Curriculum Vitae
RAVNEET ZUBIN SINGH SODHI
# ***, ******* ***** ******, ****** Cantt (Pin-133001),Haryana
Contact: +919*********, +919*********, +911********* ;
Email ID: ****************@*****.***, *******.*****@*******.***
OBJECTIVE
To work in a competitive environment that effectively utilizes my analytical, interpersonal,
leadership and organizational skills to conceive and achieve solutions. The solutions which
help the organization in not only meeting its targets, but also allowing it to grow, thereby,
enhancing my own skills as an individual and as a key player in the organization's
development.
PROFILE
10 Qualified B. Tech, Electronics and Communication, Engineering from Punjab
Technical University, having an inborn quantitative aptitude, determined to carve a
successful and satisfying career.
11 Possess good knowledge of all phases of Software Development Life Cycle (SDLC)
with concentration on requirements analysis, technical systems design, development
and implementation of various applications.
12 Knowledge of Electronics, Operating System, Digital Electronics, Electronics Circuit
Designing and skilled in Wireless Communication Skills like 2G,3G Technology, GSM
Network, UMTS Network and WCDMA, HSPA & HSPDA
13 Conceptually strong with an innovative and analytical approach to the work with an eye
for detail. Gained practical knowledge of various languages, operating systems and
Assembling/ Networking/ Troubleshooting of PC.
14 Well developed communication skills with reputation of unwavering accuracy,
credibility & integrity, exceptional presentation skills with the ability to perform above
expectations.
EDUCATIONAL CREDENTIALS
B. Tech, Electronics and Communication Engineering 2009
Punjab Technical University, 65%
HSC 2005
CBSE Board, Bhartiya Public School, Ambala Cantt
SSC 2002
CBSE Board, Kendriya Vidyalaya, Ambala Cantt
Technical Skills
Languages C++, Core Java, C#, ASP.net, JavaScript
Operating Systems Windows 98/2000/XP
IDE Visual Studio 2008, Core Java (TextPad-5.42),Net Beans
Database SQL Server 2008
Projects Undertaken
Project Entering Customer Detail by Mobile Workshop
Descripti Developed for the customer to enter details by Mobile Shopkeeper to mobile company, so that
on after taking all the customer detail they resume their mobile service.
Project Capacitance Meter
Languag C, Cat Lab
e
Base General Purpose based PCB
Fabricati At89c2051 Micro Controller, IC 7481(3:8 decoder) & Seven Segment Display
on
Descripti In this project with the help of 2051 microcontroller,3:8 decoder we will able to find the value of
on unknown Capacitor on Seven Segment Display.
Training Undergone
15 8 weeks training at Tata Indicom Ambala City on Introduction to mobile
Communication
16 6 months training at Vodafone MSC Karnal
Introduction to Fiber Network, BSS & O&M,BTS maintenance & daily supervision of
alarms, BTS Installation & Commissioning (Flexi & Ultra) & Supervision of Optical Fiber
Communication Network.
Academic Accolade
17 Scored 98% for Oracle IZ0-851 Java Standard Edition 6 Programmer Certified
Professional Exam.
18 Participated in Science Exhibition organized held in Ambala Cantt in 2001 .
PROFESSIONAL EXPERIENCE
Working in Delta India Electronics from 6th Aug2012-Till Date
19 Current Employer:
Delta India Electronics., Gurgaon
http://www.deltaww.com
http://www.deltapowersolutions.com
About Delta India Electronics
Delta Electronics Inc was established in 1971 and is headquartered in Taipei,
Taiwan. Delta is the world’s largest provider of switching power supplies and
brushless fans.
Delta operates in the following seven product areas:
Power management
•
Renewable energy
•
Components
•
Networking
•
Industrial automation
•
Automotive electronics
•
Display solutions
•
Products
20 Telecom Power Solutions (TPS)
21 Uninterruptible Power Supply (UPS)
22 Datacenter InfraSuite Solution
Job Profile
Engineer (Network Operation Center/Engineering & Design)
(August 2012 – Till date)
23 Job Responsibilities:
Teleinfra Remote Monitoring System (Delta Power Solutions) – Delta Power
Solutions (India) Pvt. Ltd.
