Post Job Free

Resume

Sign in

Engineer Manager

Location:
Visakhapatnam, AP, India
Posted:
April 02, 2014

Contact this candidate

Resume:

Summary

. *.* years of experience as Electrical and Instrumentation engineer in

cement industry.

. Involved in Project activities from verification of P&ID, BID, IO

list, Cable Schedules to Loop checking and Group Trials.

. Hands on experience on Allen Bradley PLC Control logics and compact

logics platform L63 processor and L69 processor hardware and software

maintenance.

. Allen Bradley PLC Programming (RSLogix5000 Control logix platform and

Compact Logic) Including IO scheduling, IO Mapping and developing

logic.

. Well versed in SCADA Configuration (FTV Studio and RSView32) Alarms,

Trends, and developing HMI Displays.

. Modifications in existing Program and SCADA as per process

requirement.

. Developed Logic and SCADA for Phase-2 Unit (Packing and Truck loading

unit).

. Developed program for Standby Fans reducing breakdown time.

. Changed Local control of Bag House Purging system to PLC Control.

. Successful commissioning of Instrumentation equipments in Phase-1 of

0.7MTPA Cement Grinding Unit and Logic development for expansion

project by team work.

. Calibration of Field Instruments and Weighing Scales.

. Execute Maintenance of PLC, VFD, and Plant Instruments.

. Coordinating with Consultants and Contractors for getting the job

done.

. Consoles shifting, power and network wiring and making Control room

PC's reading for use.

. Knowledge in Networks Control Net, Device Net, Ethernet, Profibus, and

Modbus Communications.

. Installation, loop checking and coordination during erection and

commissioning of PLC, VFD, and Field Instruments.

. Friendly and easy going with people, keen observer, fast learner, able

trainer, good listener, and result oriented.

. Possesses good communication skills, analytical, problem solving,

leading and learning skills as well as keen interest in the emerging

technologies, excellent team player.

Experience (Concise)

Worked as Assistant Manager at JSW Cement Ltd, Toranagallu (Bellary Dist)

from 02nd May 2007 to 21st Dec 2012.

Educational Qualifications

BE (Instrumentation Engineering) with 72.7% from Andhra University College

of Engineering, Visakhapatnam.

Technical Skills/Competencies

Computer Knowledge C Language, MS Office 2010

Operating System Windows 2000/XP/Win7

Databases Oracle End User

Trainings Certified by M/S Rockwell Automation for completion

of PLC programming course in Control Logics

programming and Control Net networking, at Noida.

Vocation training in HPCL, Visakhapatnam.

Work Exposure

At JSW Cement Ltd as Instrumentation Engineer

Functional Area : JSW Cement Grinding Unit.

Products : GGBS and PSC Cement production, packing and

transporting.

Work Location : Toranagallu, Bellary, Karnataka.

Position 1:

Position Electrical & Instrumentation Engineer, Assistant Manager

Duration May 2009 to Dec2012

Responsibiliti Reviewing of P&ID, BID for Logic development, SCADA, and

es Loop checking in expansion Brown Field project work of

Roto Packer unit, Truck Loading Unit and Mixing Plant

Unit.

Coordination with Inter department for plant optimization

operation by providing and developing Logic changes in

logic PLC program and SCADA.

Troubleshooting of interlocks in plant logic.

Maintaining backup of PLC program and SCADA.

Carrying out routine Maintenance and planned shutdown

jobs within stipulated time.

Finalized I/O list and I/O allocation details for Allen

Bradley RSLogix5000 L63 PLC System

Deciding cable philosophy and checking cable schedules,

wiring/ interconnection diagrams, control panel wiring

diagrams etc.,

Documenting control drawings of sub-control systems,

P&ID, PLC architecture drawings, IO lists, schedules and

software Licence copies, MOM copies, AMC visits Inventory

and Budget related documents.

Documentation for Government Liaising works.

Had basic training during SAP implementation in site.

Position 2:

Position Electrical & Instrumentation Engineer, Junior Manager

Duration May 2008 to May 2009

Responsibiliti Preparation of Material requisitions in Oracle system

es required by Electrical and Instrumentation.

Inspection of Automation and Instrumentation material

received at site.

Cable schedules verification and execution of work in

time.

Calibration of weighing scales: Weigh Bridges 60Tons and

100Tons Capacity, Belt weighers, Field Instruments

(Temperature transmitters, Position transmitters,

Pressure transmitters, Flow transmitters).

Coordination with internal IT department, for attending

network and telephone related issues in office premises.

Position 3:

Position Electrical & Instrumentation Engineer, Graduate Engineer

Trainee

Duration May 2007 to May 2008

Responsibiliti Phase-1 Grinding unit PLC schematic architecture, P&ID,

es IO List verification.

Verification of Bill of Materials, Data sheets and

technical discussions with suppliers regarding

instruments and preparing comparison statement.

Coordination with contractor and suppliers during

erection and commissioning activities of PLC panels, VFD

panels and MCC Feed.

Documentation of Instrumentation relevant data.

Personal Profile

Full Name SUNITHA DEVARAPALLI

Father's Name D.Sekhara Rao

Date of Birth 25 February 1986

Marital Status Single

Nationality Indian

Strengths Proactive attitude, Responsible, Good team player,

Good written and communication skills, Ambitious

and energetic composed under pressure. :

Hardworking dedication and good Communication

skills

(Sunitha Devarapalli)



Contact this candidate