THOMAS A. LEWIS

acdupy@r.postjobfree.com

225-***-****

OBJECTIVE

Project Management of High-Profile, Multi-Million Dollar Facilities.

Involvement from inception, budgeting, design, authority approvals,

bidding, negotiation, construction management, punchlisting, equipment

certification, training and end-user ownership.

SUMMARY

Experienced, detail oriented, motivated Construction Management

professional with outstanding internal and external customer relation,

communication and negotiation skills.

With 30+ years of overall construction experience ranging from Hospitality,

Commercial Big-Box, Industrial Automotive, Hospitals, Healthcare

Facilities and Tenant Improvements, I have gained recognition for expertise

of providing solutions to coordination, design and construction issues.

While the majority of my projects have been that of Owner-Representative,

this asset is valuable in all facets of a construction project - albeit

General Contractor, Subcontractor, Equipment or Material Vendor. For this

reason, all Construction Management opportunities are of interest.

Constant communication with the many different contractors responsible for

successful project continuity and completion has become a second nature; as

has the ability to focus on several important issues at once while

maintaining budget, schedule, project relations and priority management.

These overall abilities and multi-discipline awareness have positioned me

as a Lead Construction Project Manager on projects ranging from $400K to

$45M and in a team of Project Managers / Construction Coordinators of

projects from $850M to $1.1B.

QUALIFICATIONS / SKILLS

. CPM scheduling, coordination of multiple trades, daily completed work

inspections, prepare and manage punchlist completion. Coordinate final

installations with Owners activities.

. Expedite requests for information, design error and omission resolution,

constructability discussions.

. Manage submittals for Architect / Engineer / Municipality review,

permitting, Inspectors approval.

. Assemble bid packages, issue clarifications / addendums as appropriate

to define the scope of work.

. Manage changes to the work, gather and provide quotations for changes,

issue change orders, track status.

. Overall cost budgeting and management. Assist in value engineering

review and manage monthly billings.

. Conduct weekly progress and impromptu meetings as necessary.

. Schedule equipment commissioning and training. Coordinate equipment

commissioning checklist reviews to verify specified equipment model,

placement, utility needs and hook-up, proper operation, manufacturer

identified tolerances, calibration and maintenance. Coordinate equipment

commissioning with end-user's staff schedule and oversee specialty

training as required. Gather and prepare closeout documents.

. Proficient in Microsoft Office, Bluebeam Revu and easily adaptable to

any computer program.

EDUCATION

Air Conditioning/Heating, Oakland Community College

Electrical Code, Commercial Wiring & Motor Control Technology, Mott

Community College

Commercial and Residential Wiring, Electronics - Genesee Area Skills Center

High School Graduate

EXPERIENCE

2008-2013 - Lillibridge Healthcare Services, Plano, TX - Project

Manager: Healthcare Office Buildings, Waco, TX. Baton Rouge, LA

2007-2008 - Faulkner USA, Austin, TX- Project Manager / MEP

Coordinator: Hospitality, Hotel, Convention Center - San Antonio,

TX

2004-2007 - K & K Technical Group, Harrison, OH - Project Manager /

Construction Coordinator: Automotive, Assembly Plant, San Antonio,

TX

1989-2004 - SSOE, Inc., Toledo, OH - Construction Coordinator /

Project Manager: Automotive, Assembly Plant, Jackson, MS,

Assembly Plant - Bowling Green, KY. Commercial, Retail Big Box /

Stand-Alone Pharmacy - Midwest, USA. Government, Medium Security

Correctional - Ionia, MI. Under-Privileged Correction / Training

- Flint, MI.

1987-1989 - DeMaria Construction Co., Novi, MI - Journeyman

Carpenter/Foreman: Automotive, Body Design, Dearborn, MI.

Institutional, Community College - Saginaw, MI. Regional Medical

Center - Ann Arbor, MI. Commercial, County Corrections - Macomb,

MI.

