Post Job Free
Sign in

Power Plant Crane Operator/and Erector

Location:
San Antonio, TX, 78264
Salary:
$38.00/plus per-diem $100.00 per day
Posted:
July 21, 2014

Contact this candidate

Resume:

Jesse A. Whited Jr.

Structural Steel/Rigging Superintendent

Summary

Jesse Whited, Jr.

Cell-210-***-****

Education

A & M Consolidated High School

College Station, TX.

Graduated the 11th Grade

Completed G.E.D. while enlisted in the USMC

Experience

45

Borger,Tx. Project

Holbrook,Az. Project

I have over forty five years of valuable experience in the construction Industry. This includes Industrial and commercial buildings. I have very strong supervisory skills and an excellent knowledge of interpreting drawings.

Experience

LVI Facility Svcs.

8100 Blankenship

Houston,TX. 77055

8/09/13 to 9/27/13

Crane Operator,16000 Manitowoc

Alamo Crane Svcs.

P.O.Box 47077

San Antonio,TX 78265

210-***-****

05-21-13 to8-09-13

Crane Operator

Bohne Crane Sales & Svcs.

Lemont, Illinois

8-22-2012 to 12-14-2012

A & D Director/Equipment and

Rigging Foreman

J.E. Dunn

Kansas City, Missouri

6-18-2011 to 8-21-2012

Crane Operator

02-28-11,05-02-11

Altair Strickland LLC

1605 S Battleground Rd.

LaPorte, TX.77571

Employed as a Lift Coordinator. Replacing a Cat Cracker at the Valero Refinery at Laplace, La. Specifications, constructability and employee relations.

Experience

Zachry

Structural steel/Rigging superintendent

2008-09 Cholla Power Plant in Joseph City, Az. Structural Steel/Rigging Superintendent erecting the Fabric Filter House, Heavy Lift Planner.

2006-08 Cemex Balcones Plant in New Braunfels, Tx. as a Structural Steel/Rigging Superintendent.

2005-06 Tower Crane Erector and Heavy Lift Planner and Executor in the Crane Department in San Antonio, Tx.

2004-05 Three Co-Gens at EXXON-MOBIL in Beaumont, Tx. Project was completed in a timely manner.

Mesquite Power Project:

Arlington, Arizona

03-2002 -04

Certifications: CCO/Oper., Crane Oper. Examiner

Prepare and execute all Lift Plans, Scheduled Equipment needed for the four Nooter/Eriksen HRSG’s, and the two G.E. Steam Turbine Generators.

Structural Steel: Erected Pipe Racks 2745 tons and platforms 1,340 tons. Setting Combustion Turbine a total of 6 for this project.

Over 2 million safe man hours without a lost time accident. Met all mile stone dates.

Boiler/Rigging general foreman

Alstom Co-Gen Power Plant:

Corpus Christi, Texas

01/2001-02

Management and Erection of a 2 on 1 Combine Cycle. Alstom HRSG’s and Steam Turbine/Gen.

Iron/rigging general foreman

Air Condenser Construction, Inc.

San Marcos, Texas

06/2000-01/2001

Management and Erection of Structural Steel for two Air Condenser Cooling Towers (closed water system) on two ABB Combine Cycle Co-Gen Power Plants.

Crane Operator and Rigging Consultant

Texas Crane Service:

San Antonio, Texas

1998-6/2000

Operated 4000W Manitowoc with Tower Attachment, 4100W Manitowoc with Tower Attachment, Potain Tower Crane, 518 Link-Belt, and HC 278H Lattice Boom Lift Crane 300 Ton.

Rigging/Ironworker General Foreman

H.B. ZACHRY CO.

San Antonio, Texas

1987-1998

Construction Management of Structural Steel on a Direct Reduction Steel Mill at PT. Lisas, Trinidad, W.I.

