Post Job Free

Resume

Sign in

Power Plant Electrical

Location:
Los Alamitos, CA
Posted:
May 02, 2014

Contact this candidate

Resume:

*** **. ***** *****

Vonore, TN *****

Home: 423-***-****

Cell: 863-***-****

acdyuc@r.postjobfree.com

Christopher Robertson

Objective

To continue my career in electrical supervision, using my abilities and training for advancement.

Qualification Summary

Over 20 years experience of increasing leadership and responsibility in the operation and maintenance of

electrical and instrumentation systems. Areas of Expertise include: Training, maintenance, leadership,

motors, quality control, generators, breakers, high voltage terminators, fiber optics, and PLC’s.

Experience

2013 Current Monterey Mushroom Inc., Loudon, TN

Electrical Coordinator

• Supervised 5 electrical and mechanical assemblers for onsite installation of material handling

robots.

• Set up and installed Fanuc and ABB robots

• Troubleshooting controllers

• Troubleshooting pneumatics and hydraulics

2011 – 2012 Carlex Glass Company, Vonore, TN

Instrument /Maintenance Tech E5/M3

Trouble shoot and repair breakdowns on all equipment lines

Trouble shoot and restart Omron and Mitsubishi PLC’s in all positions when lines are not

working

Change out motors, gearboxes, belts, pulleys bearings, cylinoids / air cylinoids and sensors

Make and mill new shafts and weld broken molds for machinery

Weekly and monthly preventative maintenance

Run new conduit and circuits when old lines have been damaged, replace lines for air pneumatic

systems.

Trouble shoot and repair robotics

Maintain elements in furnace

Run lathe and mill for fabricated parts in machine shop; also to make custom fab parts

Run CNC Machine when needed, changed tools and set up

Completed PLC training through employer

2005 – 2011 DCR Construction & DCR Engineering Services, Inc.

Lakeland, FL

Technical Services Manager (2006 2011 DCR Engineering Services, Inc,)

Manage a field crew of 12 employees traveling the state of Florida, as well as 5 shop employees in

the Lakeland Office (Planning/supervising all aspects of E&I maintenance DCS Support in

water and waste water plants)

Supervise the set up/installation of PLC cabinets, RTUs, Generators, Camera Systems, Fire

Station Alerting Systems, and Wireless Broadband Networks for Municipal Utilities

Departments, Public Works, and Public Safety

Working with Motorola, Allen Bradley, & Siemens PLCs, Square D Switchgear, Limited exposure

to many other control systems/PLC’ Set up Instrumentation Mechanical Integrity Tasks

Inspected electrical work to ensure compliance with all applicable codes, standards, and

specifications

Acting Safety Manager

Electrical Supervisor of Maintenance (2005 2006) DCR Construction

Responsible for 12 electricians working at a Mosaic phosphate mine

Maintained switchgear in plant, motors, motor starters and instruments

Maintained substations, transformers, and 4160 motors and starters on matrix line

Maintained substation to dredge & dredge switchgear

2004 – 2005 Aneco Electrical Construction, Inc., Atlanta, GA

Electrical Journeyman (Water Treatment)

Ran Conduit

Mounted Disconnects

Terminated motors and switchgear

Ran duct bank

2001 – 2003 Becon/Bechtel, Ashland, MS

Electrical Foreman (Power Plant)

Supervised 15 electricians to support the completion of Gas and Steam turbine generators

Inspected electrical work to ensure compliance with all applicable codes, standards, and

specifications

Supervised installation of all electrical systems such as underground conduit, grounding, cable

and terminations with no safety incidents

Supervised installation of temporary power

Supervised electricians

Install duct bank, cable tray, conduit, set switchgear and terminated control wires and high

voltage stress cones

Trouble shoot DCS Cabinets, Motor Control Centers, and high voltage switchgear

2000 – 2001 Duke Flour Daniels, Sallis, MS

Journeyman (Power Plant)

Ran conduit, cable tray, terminated various instruments, terminated high voltage DCS cabinets,

and GE Mark VI Turbine Control Cabinets

Served as start up electrician, worked with instrument techs calibrating and repairing electrical

and control issues

Assisted surveyors when needed

Instrumentation and maintenance for start up of power plant

1999 – 2000 Becon/Bechtel, Ackerman, MS

Journeyman (Power Plant)

Terminated Fiber Optic cable & high voltage

Installed stress cones, DCS Cabinets, ran cable tray and conduit, terminated Switchgear

Assisted Instrument Techs with trouble shooting on DCS Cabinets and Data Highway

Assisted Surveyors when needed

1999 Beau Rivage Casino, Biloxi, MS

Electrical Maintenance

Maintained the electrical operations throughout the hotel and casino

1996 – 1999 Edwards Electric, Philadelphia, MS

Journeyman (Commercial)

Ran large conduit

Set main switchgear and transformers, and terminated transformers

Fire alarm systems

Security systems

Installed gas generators

1995 – 1996 C&F Electric, Columbus, MS

Journeyman (Warehouser, Paper Mill)

Pulled wire & Ran conduit

Installed Cable tray

Worked on DC drive motors

I/O rack troubleshooting

1994 –1995 John Brown, Aberdeen, MS

Top Helper (Industrial Plant)

Ran conduit

Pulled Wire

1994 BE & K, Plymouth, NC

Top Helper (Warehouser Paper Mill)

Ran conduit

1993 SW & B, Franklin, VA

Top Helper (Union Camp Paper Mill)

Ran conduit

Pulled wire

Terminated wire

1992 – 1993 BE & K Construction, Canton, NC

Helper (Champion Paper Mill)

Ran conduit

Pulled wire

Certifications

NCCER Certified Industrial Electrician

Completed Fiber Optic Termination Training

Certified fork lift operator

Certified in High Voltage Terminations

References

Tom Gillen, Ph. D., Project Manger – DCR Engineering Services, Inc,

813-***-****

Brian Warthen, Project Engineer – DCR Engineering Services, Inc.

813-***-****

Chris Chub, Team Leader Carlex Glass Company

423-***-****

Johnny Thompson, Team Leader – Carlex Glass Company

865-***-****



Contact this candidate