person analysis behavioral
objectives, training and development phase and evaluation phase.
o Directed and developed internal training & education programs to
better leverage consultants and resources. Directed and trained
Lean/Six-sigma and other project teams.
o Directed and developed 4-week training program for new employees.
Reduced learning curve and improved employee productivity by 85%.
o Achieved significant performance improvements in Lean-Six Sigma
implementation:
- Improved the products quality from six sigma level from 3.3 to
4.4, and the new products to 5.0. Reduced quality defects by 26%
while reducing quality auditor positions from 12 to 2. Reduced
internal scrap rate 40% and improved the productivity 25%.
- Inventory reduction $1.2 Million from 123 to 62 days cover.
- Freight reductions respectively on freight budget achieving 49%
and 15% Synchronized flows 90%.
- Lead Time reduced 32%, productivity increased 52%. Customer
satisfaction improved.
- Improved on-time delivery from 73.4% to 99.8%.
- P&L savings: $806,000 in: Reduction in cost of goods sold from
36.2% to 33% yielding $376,000 in incremental gross profit and a
reduction in expenses from 45.2% to 38% yielding $385,000 in
profit.
- Gross Margin 31% to 42%, Operating Margin 12% to 26%, working
capital avoidance $1.6 Million.
Created the company's China Business Developing Plan, including the
Mission & Objectives, Situation Analysis/SWOT Analysis of internal and
external environment(Customers, Competitors, Market trends, Suppliers,
Partners, New technology, Economic environment, China Social & Legal &
regulatory environment), Risk Analysis; Strategy Formulation
Marketing/Product/Pricing/Promotion/Distribution), marketing &
manufacturing through joint-venture/acquisitions, implementation process,
identifying the required resources (Equipment/Labor/Production/Storage),
identification and evaluation of alternative strategies, final
determinations.
. Established the joint venture with a local Chinese company, the
Shengdongbang Automotive Parts & Components Co, and finished the
acquisitions of its whole business in one year late.
. Reorganized the joint venture and established the brand-new manufacturing
facility of the China subsidiary, selected & sourced the production
equipment, including electrical induction furnaces, die casting
machines/cold-chamber for aluminum, hot-chamber-zinc, trimming machines,
plastics molding machines, CNC machines & vertical & horizontal machine
centers, mills, punch machines, laboratory test instruments & inspection
devices (CMM, spectrometer, Metallograph, x-ray, measurement devices,
etc.), material handling equipments, utilities (electrical power, air
pressure system & water cooling system).
. Conceptualized, planted and initiated the subsidiary operations, created
the company processes, policies and procedures.
. Managed the workforce and successfully established the new operations in
the subsidiary in one year.
. Established and organized the subsidiary manufacturing shops, including
casting/heat treatment, Plastics Molding, machining,
stamping/fabrication/welding, coating, assembling, tooling & fixture and
the inspection laboratories (mechanics/chemical lab, dimension/gages lab)
within the 240K square feet manufacturing facility.
o Created the China Automotive Parts & Components Market Research &
Marketing Plan, details in market segmentation, customer and buying
behavior, marketing strategy (Product, Price, Place and Promotion), and
brand management. Determined products fit Chinese market, generated the
strategy of sales techniques, business communication, and business
developments. Build strong customer relationships and created value for
customers. Created communication and delivered value to customers and for
managing customer relationships.
o Established marketing management system (inside and outside channels) and
distribution system. Concepted a highly targeted Group Sales Solicitation
program.
o Led the developed and implementation of annual marketing plans that
resulted in consistent sales increases. Played a key role in achieving
sales increased from zero to $120 million.
o Drove the development and implementation of media
strategies/advertisings(Television, Internet, Trade show) that resulted
in improved efficiency and accelerated sales growth and profitability.
Resulted growth 35%.
o Implemented successful sales promotion resulting sales increases of 18%
and profit increases 26%.
. Directed & approved the production forecasting-planning process with the
statistical tooling for long/intermediate/short-range forecasting.
Directed quotation and order processing.
. Created and managing production management system in compliance with
optimization of productivity, quality, cost, delivery, safety and morale.
Created, directed and managed shop floor work instructions, job design
and work measurement system. Created inventory policy, production plan
and master schedule, material requirement plan, operations schedule and
production control(batch-production schedule, job shop schedule, priority
dispatching rules, labor & equipment schedule), material
management/purchasing/storage and warehousing, traffic and distribution.
Implemented ERP program in production process information flow (data,
tracking, records, documents, reports) and process control.
