Armando R. Camacho
**** ****** ***** ( Tracy, California 95377
Home: 209-***-**** ( Cell: 209-***-****
**********@*****.***
Objective: Maintenance Manager
Professional Profile
A driven professional with more than fifteen years of manufacturing
experience overseeing multiple departments, establishing performance
standard, controlling cost and improving overall efficiency. History of
orchestrating complex projects from design to installation with budgets of
up to $5 million. Areas of expertise include:
( Project Management ( Total Quality Management ( Lean
Manufacturing ( Preventive Maintenance
( Process Improvement ( Customer Support ( Budget Planning
/Administration
Qualification Highlights
* Diversified Project Management professional with experience managing
capital equipment projects from quotation to implementation. Process
includes defining customer equipment requirements, creating
specifications, developing project plans, budgets, timeline, compliance
analysis, reengineering, change management, status reporting, integration
plans, testing, and installation.
* Proven track record of building successful organizations to support
business objectives and company goals. Experienced in identification and
implementation of efficiency improvements and cost cutting measures.
* Highly experienced in capital equipment procurement, contract
negotiations and managing of equipment installations.
* Quick study with an ability to employ new ideas, concepts, methods and
processes. Successfully conduct strategic operational planning design,
business process and internal policy retooling.
* Exceptional oral/written communication, interpersonal, multi-tasking,
business planning, organizational, problem solving and leadership skills.
Thrive in both independent and collaborative work arenas.
* Bilingual: Fluent in both English and Spanish
Professional Experience
Mi Rancho Berber Foods Manufacturing
San Leandro, California
The company operates in a state-of-the-art 10,000 square foot production
facility that produces tortillas for local retail and foodservice
distributors. Annual revenues in excess of 20 million and 110 employees
Facilities/Maintenance Manager
January 2010 - Present
Manage equipment maintenance and parts inventory departments. Responsible
for ensuring equipment are properly maintain to achieve production
efficiency standards. In charge of building repairs, facility maintenance
and purchasing of spare parts for equipment.
* Established a compressive maintenance program which resulted in a
reduction of maintenance downtime from 23% to 8% in less than 6 months.
* Created a parts inventory section to administer the spare parts usage for
all production equipment. Inventory levels were established for all
equipment and managed to meet budget expectations
* Develop several maintenance programs that improved overall equipment
performance and building appearance which assure company pass yearly food
audit inspects with superior ratings
Pacific Coast Industries
Tracy, California
The company is a subsidiary of Maruyasu / Sekiso Japan. The company
manufactures transmission, brake and fuel lines and blow molding parts for
automotive industry. Annual revenues in excess of 40 million and 129
employees
Facilities/Maintenance Manager
April 2008 - January 2010
Provide building infrastructure and machine maintenance management support
for company. Manage team of engineers, mechanics, and inventory control
personnel. In charge plant facility maintenance, environmental management,
machine uptime performance and spare parts sourcing. Received specialize
training in TPS (Toyota Production System) through parent company from
Japan.
* Established a preventive maintenance program which increase production
efficiency by 30%
* Developed a document change control process which reduce product defect
by 25%
* Created a parts procuring system which minimize cost for parts on hand
and reduce machine downtime by having the correct parts available for
machine preventive maintenance.
Armando R. Camacho - Resume
Page: 1
Xyratex International
Scotts Valley, California
The company designs, develops and manufactures enabling technology that
supports storage and data communication networks. Annual revenues in excess
of 900 million and 1,619 employees
Project Manager
April 2006 - February 2008
Responsible for project management of capital equipment orders from
inception to implementation. Interface with customers, engineering and
manufacturing to define scope of work and develop schedule for new
equipment builds. Communicate project status, mitigate ongoing risk and
facilitate project meetings with customers. Coordinate shipping,
installation and customer training activities for implementation.
* Managed the design, production build and implementation of 9 new
equipment orders for Hitachi. The success of this project resulted in 3
additional equipment orders grossing over 5 million in revenue.
* Tasked with managing a new design product for Seagate's R & D facility
which resulted in improved yield and cycle time for the customer. This
new product also provided Xyratex with leading edge technology for next
generation products.
* Directed the execution of several customer equipment upgrades. Provided
superior customer care, analyzed process, documented engineering changes,
developed schedules, coordinated resources, controlled budgets and
planned installs.
Western Digital Corporation
Fremont, California
Fortune 500 Company - The company designs, develops, manufactures and sells
hard drives worldwide.
Annual revenues in excess of 4 billion and 29,572 employees
Equipment Engineering and Maintenance Manager
August 2003 - January 2006
Provide equipment engineering and maintenance support for factory. In
charge of equipment uptime performance, process and equipment efficiency
improvements, new equipment installations, departmental budgets, service
contracts and department personnel performance.
* Purchased, installed and qualified multi-million dollar production
equipment to support factory expansion and next generation products.
* Negotiated with vendors on price, warranty, spare parts and service
contracts.
* Reduced equipment related scrap by 25% through root-cause analysis and
implementing of several key equipment improvements.
* Reduced outside service cost by 30% as a result of recruiting talented
personnel and providing specialized training to staff.
Read-Rite Corporation
Fremont, California
The company was one of the worlds leading independent manufacturers of
magnetic recording heads for hard disk drives and tape drives.
Maintenance Manager
September 1992 - May 2003
Supervise equipment engineering and maintenance departments. Responsible
for preventive maintenance, equipment uptime improvements, cost efficiency
improvements, service contracts and department personnel performance.
* Improved equipment uptime and reliability (MTBF) on critical production
equipment.
* Reduced department support cost by 15% in 2001, and 25% in 2002.
* Provided support for all equipment installs and equipment modifications
projects for department.
Project Manager
June 1998 - June 2000
Manage all projects activities for the Equipment Service Group. Develops
supporting documentation including: project plans, scope, objective,
budgets, scheduling/timeline, change management and status reporting.
* Created standard operating procedures that improved the efficiency of our
maintenance departments resulting in improved uptime
* Led Year 2000 readiness program for wafer fab. Ensured compliance of 360
pieces of production equipment.
* Developed an equipment preventive maintenance program.
* Charged with leading multiple equipment effectiveness teams. These
successful teams resolved production-impacting equipment issues, which
increased production efficiency of the wafer-fab.
Education
Associates of Science Degree
Electronic Technology
Bay Valley Technical Institute
Santa Clara, California
Professional Development
American Management Association
* Project Management
* Production Management
* Reliability and Maintenance Management
Employer Sponsored Training
* Human relations competencies
* Business Management
* Total Quality Management (TQM)
* Toyota Production System (TPS)
Armando R. Camacho - Resume
Page: 2