CURRICULUM VITAE

CAREER OBJECTIVE:

Intend to build a career with leading corporate companies in a hi-tech

environment that will help me to explore my technical and commercial

ability for betterment and development of self and the company.

EDUCATIONAL QUALIFICATIONS:

> 10 th from Rail Way High School (T.M), Andhra Pradesh School

Secondary

> Board School, Guntakal in the year 2000.

> 12th from S.K.P Govt. Junior College (T.M), Andhra Pradesh Board of

Intermediate Education, Guntakal in the year 2002.

TECHNICAL QUALIFICATION:

> B.Tech. in Electrical and Electronics Engineering from K.S.R.M

College of Engineering, SV University in 2002-2006.

> M.Tech. in Advanced Power System and Control from National Institute

of

Technology, Hamirpur (Deemed University) in 2006-2008.

ACHIEVEMENTS:

> 2009: Training program attended related testing of CT, PT,

Capacitance & Tan Delta and Transformer diagnosis by using Omicron

models of CMC - 156, 256 & 356 and CPC 100

> 2008: National Level Paper Published on "Deregulation (Open Access)

in China-An Overview".

> 2006-2008: M.Tech Gold Medalist in NIT Hamirpur, Himachal Pradesh.

> 2007: National level Technical fair participated in NIT Hamirpur,

Himachal Pradesh.

> 2002-2006: Received merit scholarship from ONGC for the academic

performance in K.S.R.M College of Engg, Kadapa.

> 2000: National Level Science Fair Participated and Presented in

Railway High School (T.M), Guntakal.

PROJECT UNDER TAKEN:

> A Case Study on Reactive Load Compensation for Power System

Improvement.

> Optical Location of FACTS Devices to Enhance the Total Transfer

Capability.

PERSONAL PROFILE:

Father's Name : Sh. S. Krishna Naik

Date of Birth : 15/03/1985

Passport No : G4988132

Gender : Male

Marital Status : Married

Nationality : Indian

Category : ST

Language Known : Written and spoken English, Hindi and Telugu.

Permanent Address : D.No:4/1774, Bhagya Nagar, Near Pedamma Gudi,

Kalyan Durg Road, Anantapur, Andhra Pradesh (state), and Pin:

515001.

COMPUTER BACKGROUND:

> E-TAP, South wire-SAG 10

> MAT LAB, Microsoft Office ( Excel, word, etc)

SUMMARY OF EXPERIENCE:

I worked in site at kadapa various substations for R & D of optimal

location & working condition of capacitor banks as well as checking status

of real, reactive power & power loss variation by placing capacitor banks

under the guidance of chief electrical inspector (AP GENCO), from March,

2006 to sept, 2006 (six months)

Worked as Senior Engineer (Electrical) in Indo Canadian consultancy

services (Group Company of LNJ Bhilwara Group) for Hydro Power Plant Design

& Consultancy/ Transmission Line (Site & Design Experience) & Generation in

Electrical department since Aug. 2008 to 10th December, 2013

> Working as Senior Engineer (Electrical) in RGM International (India)

Pvt. Ltd. for Hydro Power Plant Design & Consultancy/ Transmission

Line (Site & Design Experience) & Generation in Electrical department

since 11th December, 2013 to Till Date.

> Promotion under process as DEPUTY MANAGER / MANAGER

Details and Length of experience in Hydro Power Plant Design & Consultancy

/Transmission Line & Generation projects: 6 years till now.

RGM International (India) Pvt Work:

Present:

1. 20 and 0.4kV Distribution Network (60000 consumers) Khulm / Marmol -

Afghanistan

2. Salma Hyro Power Project SALMA - Afghanistan

3. Sangin North and Sangin South SANGIN - SEPS

Indo Canadian consultancy services work:

Details and Length of experience in Hydro Power Plant Design & Consultancy

/Transmission Line & Generation projects: 6 years till now.

1) Preliminary design and layout of Hydro electric power plant,

Transmission Line (33 kV, 66 kV, 132 kV, 220 kV, and 400 kV) according to

Standard codes (Indian & International) and Interface of Electrical system

with Mechanical and Civil.

2) Preparation of detailed project report, tender document including Scope

of Work and Technical Specifications of Electrical equipments (Transmission

Line), cost estimates, Preparing ERM report, Bid evaluation, Coordination

with project General Manager, client and contractor.

3) Detailed design and engineering such as earthing calculations, Sag &

Stringing chart, Current carrying capacity, Surge impedance, fault level

calculations, Tower loadings, Soil resistivity (by using megger), Review of

tower spotting data, inductance & capacitance calculations etc.

Coordination with suppliers:

Tower design, detailing and approval (5 types of Towers), Foundation design

& Detailing, Conductor, OPGW/ GSS Earthwire, Insulators, H/W Fittings &

Accessories & Grounding

Coordination with Contractors:

Survey - by Others (Profile), Tower spotting - by others (400 kV, 220 kV,

132 kV, 33 kV - Profile), Geotechnical investigation - by Others, Tower

Prototype testing (5 towers), Special Tower Design & Testing sizing &

Construction List, Station etc.

4) Review of Vendors designs & drawings such as Sag & Tension, Tower

drawings, Tower spotting data, Sag curve (By using sag template) & PTCC

proposal etc.

5) Testing & Commissioning such as Technical Assistance for the project

(192 MW) 220 kV D/C Tr. Line Prini - Nalagarh s/stn.(175 km) & back support

for execution work at site .