Role:
24 Development for Hardware system.
25 Field execution of RMS (Remote Monitoring System).
26 Responsible for Protocol mapping for controller.
27 Heading whole operations of installation of Remote Monitoring products.
28 Responsible for software & hardware related Testing
29 Hardware Testing involves:-
30 Power Supply Test
31 Functional Testing
32 EMC & EMI Testing
33 Environmental Testing
34 Software Testing:-Test Application as per the requirements of the application.
35 Responsible for all NOC related operation & to Check the data on NOC &
Update the NOC related settings.
Tools:
36 HyperTerminal, Docklight, PortPeeker.
Detail:
37 It’s an centralized online system and a web portal to remotely monitor mobile tower
configuration and power solutions of the company across India.
38 It shows the current status of various measurements/alarms of the sites; generate
timely based reports, Trouble Tickets, automatic trigger emails and SMS.
39 By using this application Telecom customers, like Idea, Vodafone, BSNL, Indus etc,
can create users (for site technicians) and let them monitor as well as control their
respective sites remotely.
40 Developing & executing effective plans, including team building to assure
achievements of targeted goals with fulfilling quality objectives.
41 Analyzing running trends and tracking competitors’ activities and providing valuable
inputs for product and process enhancement.
42 Successfully heading whole operations of installation & Services have knowledge of
all power products used in telecom sector.
43 Having technical & practical knowledge of Telecom SMPS, UPS, Battery bank, DG,
PIU, Stabilizers etc.
NETCAM Development, Testing & Field execution – Delta Power Solutions (India)
Pvt. Ltd.
Role:
44 Development for Hardware system.
45 Field execution.
Tools:
46 MPLAB ICD 3 & PICIT 3
Detail:
47 NETCAM basic function is to capture image & store it.
48 We can configure image capturing setting by any event (here we are using Door Open
of Cabinet door or shelter door) & also we can capture image by setting particular time
interval.
REMOTE MONITORING Controller Development, Testing & Field execution – Delta
Power Solutions (India) Pvt. Ltd.
Role:
49 Development team member for Hardware system.
50 Field execution.
Tools:
51 MPLAB ICD 3 & PICKIT 3
Detail:
52 It works as a Master for whole system.
53 It captures data (measurements like Voltage, Current, Run Hrs, Energy etc & also
sends alarms & status of site) through controller & send to our centralized server.
54 Capable of communicating whether through RS485 or RS232 interface.
55 Capable of uploading software, protocol mapping file through remote itself.
56 Worked on 2nd Project ATM Monitoring .
Achievements
Successfully handled all Hardware development, Software & Hardware related Testing
responsibilities of Projects .
SAI COMPUTERS AMBALA CANTT
Job Profile Jan 2011 – Dec
2011
Assistant Computer Engineer
About SAI COMPUTERS
57 Deftly handled entire Networking functions while troubleshooting and maintaining
overall LAN operations
58 Accountable for overall security of network & complete system back-up including data
& application for all users
Job Responsibilities
59 Responsible for troubleshooting, configuring and manage all types of Desktops and.
Accountable for problem cause analysis, resolution of routine customer problems and
complexity resolution.
60 Managed computer installations along with all related accessories and networking to
ensure hassle free functioning of systems. Updated users on maintenance tips for
prolonged service life of machines
Achievements
Successfully handled all troubleshooting configuring & manage of all Desktops, Managed
Computer installation & networking for proper functioning of systems.
NEW HORIZON COMPUTER LEARNING CENTER AMBALA CANTT Jan 2010 –
Dec 2010
About NEW HORIZON
It is Computer Learning Educational Institute in Ambala Cantt .
Job Profile
Computer Instructor
Date of Birth: 30th July 1986
Reference: Available on Request