SEAN TABRIZI
Rancho Cordova, Ca *****
Phone: 916-***-**** cell
Email: ***********@***.***
Objective
Seeking a challenging career in an esteemed organization to grow professionally by strengthening
my technical and analytical skills, and earning good reputation with whom I work, always
keeping in mind the goals of the organization as the prime objective.
EXPERIENCE
2009- 2014 Aerojet/GenCorp Rancho Cordova, CA
Control Account Manager/Senior Project Engineer III
Program: SM3 Blk IIA, SM3 Blk IB, Antares
• Led design, development and procurement of components for SM3 Blk IIA, SM3Blk IB
and Antares.
• Reviewed and directed the progress of design engineering, manufacturing, planning and
scheduling to meet program objectives.
• Led and participated in testing activities including environmental and hot fire testing of
solid fuel Blk IB TDACS as part of flight qualification process.
• Managed key suppliers through critical challenges with an emphasis on technical
progress, schedule, and product improvement.
• Prepared presentations for management and team members on a regular basis for events
such as PDR, CDR, PMR, ERB and other IPT reviews.
• Provided guidance on EAC reviews, monthly CPR (cost and schedule performance,
variance analysis, and recovery plans.
• Performed risk assessment and created mitigation plans and socialized them with
engineering team members, program management and customer.
• Prepared scheduled presentations at all levels of Management within Aerojet and at the
Program Level with Major customers.
• Participated actively in proposal preparation, fact finding and negotiations in all areas of
SM3 Blk IIA program.
• Participated in IBR process and program audit preparations.
2007- 2009 BAE Systems Santa Clara, CA
Senior Technical Project Manager (Contactor for TAC Worldwide)
Programs: FCS NLOS-C, MRAP and JLTV
• Performed Cost/Schedule Control System (C/SCS) known as EVMS on different
programs and projects.
o Managed a group of CAMs (Cost Account Managers) to ensure timeliness of EV
performance reporting on a weekly and monthly basis on several multimillion
dollar government programs.
o Established and maintained cost/schedule baselines and development of Work
Breakdown Structures (WBS) according to BOEs (Basis of Estimates) provided
by CAMs.
o Performed analysis and reporting in the areas of program performance, support
EAC development, variance analysis, and cost/schedule risk assessment by
utilizing Earned Value methodologies and processes.
o Worked closely with the business and financial managers in structuring and
supporting multiple integrated baseline reviews.
o Provided independent and well-supported analyses of cost, schedule, and
technical accomplishment and interface with prime contractor and subcontractor
counterparts on a recurring basis.
o Developed and maintained the Integrated Master Schedule utilizing MS Project
and Open Plan to identify and report schedule critical path.
• Participated in overall product strategy, research and development requirements and
manufacturing coordination for new and emerging programs.
• Provided technical expertise, recommendations and training to other departments in
support of product development and cost estimation.
• Evaluated, analyzed, and made recommendations on products, designs, and cost
improvements to improve the competitive position of the company on different upcoming
proposals.
• Prepared product development objectives and schedules for all phases of product and
reported to IPD leads.
2006- 2007 Surefire L.L.C Fountain Valley, CA
Engineering Project Manager
• Managed the day-to-day progress of full life cycle product development.
• Participated in overall product strategy, research and development requirements and
manufacturing coordination for new and emerging products such as working with tactical
and/or electronic security systems.
• Collaborated with a wide variety of functional areas such as sales, engineering,
marketing, manufacturing, and operations to develop and provide product definitions
responsive to customer needs and market opportunities.
• Applied Microsoft Project Scheduling tool and other Microsoft office programs to
monitor and manage programs and projects.
• Maintained all communications and contacts to collect and analyze technical, financial,
schedule, and sales information for product line.
• Evaluated, analyzed, and made recommendations on products, designs, and cost
improvements to improve the competitive position of the company.
• Led problem identification, definition, analysis, solution generation, and solution
implementation.
• Analyzed test data and reports to determine if designs meet functional and performance
specifications.
• Prepared product development objectives and schedules for all phases of product
development and introduction to market.
• Coordinated with overseas suppliers and factories on a daily basis to ensure timeliness of
the scheduled shipments.
2005- 2006 Honeywell Aerospace Torrance, CA
Project Engineer
Programs: JSF, F22, F18, CX-PX, 737R, A380, A320
• Provided leadership, coordination, and technical guidance for the development of several
commercial and defense programs
• Built and maintained program plan and schedules including resources and demands.
• Managed budget and earned value determinations by utilizing earned value
methodologies.
• Provided technical direction and/or guidance to design and analysis specialists, and
product engineers to develop electro-mechanical components.
• Led small-to-medium sized military and defense programs and worked in DOD
development environment.
• Prepared and negotiated proposal cost and schedule estimates and modifications.
• Designed and developed high performance, high reliability and medium scale electro-
mechanical subsystems using Solid Works, Pro-e and Auto-CAD.
• Prepared presentations on different program for management and team members on a
regular basis.
• Worked with advanced manufacturing group to reduce cost and increase efficiency on
several military and defense programs.
1999- 2003 Cummins Engine Inc. Memphis, TN
Buyer/Material Planner
• Performed materials requirements planning (MRP) and analysis of production scheduling
and inventory management practices for several production lines.
• Identified and resolved bottlenecks in manufacturing and supply operations that had been
inhibiting production and delaying shipments.
• Led and participated in improvement projects across functional groups to optimize and
align resources towards production efficiency and cost saving.
• Recommended changes in supply chain management and performance measures, which
to enhance coordination of the supply chain.
• Analyzed, forecasted and planned demand for engine materials annually and quarterly
• Monitored raw materials and core levels, insuring and allowing production to meet the
required customer demand and delivery.
• Worked closely with national/international suppliers/customers to meet operating
guidelines.
Cummins Engine Inc. Memphis, TN
Production Specialist
• Identified and communicated opportunities for process improvement to management
• Identified and addressed product related issues arising on the production floor
• Identified and recommended methods of Lean Manufacturing to reduce cycle time and
increase process speed.
• Recommended reorganization of work areas and reduced WIP (Work-In-Process), and
speed material flow through the entire manufacturing process on the shop floor.
• Led and audited implementation of ISO9000 practices and procedures throughout the
plant.
• Assisted in Six Sigma projects to help the organization to achieve improvements in
quality, reduction of defects, and ultimately lower cost.
• Researched and improved Kaizen and Kanban events to refine the production and
delivery of components to the production line as and when they were needed to prevent
storage.
EDUCATION & TRAINING
THE UNIVERSITY Of MEMPHIS Memphis, TN
• Bachelor of Science, Mechanical Engineering
CUMMINS Inc. Memphis, TN
• Manufacturing Process Management and Six Sigma Green Belt Training
BAE SYSTEMS Santa Clara, CA
• Project Management and scheduling and EVMS Training
Aerojet Rockedyne Rancho Cordova, CA
• Certified Control Account Manager
PMP Certification Preparation Rancho Cordova, CA
• 35 credit hours PMP Contact Courses completed