Resume: Jin Xu
Personal Information
Email: **.****@*****.*** (personal);
Tel: 760-***-**** (cell phone); 410-***-**** (home);
Strength and Advantage
1. Fluent in both English and Chinese Mandarin.
2. Accomplished with many applied mechanical design software and
technologies including Auto CAD, Pro-E, UG, Autodesk Inventor, Solid
work and Finite element analysis.
3. Six-Sigma GB certification holder and familiar with process / quality
control methodology. Experienced with statistical software tools.
4. Over 21 years working experience in manufacturing, Projects sites
worldwide and international marketing environments. Knowledgeable in
wind turbine generators, solar energy power plant and steam / gas
turbines. Experienced in product design, system integration, inspection
and testing procedure. Extensive projects management, schedule and
budget control, and commercial negotiation practices. Gain insight of
world renewable market trends and policies.
5. Experienced in wind, solar farms Engineering, Procurement, Construction
activities and multifarious civil construction practice.
6. Knowledgeable of engineering processes, change management, and
engineering metrics.
7. Strong organization and leadership skills. Ability to work independently
and in a team environment and be self-directed.
8. Able to work effectively in a cross-functional environment, with
multiple personnel to coordinate their activities, bring projects to
successful completion, and drive organizational performance and
excellence.
9. I'm a United States' green card holder.
Experience
2012/6 - Present ABEINSA EPC (Victorville, CA,USA)
Inspector
. Responsible for the equipment and material inspection activities and
cooperate vendors, procurement and project management departments with
all necessary witness inspection at workshops during Pre-award,
Prefabrication, During-production, Shop Final and Pre-Shipment.
. Support project engineer, site manager to expedite the materiel and
equipment delivery, site fabrication and testing. Ensure all products
will meet the requirement of Technical specifications, Design Drawings
and Testing procedures.
. Develop new vendors as purchasing needs. Evaluate the suppliers'
qualification and take commercial negotiations until PO be placed.
Inspection activities and experiences:
The inspections which I witnessed during the past 2 years list below:
GE Steam turbines: Routine performance test.
Generator: Insulation resistance test.
Forging and Welding Parts: Magnetic Particle testing, Ultrasonic test.
Pressure Vessels: Hydrostatic test, Welding inspection.
Heat exchangers: Tube welding& extending, Helium leak test,
Hydrostatic test.
Pumps: Performance Curves and NPSH Tests.
Valves: Hydro. and Air pressure Sealing test.
Control Valves: Functional test.
Metal surface treatment: Sand Blasting thickness check.
Transformers: Type or Routine test.
Control or Switch Cabinets: Functional and Running test.
Abeinsa EPC is the 8th largest contractor in the US.
My current project presentation: Turn-Key contract for a 280 MW (gross)
Solar Power Plant for the production of electricity through the
concentration of solar energy using parabolic trough collectors to heat a
Heat Transfer Fluid (HTF), used to transport the harnessed solar energy to
a steam generating system capable of making superheated steam that feeds a
steam turbine generator.
2011/2 - 2012/4 Tang Energy Group, Ltd (Dallas, Texas, USA)
Technical Coordinator
. Assist in the engineering and construction management of power
projects.
. Assist business development activities.
Project management
. Manage and implement the project through all phases of the project
life cycle including: scope definition, requirements, evaluation,
design and development, construction, installation, commissioning, and
O&M support.
. Plan, organize, direct, and control the execution of EPC projects to
meet safety, quality, cost, and schedule objectives.
. Coordinating meetings, scheduling updates, submitting deliverables,
and addressing outstanding client open items.
. Submitting RFIs to clients, review/monitor job costs vs. budgets,
manage/assist project layout/coordination, and oversee QA/QC programs.
. Managing scope of work, ensuring compliance with policies and
procedures, and ensuring contractual obligations are met.
. Providing guidance/direction for Estimators during estimating process.
. Draft and submit budget proposals, and recommend subsequent budget
changes where necessary
. Determine and assess need for additional staff and/or consultants and
conduct the appropriate recruiting if necessary during project cycle
. Initiate, establish, and maintain working relationships with owner,
engineers, suppliers and subcontractors to facilitate project
activities.
. Develop and deliver progress reports, proposals, requirements
documentation and presentations
Business development
. Assist business development manager to identify new business
opportunities, develop business relationships with new client/contacts
and lead the implementation.
. Setup connection with international (China) finance support resources
based on the renewable energy projects which already have PPA
available. Schedule and preside over business negotiations with all
relevant cooperation partners include loan banks, assurance providers,
final project owners and main stock holders.
. Develop and refine project plans specifying goals, strategy, staffing,
scheduling, identification of risks, contingency plans, and allocation
of available resources.
. Execute the tasks as defined in the project plan in order to achieve
the project goals.
