Stephen W. Reed **** Reed Rd Clarklake, MI *****
Home 517-***-****, Cell Phone 517-***-****
Email - *********@*********.***
Objective: I am searching for a challenging position that will fully utilize my extensive technical skills, project management ability and EHS knowledge.
Accomplishments:
* Successfully lead all EHS functions in multiple plants across two states
* Successful full implementation of ISO 14001 in Alabama plant
* Reduced cuts to hand by 70% while saving $7,000 in PPE costs
* Saved over $15,000 in waste water removal costs by working with DPW
* Certified Storm Water Operator & MIOSHA Level I and Level II Certifications
Experience: Hi-Lex Controls, Inc Litchfield, MI
Safety, Training & Environmental Manager March 2010-Present
* Responsible for the environmental health & safety of over 900 associates across three plants in two states. (Michigan & Alabama)
* All reporting as required for Environmental, MIOSHA or customers including OHSA 300 Summary, SARA, NPDES, GHG, Emergency Response Plan.
* Gather data for ISO and Safety metrics, report to teams and management.
* Write and maintain all required Safety Programs PPE hazards analysis, JSA, LOTO, Hearing conservation, EAP, etc.
* Work with engineering, maintenance and machine build groups for machine guarding, ergonomics and egress.
* Perform or setup all required training for safety, environmental and employee advancement. Responsible for the Apprenticeship Program through JAMA.
* Train and work with EAP coordinators and first responders, covering all emergency procedures.
* Wrote and maintain all required written Environmental ISO14001 procedures, maps, job instructions. Including SWP3, SPCC, Emergency Response.
* Developed Access Database to track Incidents, accidents, PIT permits and PIT incidents to reduce time required for weekly and monthly reporting. This DB also improved tracking of open and closed safety related work orders.
* Run the access badge system for security of all personnel.
Hi-Lex Controls, Inc Litchfield, MI
Maintenance Supervisor Sept 2006 -March 2010
* Managed a maintenance team of twenty across three shifts.
* Coordinated and purchased material for multiple projects, machine moves and facility upgrades.
* Ran the TPM program with Japanese Engineer.
* Built and set up new machines and work cells working with teams to keep ergonomically set up for operators.
Guardian Fiberglass Albion, MI
Maintenance Manager February 2005 to Sept 2006
Managed and coached a 12 person team across all shifts, scheduled work hours, resolved conflicts, determined salaries & hired six new mechanics for Albion III project.
Control the LOTO program including posting and updating the procedures & diagrams, training all personnel and issuing and tracking all locks and other LOTO equipment.
Project scheduling for all planned downtimes
Eaton Corp Ann Arbor
Maintenance & Facilities Supervisor March 2002 to February 2005
Managed, mentored and coached a 32 person team Including 2 salaried supervisors, 2 group leaders and a plant engineer, scheduled work hours, resolved conflicts, determined salaries.
Responsible for implementation of all continuous improvement projects developed through engineering, operators and continuous improvement teams.
Implementation of all lean activities including 5s, SMED, Error Proofing & TPM in both maintenance and production areas.
Responsible for the disassembly, packaging, shipping and set up all production machinery for transfer from Ann Arbor, MI to Reynosa Mexico.
Eaton Corp Ann Arbor, MI Technical Support Coordinator February 2000 to March 2002
Inspected operating machines and equipment for conformance with operational standards for safety and preventative Maintenance.
Successfully handled a tool crib part reduction of 230 part numbers to save space and on hand dollars.
Implemented new procedures, including electronic repair logs, formal process change procedures and use of two-way radios, designed to improve operations and effect greater utilization of labor.
Eaton Corporation Ann Arbor, MI
Associate Manufacturing November 1998 to February 2000
Engineer
Served as Lead ME for RPN reduction team for product groups in my area of responsibility, which included installation of vision systems and purchasing a new leak/flow tester capable of running multiple parts with different test parameters.
Sent to other Eaton facilities in Rochelle, IL. Three Rivers, Rochester Hills, Sanford N.C. and Monaco to improve throughput and quality.
Eaton Corporation Ann Arbor, MI
Electronics Technician November 1996 to November 1998
Repaired and maintained assembly and test equipment including conveyor systems in a just in time production environment.
Followed diagrams, sketches, operation manuals and manufacturer's specifications to troubleshoot, maintain and repair equipment
Used RS Logix to troubleshoot Allen Bradley PLC' s. Installed, set up and debugged DVT vision systems and leak and flow testers.
Education: Columbia Central H.S. Brooklyn, MI
1989
Baker College Jackson, MI
Attending
References: Available upon request