Post Job Free

Resume

Sign in

Power Plant Engineer

Location:
Raleigh, NC
Posted:
April 12, 2014

Contact this candidate

Resume:

Ori A. Tuvia

*** ********** ****, ****,*****, NC, Email: acdnef@r.postjobfree.com, Ph: 919-***-****

OBJECTIVE

To bring an ambitious work ethic to an entry level environmental engineering position.

EDUCATION

North Carolina State University, Raleigh, NC

B.S., Biological Engineering 2006 - 2011

Environmental Engineering Concentration

SKILLS

Certifications: Arc GIS, Sustainable Design, EIT (passed the FE)

Computer: Pro Engineer, Solid Works, LABView, MS Office, BIMS, Google Docs

Language: Fluent in Hebrew & English

EXPERIENCE

Environmental Consultant

Yozmot - Sviva Consultants Tel Aviv, Israel 2013- 2014

• Emission permit for a power plant, done according to the EU BREF’s.

• Environmental documentation brief including hazardous material event procedure.

• Risk management brief including HALOAH analyses.

• Technical analyses for disposal from pharmaceutical company

Environmental Consultant

Alded Sharony Consultants Natenya, Israel 2012 - 2013

• An international survey for wastewater treatment methods and accuracy in different industries for BOD, COD and

TOC.

• Performance review for a regional WTTP and its effect on water quality downstream.

• Performance review for industrial factories and assessing there pollution discharge quality.

• Determining the environmental impact that will result from the construction of a new industrial plant.

North Carolina Department of Environment and Natural Resources Intern

N.C. Division of Water Quality, Raleigh, NC 2011 - 2012

• Assisted in the NPDES and Pretreatment impact analysis for NC’s Triennial Review fiscal note.

• Joined visits to storm water treatment site and attended wastewater permit writing seminar.

• Participated in entering site data into DWQ’s BIMS and ARC GIS systems and passed BMP reviewer

Certification Exam.

• Created many large excel spreadsheets to automatically calculate metal allocations under the proposed dissolved

metal standards for all types of facilities.

• Determined permit limits and POTW headworks analyses given different hardness values, compared limits to

reasonable potential analyses, and provided summary impact tables. The fiscal note was presented to the EMC in

Jan. 2012.

Activities and Involvements

Israel Green Areas Reservation Protection Efforts 2013

North Carolina State University’s Environmental Club 2007 - 2010

Raleigh Bridge Club 2008 - 2010

Service Raleigh 2007 - 2009

Earth Day 2007



Contact this candidate