. Define project scope, goals and deliverables that support business
goals in collaboration with senior management and stakeholders
. Manage changes to the project scope, schedule, and costs using
appropriate verification techniques in order to keep the project plan
accurate, updated, and reflective of authorized project changes.
. Implement approved actions to mitigate project risk events in order to
minimize the impact of the risks on the project
. Assist in the preparation of statements of work and proposals for
vendors and potential customers in conjunction with Business
Development and Corporate Development.
Achievements:
2 projects completed:
Corpus Christi wind farm, Texas 18MW;
La Brisa wind farm, Texas 400MW.
2008 - 2010/9 enXco (San Diego, CA, United States)
Project Engineer
Wind Energy:
Project Management:
. Support development team for the LGIA (Large Generation
Interconnection Agreement) application. Cooperate with wind turbine
suppliers issuing updated turbine modeling document for grid
requirement.
. Work with consulting companies for the new projects designing. Submit
drawings and specifications of civil, collection system, substation
and O&M buildings.
. Manage EPC (Engineering, Procurement and Construction) contractors for
the project construction, turbine installation, connection, energizing
and commissioning. Control the schedule and budget.
. Interface with, and provide direction to, turbine suppliers doing
relevant retrofits to meet customer's special needs. Ensure any change
activities do not conflict with venders warranty policy.
. Continuously building-up relationship with new suppliers, EPC
contractors and consulting services. Keep their proposals and quotes
comparable and optional.
. Modify as-built drawings after project completion and live database
updating.
Technical Support:
. Reduce faults and increases availability for fleet-wide turbines:
o Work with various internal and external groups to identify
fleet-wide priority fault list, generally based on annual lost
production
o Conduct preliminary assessments including fishbone,
impacts/affected population, and options/solutions
o Develop root cause analyses (RCA) and plans for corrective
action and preliminary implementation
o Provide support to Asset Management during implementation of
solutions.
. Increase turbine operating efficiency by working with various groups
to identify underperforming turbines and applying checklists.
. Review and coordinates all technical aspects of turbine supplier major
retrofits and upgrades to achieve high reliability and avoid reduced
service life and failures.
. Be generally responsible for all fleet-wide turbines from one or two
suppliers, and establish and implement standard processes with said
suppliers.
. Implement inter-organizational best practices and teambuilding.
. Coordinate with and influence a number of external and internal
groups, including the engineering and technical support personnel for
the turbine supplier and Major Component Reliability Engineer,
regional Reliability Engineering Specialist (RES), site operating
personnel, Asset Management team, and other internal parties.
. Manage turbine supplier technical resources as needed to ensure focus
on priorities and achieve performance improvement targets.
. Interface with, and provide direction to, turbine suppliers.
. Lead and support continued alignment and standardization of processes
with technical colleagues, including high-level Technical Project
Office activities, turbine RFP due diligence, and other cross-platform
initiatives.
. Support and coordinate operability reviews, end-of-warranty
inspections, turbine procurement, and wind and performance assessment
activities to ensure proper equipment operation, maximize facility
performance, and maintain budgets.
Solar Energy:
. Provide new projects' layout, Single line diagram, ventilation and
Photovoltaic system structure design.
. Visit project site for the inspection of construction and issue
resolution.
. Optimizing construction management plan to minimize the influence of
project cost.
Completed projects:
Shillo II wind farm, California 150MW;
Hoosier wind farm, Indiana 100MW;
Walnut wind farm, Illinois 100MW;
Grand Meadow wind farm, Iowa 200MW;
Maryhill wind farm, Oregon 150MW;
Nobel wind farm, Minnesota 100MW.
Sacramento solar farm, California 1MW;
Eagle Mountain solar farm, California 1MW;
Parking Roof solar farm, New Jersey 1MW.
2005 - 2007 GE (Shanghai, China)
Configuration Management, Mechanical Engineer
. Create bidding documents and support sales team for comical
negotiations.
. Issue checklist documents based on the signed contract for the
turbine's configuration. The checklist is an excel file that
highlights all main parts of the wind turbine in a standard table
format.
. Transfer the contract information (checklist) into existing database
(Pegasus), organizing documents and facilitating the project
implementation process.
. Release Bill of Material into DWB (Digital Work Bench) / ERP-Oracle
system in a timely and accurate manner. Initiated product
manufacturing assembly process.
. Provided technical support on all assigned projects constructions
includes foundations, tower erections, turbine installations,
commissioning, and O&M services.
. Doing R&D on new type of turbine's photo type, structure and PLM
optimize designing, assembling and testing (loads, fatigue, vibration,
dynamic model analysis and power output performance).
. Assist site technicians on turbines trouble shooting maintenance and
issue resolutions (clarify case) tasks. Take action on data collection
by SCADA (remote control) system and write root cause analysis report.