1985-1987 - CJ Rogers Construction, Flint, MI - Foreman: Automotive,

Pontiac, MI

EXPERIENCE (Expanded Version)

Project Experience while Employed with Lillibridge Healthcare Services,

Plano, Texas. 2008 - 2013:

Title: Project Manager

Healthcare - Medical Office Buildings (Commercial)

. Woman's Hospital - Baton Rouge, LA

. Hillcrest Health Systems - Waco, Texas

The Projects consisted of Medical Office Buildings of 160K sq. ft to 260K

sq. ft., including Tenant Improvement buildout of individual practices and

clinics. The Waco, TX project consisted of 17 individual Tenants and The

Baton Rouge, LA project consisted of 25 individual Tenants. Duties

performed as Project Manager include scheduling, coordinating

installations, estimating, cost management, closeout and support for

warranty issues.

Outline of Duties Performed:

. Define the Scope of Work.

. Project Estimating.

. Value Engineering process.

. Manage Submittals for Municipality Review/Approval/Permitting.

. Review Contractor Bids.

. Issue Clarifications / Addenda as appropriate.

. Manage Material Submittals.

. Schedule and Coordinate Work.

. Manage RFI's (Requests for Information)

. Manage Changes to the Work.

. Review work in place for compliance.

. Provide Quotations for Changes.

. Issue Change Orders.

. Overall Cost Budgeting and Management.

. Create and manage the Punchlist procedure.

. Gather and Prepare Closeout Documents.

. Schedule and Oversee any Specialty Training Required.

. Support warranty callback issues.

Project Experience while Employed with Faulkner USA, Austin, Texas. 2007 -

2008:

Title: Project Manager / MEP Coordinator

Hotel/Hospitality (Commercial)

. Grand Hyatt Hotel and Convention Center - San Antonio, Texas

This Project consists of coordinating and managing multiple trades for

completion of a new 1000 room Hotel and Convention Center. Duties performed

as MEP Coordinator / Project Manager include scheduling, coordinating

installations with Owners activities, review of existing installations for

compliance, expediting design error and omissions resolution, daily

completed work inspection and coordination with city inspectors for

acceptance.

Outline of Duties Performed:

. Laundry Plant Coordination and Management.

. Main Kitchen, Restaurant, Room Service Kitchen, Service Areas and

Pantries Coordination and Management.

. Convention Center Pre-Function areas Coordination and Management

(Bathrooms, Bars, Beverage Stations).

. Hotel Room Inspections and Expediting.

Project Experience while Employed with Aristeo Construction, Livonia,

Michigan. 2006 - 2007:

Title: Project Manager

Automotive (Industrial)

. Toyota Motor Manufacturing North America - Assembly Plant - San Antonio,

Texas

This Project consisted of managing multiple expansion and support projects

for the new 2.1 million square foot manufacturing and assembly plant.

Duties performed as Project Manager include scheduling, coordinating

installations with production timelines, estimating, cost management and

support for warranty issues.

Outline of Duties Performed:

. Define the Scope of Work.

. Project Estimating.

. Manage Submittals for Municipality Review/Approval/Permitting.

. Assemble Bid Packages for All Disciplines.

. Review Subcontractor Bids.

. Issue Clarifications / Addenda as appropriate.

. Issue Subcontracts.

. Manage Material Submittals.

. Schedule and Coordinate Work.

. Manage RFI's (Requests for Information)

. Manage Changes to the Work.

. Provide Quotations for Changes.

. Issue Change Orders.

. Overall Cost Budgeting and Management.

. Prepare Monthly Billings.

. Manage Punchlist Completion

. Gather and Prepare Closeout Documents.

. Schedule and Oversee any Specialty Training Required.

Additional Responsibilities:

. Safety Liaison with Owners Safety Department Staff.