6) Inspection for Tr. Line such as aviation visual aids (E/W Globules),

Insulators (Disc, Post & Fog insulators etc), Tower material & Field

Quality Action Plan (at project site) for 220 kV D/C Prini - Panarsa

transmission line, Transformer (designing & testing and commissioning,

detail designing etc )

192 MW ADHEP (220 kV D/C Tr. Line - 175 kM) - (Period 2008 - 2010):

Preparing line specifications, award of work to contractors and checking

their progress (Weekly & Monthly), selecting line corridor for various

voltage levels, and checking walk over and preliminary survey, check

survey, route alignment, sag template, profiling, tower spotting etc.

Electricity rules for fixing various clearances and of Indian and IEC

standards applicable to design of transmission line components, Design

calculations of towers and extensions and line diagrams for the same

considering reliability, weight, wind speed, risk factors, terrain,

temperature etc.

Checking of shop drawings, Proto Assembly so as to ensure that at site no

problems are encountered

. Selecting conductor and insulators for transmission lines.

. Sag Tension calculations, sag corrections, templates and profile

diagrams.

. Bill of quantities and cost estimation, Tests and Inspections of

towers,

Erection, testing, commissioning and handing over of transmission

lines to

client.

. Site visits and trouble shooting, Conversant with national,

International

standards and Electricity rules for transmission line structural

design.

7) Power System Analysis (Load Flow) Manual Calculations. Preparation of

Detail Project Report (Electrical). Preparation of Transformer technical

specification as per IEEE/IS/CBIP & Detailed Engineering for Power Stations

& Substations.

Previous :

1) (from Jan, 2011 to Till Date ) handling Legal issues between EPPL

verses ADHPL companies regarding LILO connections from 132 kV /220

kV substation b/w EPPL and ADHPL HEP 220 kV Tr. Line along with

coordination with PGCIL, HPSEB, POSOCO, HPPTCL, CEA & CERC (Govt.

Departments) etc., Preparing tender documents for Likhu (3X40MW) HEP

(Green Venture Ltd. - Nepal) & Nyamjang Chu (6X150 MW) HEP (Bhilwara

Energy Pvt. Ltd. - Arunachal Pradesh)

2) Construction work for Khang Tang (7.5 MW) HEP, detail survey, sag

tension calculations, checking route alignemnt, GIS and GIL for

power house etc.

3) Preparation of Technical specifications as well as site inspection

/ cheking of construction work related Preliminary & Detail Survey

of 33 kV S/C Tr. Line (at Arunachal Pradesh) etc.

4) Preparing detail design engineering of 33 kV S/C Tr. Line

5) Preparing technical data of 132 kV S/C Tr. Line of Malana - III and

33 kV S/C Tr. Line of Dhanchhu.

6) Preparing Technical offer for 220 kV Madhya Bharat Power Limited (96

MW - RONGINCHU HEP)

7) Preparing tender documents for 220 kV D/C for Madhya Bharat Power

Corporation Private Limited (96 MW Rognichu HEP)

8) Preparing Earthing design & Lighting calculations Various projects

& Transformer selection design and inspection etc

Detailed Tasks Assigned:

1. Nyamjang Chu (900 MW) HEP (Bhilwara Energy Pvt. Ltd.)

2. AD (192MW) HEP (AD Hydro Power Ltd.)

3. Likhu (120MW) HEP (Green Venture Ltd.)

4. UBDC (85 MW) HEP (Bhilwara Energy Pvt. Ltd.)

5. Mori Hanol (63 MW) HEP (Krishna Knitwear Technology Ltd.)

6. Kut (36 MW) HEP (Kut Energy Pvt. Ltd.)

7. Bara Bangal (200 MW) HEP (Bhilwara Energy Pvt. Ltd.)

8. Chango Yangthang (180 MW) HEP (Bhilwara Energy Pvt. Ltd.)

9. Khang Tang (3x2.5 MW) HEP (Bhilwara Energy Pvt. Ltd.)

10. Dhancho HEP (18 MW)

11. Malana III HEP (30 MW)

12. Fozal HEP (12.5 MW)

13. Baitarani HEP (24 MW)

Extra: Seminars for Trainee Engineers in Electrical

Detailed Tasks Assigned for preparing offer for Consultancy work:

1. Thamminapatnam [(2 X 150 MW) + (2 X 300 MW)] Coastal Thermal Power

Project (Meenakshi Energy Private Limited)

2. Amaravati (2x660MW) Thermal electric Project (Sophia Power Company

Limited)

3. Panan (290MW) Hydro Electri Project (Himagiri Hydro Energy Private

Limited)

4. Bajoli Holi (220 kV D/C Tr. Line) Hydro Electric Project (GMR Energy

Limited)

5. Marib (132 kV D/C Tr. Line) Power Project (Angelique International

Limited)

6. Tangnu Romai II (44 MW) - Tangnu Romai I (6 MW)

7. Rangnichhu HEP (96 MW)

CERTIFICATION:

I, the undersigned, certify that to the best of my knowledge and belief,

this CV correctly describes me, my qualifications, and my experience.

DATE:1/04/2014

(S. Thulasi Naik)

S. THULASI NAIK,

G1, Ground Floor, Sohana Road

Behind Radha Krishna Mandir, Gurgaon

Haryana - 122001.

Mobile No. 91-999*******

E- Mail: ***********@*****.***



Contact this candidate