. Created Inventory Policy in compliance with balance conflicting
objectives of minimum purchase or production cost, minimum inventory
investment/storage and distribution cost, and maximum service to
customers, through ABC inventory analysis, measuring inventory
costs(ordering costs/inventory-holding costs/shortage(backorder) cost),
set up safety stock/buffer level. Also make sure the inventory to be
monitored, Categorized raw materials to typologies of ordering
(Buffer/safety stock, Cycle stock, De-coupling, Anticipation stock,
Pipeline; Keep WIP in low but constant, decided economic production lot-
size. Integrated demand forecasting into inventory management, avoided
backorder/stockouts.
. Directed Equipment Management & Maintenance. Reduced equipment downtime
and gain higher return on investment with efficient maintenance
scheduling and task assignment. Gained real-time visibility into
equipment inventory, maintenance/repair costs and performance metrics.
Controlled nonconformance and deviations by linking equipment with
corrective/preventive actions for a closed-loop quality process.
Streamlined vendor and spares management by interfaces to inventory and
procurement systems
. Directed safety management. Created an effective process safety
management program, including standard/hazard
recognition/evaluation/control/training.
. Product Development - led engineering team, communicated with customers
and met customer's requirement and industries standards (Over 300
precision mechanical metal and some plastic components with assembly).
. Worked hands-on on new products development processes of parts &
components.
. Capacity Increase - Managed manufacturing capacity increase to handle
growth of business which occurred rapidly - In 3 years went from zero
account to over 50 accounts.
. Productivity improved 21% - through set up lean manufacturing system and
the Operational Excellence.
. Increased the profit margin 16% by reduced costs through the managing
P/L, controlling costs, maximizing productivity through establishing lean
manufacturing system and internal quality improving.
. Implemented an operational excellence model that detailed best practices
for critical processes and formed/trained managing teams and working
force to implement the best practices at the subsidiary manufacturing
site.
.
. Created company Quality Manual in compliance with ISO/TS16949 standard
and eight quality management principles, setting quality goals, policies,
objectives, procedures. Implemented a Quality Management System,
allocation of resources, authority and responsibility, and monitoring of
results, and achieved ISO/TS16949 Certification.
. Directed and managed the document control, process control, nonconforming
material/products control, internal audit, inspection/measuring/testing
process.
. Managed on a hands-on basis, launched new products with TS16949 procedure
- Created PPAP (Flow Chart, FMEA, Control Plan), SPC process and met the
automotive industry standard.
. Managed on a hands-on basis, directed roots caused analysis, corrective &
preventive action in Global 8D process on inner manufacturing process and
incoming material & parts, reduced internal scrap rate 40% and improved
the productivity 25%.
. Quality continually improved - through successfully set up 5S methodology
and six sigma process. Improved the products quality from six sigma level
from 3.3 to 4.4, and the new products to 5.0.
. Worked very closely with suppliers to control incoming material/parts
quality, evaluating & auditing supplier quality management system and
activities, communicating and monitoring the supplier's quality control
activities.
o Directed & managed engineering team in creating & managing engineering
document/drawing/standards/bill of materials, estimating cost/quotation;
designing manufacturing/production process,
selecting/managing/maintenance equipments, design
tooling/mold/fixture/gages/equipments.
o Lunched new product through 8 steps: Idea Generating - Idea Screening -
Concept Development and Testing - Business/Economic Analytics -
Beta/Marketability Tests - Technicalities + Product Development -
Commercialize - Post Launch Review and Perfect Pricing
o Managed operations in casting making process with designing mold/pattern
with gating & riser system, control quality of incoming Material (sand,
ingots & scrap steels, other materials) and molding & core sand
composition/properties, melting & pouring temperature, pouring timing,
and heat treatment procedure. Implemented the a casting numerical
simulation software.
o Managed operations in plastics/PP/ABS/PET/PBT injection and die casting
aluminum/zinc parts making process with setting up the pressure,
injecting/holding timing, speed, melting & holding temperature and heat
treatment procedure. Reduced internal scrap rate 30% and improved the
productivity 20%.
o Managed operations for CNC machines in programming process, setting up
the feeds/speeds, reduced the idle time to improving the quality &
productivity. Implemented the Mastercam program in the CNC programming
process.
o Managed on a hands-on basis, design and development of automotive feeding
lines for the small parts in processing on CNC machine/machine center,
reduced the feeds/idle time and improved the productivity 25%.
o Directed in the painting/powder coating & electrostatic coating process.
o Managed the work of suppliers and internal work on tooling/molds,
machining & assembling fixtures design/making process for injection/die
casting and machining processes.