Project Experience while Employed with K & K Technical Group, Harrison,

Ohio. 2004 - 2006:

Title: Construction Coordinator

Automotive (Industrial)

. Toyota Motor Manufacturing North America - Assembly Plant - San Antonio,

Texas

This Project consisted of a new 2.1 million square foot manufacturing and

assembly plant. Specific job responsibility information is available upon

request.

Duties Performed:

. Pay Application review & processing.

. Attend progress and coordination meetings.

. Monitor contractor schedule for compliance and interface with Owners

procurement schedule.

. Make adjustments as necessary to schedules and negotiate any needed

resolutions.

. Coordinate revisions to existing utilities and building structure to

accommodate new equipment.

. Provide resolution to contractor coordination issues.

. Schedule and administrate Owner changes and revisions to maintain

existing schedules and equipment deliveries.

. Review work for compliance with contract documents.

. Distribute and administer punchlists for non-compliant work.

. Review equipment cuts for receiving, distribution, access control and

kitchen equipment. Verify proper utility services, pit openings and

infrastructure to support equipment prior to installation. (Toyota

KANBAN procedure).

. Respond to contractor RFI's.

. Issue sketches for onsite Field Order pricing.

. Administer scheduling and handover procedures for Owner occupation,

which involved daily monitoring and administration of contractors'

completion schedules.

. Distribute and administer closeout lists.

. Coordinate training sessions between contractor, manufacturer

representative and Owners maintenance staff.

Project Experience while Employed with A/E Firm, SSOE - Toledo, Ohio. 1989

- 2004:

Title: Construction Administrator

During my 15 years with SSOE, I reviewed contract documents before issue

for bids, coordinated shop drawing reviews by the various disciplines,

visited construction sites to determine whether quality and progress of

work complied with contract documents, and interpreted contract documents

to Sitework, Building, Mechanical, Electrical, Plumbing and Fire Protection

trades. I attended pre-bid, pre-award and construction progress meetings

and prepared and monitored punchlists, bulletins, change orders,

certificate of substantial completion, project close out and certificates

of payment. Additionally, I was a continual resource to the

Architectural/Engineering disciplines for construction methods and detail

development, providing feedback for simplification of installations and

cost-savings ideas through alternate materials and methods.

Retail Clients (Commercial)

. Meijer, Inc., Grand Rapids, Michigan

. Giant Eagle, Inc., Pittsburgh, Pennsylvania

. Rite Aid, Inc., Camp Hill, Pennsylvania

. Mervyns, Inc., Hayward, California

Retail Projects consisted of 60,000 square foot addition/remodels to

220,000 square foot remodels/new

buildings. Many projects included site clearing to final landscaping /

municipal acceptance of area

ranging from 30 to 70 acres.

Duties Performed:

. Responsible for project administration and multi-discipline inspection

to verify compliance with contract documents.

. Pay Application review & processing.

. Bulletin pricing review and processing.

. Attend weekly progress and coordination meetings.

. Provide resolution to contractor coordination issues.

. Review work for compliance with contract documents.

. Review equipment cuts for Owner-purchased merchandising, display

systems and kitchen equipment. Verify proper utility services and

infrastructure to support equipment prior to installation.

. Respond to contractor "Request for Information" (RFI's).

. Issue sketches for onsite Field Order pricing.

. Distribute weekly status report for pending issues.

. Distribute and administer punchlists for non-compliant work.

. Distribute and administer closeout lists.

. Coordinate training sessions between contractor, manufacturer

representative and Owners maintenance staff.

Government

. State of Michigan, Lansing, Michigan - Handlon Training Center in Ionia,

Michigan.

. State of Michigan, Lansing, Michigan - Job Corp. Center in Flint,

Michigan.

Government Projects consisted of retrofitting a fire protection system into

a medium-security rehabilitation facility and Mechanical/Electrical field

administration for a new Job Corp facility.

Duties Performed:

. Pay Application review & processing.

. Bulletin pricing review and processing.

. Attend weekly progress and coordination meetings.

