NIKHIL V. DAHAKE
Cell:-+91-976*******
Email:**************@*****.***
Career Aspiration:
To serve the organization where I can utilize my intellectual
skills, work potential, innovative ideas and knowledge resources towards
making significant contribution to the Growth and Prosperity of the
organization.
Qualification:
Courses/ Board/ Institute Passing
Degree University Year
B.E.(Mech Amravati Badnera College of Engineering 2011
.) University Amravati.
D.M.E. M.S.B.T.E. V.Y.W.S.college,Amravati. 2008
Board
S.S.C Amravati Shri. Samarth High School, 2000
Amravati.
Experience Summary:
Currently working at Finolex Cables Limited Urse, PUNE.
Working as a Maintenance Engineer-Mechanical from last 2 year for
Operation and maintenance of UTILITIES & 5.6 MW Power plant running on
H.F.O. (Heavy Fuel Oil)
1 X 6R32LN Wartsila (2.0 MW) Genset
1 x 16V28/32S MAN (3.6 MW) Genset
Employment Details:
Company Name: M/S. Finolex Cables Ltd, Urse, Pune.
Professional Experience:
While working, have to maintain the Periodic Service Schedules of
Genset (WARTSILA & MAN B&W),maintain intermediate & major service schedule
of Cooling tower, Water filtering & softening plant, Compressors (Ingersoll
Rand),Air Dryer (Atlas Capco FD100),Separators for Lubricating Oil & Fuel
(Alfa Laval PA610,SA826), and Head to avoid the Brake down situation.
Role and Responsibilities :
Working as a Maintenance Engineer-Mechanical, performing the activities in
CPP (Captive Power Plant):
> Complete charge of shift. Ensure max availability of Engine and
auxiliary equipments.
> To maintain machine breakdown percentage less.
> Track engine hours, maintain and monitor performance parameters.
> Carried all the scheduled maintenance activities, plan maintenance
schedule of GENSET, cooling towers, heat exchangers, pumps etc. Water
Treatment Plant like water softener, water filter, Air compressors,
Fans/Blowers, Alfa Laval oil separator unit.
> To monitor and control the over-all maintenance activities of the
department
> New modification New machines commissioning & Installation
> Co-ordination with Production Dept. to plan the daily Load
Distribution accordingly to fulfill the un-interrupted Power
requirement for production.
> Fuel & Lubricating Oil consumption report, Reports of Chemicals & Acid
consumption for Cooling Tower with Necessary record keeping.
Installation of Air Ventilation System for GENSET:
> The new ventilation system has been installed for 16 V 28 / 32 S - MAN
B & W 3.6MW GENSET at Alternator side.
> The ventilation (supply) air quantity is to be 1x18 m3/sec, depending
on the location of the GENSET.
> The purpose of providing this ventilation system is to ventilate the
Power plant indoor space, by using the principle of Ventilation. The
equipments are designed, and implemented to force supply the fresh and
filtered air.
> During the commencement of project also implemented the cost effective
technique.
Personal Information:
> Date of Birth : 02 Dec 1984
> Correspondence Address : House No-4, Lane No-2,Old Sangvi, Pune-
7.
> Permanent Address : Eknath Vihar, Near Shankar Nagar, Amravati.
> Marital Status : Single
> Languages Known : English, Hindi, Marathi
Date :
Place : Pune NIKHIL V.
DAHAKE