Utilize Six-Sigma statistic methodology getting problems fixed and
controlled. Undertake several additional re-design actions using Pro-
E software for the purpose of technical updating and turbine damaging.
. Lead quality control process activities. Ensure all RFI / clarify
cases from both outer and inner customers had to be solved
immediately. If there was any change needed, following a special DCI
(Design Change Instruction) process is necessary and keeping the
relevant BOM (Bill of Material), specifications, and drawings
documents being updated timely and under computer server based network
system control.
. Cooperate with downstream components suppliers on issues resolutions
or necessary design upgrades according to any complain and special
requirements from customers and project sites. For example, the blade
problems including water drainage, lighting protection and
transportation.
. Coach and help new on board employees and other coworkers on how to
correctly use company's process management systems to make their works
more efficiently. Organize internal technical trainings regularly to
keep team's knowledge in a fresh and advanced level.
. Be recommended to attend foundation of leadership training. Lead
configuration team performing Bill of Material release. Organize
relevant functional departments includes engineering design,
application, requisition, configuration, manufactory, transportation
teams to assist project managers meet the schedules and budgets of
projects world wide.
. Guide compliance team to maintain regulatory compliance with local
regulations, products certifications and associated permits, including
all applicable EHS (environmental, health and safety) regulations.
. Create Spare part list regarding off different project turbine
configurations. According to the market change, support sourcing team
to maintain supply chain system and develop new cooperators focus on
continuously cost out requirement.
Completed Projects:
Hutengxile wind farm, Inner Mongolia, China 100MW;
Shangyi wind farm, HeBei, China 100MW;
Rudong wind farm, Jiangsu, China 200MW;
Nanhui wind park, Shanghai, China 15MW;
And 67 Japan wind projects, over 1000MW
2004 - 2005 DongFang Machinery Co. Ltd (Xi'an, China)
Project manager / Mechanical Design Engineer
Lead 5 engineers directly who were responsible on a large cement brick
product line R&D program. Manage the project implementation, outline
and main components designing, drawing/specification releasing and
product manufacturing under schedule and budget.
. Complete system and components 2D/3D designing.
. Operate program 10% below budget.
. Complete Prototype system testing (loads, fatigue, vibration).
. Lead commercial negotiation for the first equipment selling contract.
. Compile specifications and instruction manual.
2003 - 2004 Jiaotong University (Xi'an, China)
Chief Administrator / Instructor
As the first employee of a new branch campus, be responsible for the
construction of the college. Take care of routine matters and hire staff.
. Organized and completed a 40 hectares area of new campus construction
layout design, site measurement and land expropriation. The whole
investment of this project was $200 millions.
. Recruited 137 students in 2 terms.
. Finished 120 hours teaching tasks.
1993 - 2003 AVIC Xi'an Aero-Engine (Xi'an, China)
Mechanical Engineer
. Responsible for the aero-engines' technical updating research /
designing and testing over 5 years. Tasks included turbine blade
production, X-ray exploration, intensity and static fatigue tests.
Supported workshop on engine's trouble shooting analysis, assembly and
repairing tasks.
. Joined a CCGT (Combined cycle gas turbine plant) program. Main tasks
included: turbine operation inspection, field installation / service
technical support, turbine blades components supplying and turbo
vibration analysis.
. Acting as a site manager in a super cloverleaf junction project.
Organized over 100 builders and several equipments (Mobil Powerful
Rammer, Bulldozer, Loader, concrete mixer, etc) completed 4 bridges
and 3 culverts constructions. And 0.6 acre foundation Dynamic
Compaction treatment.
. Involve in a super air-cleaning equipment R&D program based on the
customer's technical updating requirement.
. Joined a large sewage farm project and responsible for equipments and
pipeline system installation. With an excellent organization practice,
completed all construction (4 pools, 2 plants, 2 miles pipelines and
Filter/power equipments installation) and delivered to customer 1
month in advance. It saved an additional $80,000 cost for company.
. Acting as a senior engineer in 1997 and took charge of building a
pumping station project. This was really a challenging project because
the customer's investment wasn't enough. Re-designed and Re-organized
the project plan under budget. Successful saved 50% investment but
completed all constructions (7 Pumping Station, 3 miles pipelines, 30
miles Channels, 1 Flood control dam, 1 mile Tunnels, 2 Culverts, 3
Inverted Siphons, 6 Aqueducts and over 100 Water gates) under
schedule.
Education
University/College: Northwestern Polytechnic University, China
Degree: Bachelor
Major: Aero engine / Gas turbine Engineering
Grad Yr: 1993
Other Training
. Foundations of GE Leadership
. Advanced Training of the GE Wind Energy 1.5(2005)
. Six Sigma-Green Belt DFSS (2005)
. Six Sigma-Green Belt DMAIC (2005)
. Six Sigma-DOE for Experimenters (2005)
. Annual EHS Training
. Construction Supervision Training (2002)