. Review work for compliance with contract documents.

. Assist contractor in determining proper route for fire protection

mains and branch piping, through existing facilities.

. Assist Owner's representative with scheduling and flow of work, in

relation to Owners occupancy use.

. Distribute weekly status report for pending issues.

. Provide resolution to contractor coordination issues and interface

with existing conditions.

. Distribute and administer punchlists for non-compliant work.

. Distribute and administer closeout lists.

Automotive (Industrial)

. General Motors - Corvette Plant - Bowling Green, Kentucky

. Nissan North America - Assembly Plant - Canton, Mississippi

Automotive Projects consisted of retrofitting an existing facility with new

distribution support, Industrial and Commercial aspects of a new 2.4

million square foot assembly plant and support service outbuildings.

Specific job responsibility information is available upon request.

Duties Performed:

. Pay Application review & processing.

. Attend progress and coordination meetings.

. Monitor contractor schedule for compliance and interface with Owners

procurement schedule.

. Make adjustments as necessary to schedules and negotiate any needed

resolutions.

. Coordinate revisions to existing utilities and building structure to

accommodate new equipment.

. Provide resolution to contractor coordination issues.

. Schedule and administrate Owner changes and revisions to maintain

existing schedules and equipment deliveries.

. Review work for compliance with contract documents.

. Distribute and administer punchlists for non-compliant work.

. Review equipment cuts for receiving, distribution, access control and

kitchen equipment. Verify proper utility services, pit openings and

infrastructure to support equipment prior to installation.

. Respond to contractor RFI's.

. Issue sketches for onsite Field Order pricing.

. Administer scheduling and handover procedures for Owner occupation,

which involved daily monitoring and administration of contractors'

completion schedules.

. Distribute and administer closeout lists.

. Coordinate training sessions between contractor, manufacturer

representative and Owners maintenance staff.

Experience between 1985 and 1989

DeMaria Building Company, Novi, Michigan

Title: Journeyman Carpenter

1987-1989

Project Experience

University of Michigan Regional Medical Center

Job duties included layout and installation of a complete MRI facility

including coordination with all trade contractors.

Ford Motor - Dearborn, Michigan

Job duties included layout and installation of CADD/CAMM stations that

housed computer terminals. Coordination of chiller piping and unit

installation within stations.

Ford Motor - Monroe Michigan

Job duties included layout and installation of pit modification concrete

walls. Coordination with all trade contractors for installation of pit

equipment infrastructure.

Macomb County Jail

Job Duties included finalization of change order work, punchlist

corrections and completion of floors funded by the State of Michigan.

C.J. Rogers Construction, Flint, Michigan

Title: Foreman/Laborer

1985-1987

Project Experience

General Motors - Pontiac, Michigan

Job duties included initial layout and excavation of conveyance,

equipment and storage pits. Layout

and excavation for building footings, storm, sanitary and water systems.

Horizontal and vertical grade

control for a receiving/internal distribution building.

Experience between 1982 and 1985 (self-employed)

Commercial Projects

. Equipment retrofits for a chain of dry cleaning facilities. Services

included electrical power and control wiring, pipefitting for equipment

steam needs, main washing and drying equipment hookup and maintenance.

High-pressure steam boiler maintenance.

. Lighting and audio system installation and maintenance for a prominent

nightclub.

. Layout and installation of merchandising and displays for a clothing

retailer, including all task lighting and display case lighting

installation.

. Electrical retrofitting for a community college, including power and

systems wiring.

Residential Projects

. Several rental unit retrofits including space remodeling (walls, drywall,

ceiling, flooring, etc), plumbing and electrical upgrades.

. Coordinated and managed other remodel activities such as roofing and

siding, window and door retrofitting and concrete work.

. New-build installations of electrical service equipment, internal and

external wiring systems including LAN and audio/intercom.

During this time frame, I also worked full and part time at a

wholesale/retail electrical supply house.



Contact this candidate