Erection of Structural Steel and placement of Boiler Modules and related equipment on CO-GEN Power Plant. Equipment Coordinator for Cranes, Pickers, and Forklifts at Cleburne, Tx, Baytown, Tx. and at the Phillips Plant in Pasadena, Tx. Design and Implementation of Lift Plans for loads over 45 tons. Unit at Cleburne is a Deltak HRSG with a Westinghouse Gas Turbine and Generator. Unit at Baytown (EXXON) was also a Deltak HRSG with a Siemens Gas Turbine and Generator by Westinghouse. This unit also has a Steam Turbine Generator.

The removal of existing Coal Dumper. Erection and Start-Up of New Coal Dumper at Calaveras Lake in San Antonio, Tx.

Started Erection and completed Start-Up of J.K. Spruce Power Plant Unit # 1 in San Antonio, Tx. Erection of Boiler Support Steel, Turbine and Generator Building, Bag House Support Steel, AQCS Building with all equipment. Erection and Start-Up of all conveyors on the Power Block Side.

Completion of Correction Facilities in Fort Stockton, A 1500 Bed Med. Security Prison. Certification of Crane Operators and all Lift Equipment. Erection of Structural Steel and placement of approx. 5200 yds. of concrete.

Crane Operator

Pizzagalli Construction Co.

South Burlington, Vermont

01/1986-07/1987

Operation of a 9310 American Crane, Pouring Concrete. Placement of rebar, setting forms for concrete placement. Completed project as a Mechanical Foreman installing pipe and equipment.

Erection Superintendent

B.B. Anderson Construction Co.

Topeka, Kansas

03/1983-02/1985

Placement of Concrete Modules for the Airport Control Tower in San Antonio, Tx. Erection of Pre-cast Panels and Structural Steel of Control Building for Control Tower.

Completed Structural Steel of Humana Women’s Hospital and Medical Office Building in San Antonio, Tx.

Completed Structural Steel and Pre-cast panels at the Arlington Convention Center in Arlington, Tx.

Structural Superintendent

Wallace L Boldt Construction Co.

San Antonio, Texas

04/1982-02/1983

Removal of damaged roof and erection of new roof on The Municipal Auditorium in San Antonio, Tx.

Ironworker General Foreman

H.B. ZACHRY Co.

San Antonio, Texas

12/1980-03/1982

Erection and completion of three Chemical Production Units in Du-Pont Chemical Plant in Victoria, Tx.

General Foreman

Temple Assoc. Construction:

Diboll, Texas

03/1978-11/1980

Completion of a cement plant for TXI in Hunter, Tx. Started and completed Lumber and Saw Mill in New Boston, Tx. Client was International Paper Co.

Crane Operator, Rigging/ Equipment Foreman

H.B. ZACHRY Co.

San Antonio, Texas

07/1967-02/1978

Crane Operator on 4000W, 4000 “Ringer”, 4100W, 4100S3 “Ringer” at two Gas Fired and three Coal Fired Power Plants in the San Antonio, Tx. area. Lifting capacities are 150 tons and 300 tons respectfully. Maximum length of the boom used was 290’ main and 40’ of the Jib on the 4000”Ringer” and 340’ and 40’ of Jib on the 4100S3.

Rigging/Equipment Foreman on five housing sub-divisions for the Construction Modules of San Antonio, a subsidiary of H.B. Zachry Co.

References

Gary Peirce, Gen Field Supt. Cell-361-***-****

Ronnie Tietze, Structural/Rigging Supt. 830-***-****

John Colston, Const. Mgr. 602-***-****

Training

Certified Crane Inspector and Crane Operator Examiner by the Crane Inspection & Certification Bureau, Inc. of Orlando, Florida

CCO, Certified Crane Operator, OSHA Recognized

Completion of (six) OSHA Ten Hour Safety and Training Provisions

OSHA 30 Hour Construction Industry.

Completion of 80 hrs. of Advance Management Training

NCCER, Advance Rigging,and Ironworking.

Page of



Contact this candidate