Summary
. *.* years of experience as Electrical and Instrumentation engineer in
cement industry.
. Involved in Project activities from verification of P&ID, BID, IO
list, Cable Schedules to Loop checking and Group Trials.
. Hands on experience on Allen Bradley PLC Control logics and compact
logics platform L63 processor and L69 processor hardware and software
maintenance.
. Allen Bradley PLC Programming (RSLogix5000 Control logix platform and
Compact Logic) Including IO scheduling, IO Mapping and developing
logic.
. Well versed in SCADA Configuration (FTV Studio and RSView32) Alarms,
Trends, and developing HMI Displays.
. Modifications in existing Program and SCADA as per process
requirement.
. Developed Logic and SCADA for Phase-2 Unit (Packing and Truck loading
unit).
. Developed program for Standby Fans reducing breakdown time.
. Changed Local control of Bag House Purging system to PLC Control.
. Successful commissioning of Instrumentation equipments in Phase-1 of
0.7MTPA Cement Grinding Unit and Logic development for expansion
project by team work.
. Calibration of Field Instruments and Weighing Scales.
. Execute Maintenance of PLC, VFD, and Plant Instruments.
. Coordinating with Consultants and Contractors for getting the job
done.
. Consoles shifting, power and network wiring and making Control room
PC's reading for use.
. Knowledge in Networks Control Net, Device Net, Ethernet, Profibus, and
Modbus Communications.
. Installation, loop checking and coordination during erection and
commissioning of PLC, VFD, and Field Instruments.
. Friendly and easy going with people, keen observer, fast learner, able
trainer, good listener, and result oriented.
. Possesses good communication skills, analytical, problem solving,
leading and learning skills as well as keen interest in the emerging
technologies, excellent team player.
Experience (Concise)
Worked as Assistant Manager at JSW Cement Ltd, Toranagallu (Bellary Dist)
from 02nd May 2007 to 21st Dec 2012.
Educational Qualifications
BE (Instrumentation Engineering) with 72.7% from Andhra University College
of Engineering, Visakhapatnam.
Technical Skills/Competencies
Computer Knowledge C Language, MS Office 2010
Operating System Windows 2000/XP/Win7
Databases Oracle End User
Trainings Certified by M/S Rockwell Automation for completion
of PLC programming course in Control Logics
programming and Control Net networking, at Noida.
Vocation training in HPCL, Visakhapatnam.
Work Exposure
At JSW Cement Ltd as Instrumentation Engineer
Functional Area : JSW Cement Grinding Unit.
Products : GGBS and PSC Cement production, packing and
transporting.
Work Location : Toranagallu, Bellary, Karnataka.
Position 1:
Position Electrical & Instrumentation Engineer, Assistant Manager
Duration May 2009 to Dec2012
Responsibiliti Reviewing of P&ID, BID for Logic development, SCADA, and
es Loop checking in expansion Brown Field project work of
Roto Packer unit, Truck Loading Unit and Mixing Plant
Unit.
Coordination with Inter department for plant optimization
operation by providing and developing Logic changes in
logic PLC program and SCADA.
Troubleshooting of interlocks in plant logic.
Maintaining backup of PLC program and SCADA.
Carrying out routine Maintenance and planned shutdown
jobs within stipulated time.
Finalized I/O list and I/O allocation details for Allen
Bradley RSLogix5000 L63 PLC System
Deciding cable philosophy and checking cable schedules,
wiring/ interconnection diagrams, control panel wiring
diagrams etc.,
Documenting control drawings of sub-control systems,
P&ID, PLC architecture drawings, IO lists, schedules and
software Licence copies, MOM copies, AMC visits Inventory
and Budget related documents.
Documentation for Government Liaising works.
Had basic training during SAP implementation in site.
Position 2:
Position Electrical & Instrumentation Engineer, Junior Manager
Duration May 2008 to May 2009
Responsibiliti Preparation of Material requisitions in Oracle system
es required by Electrical and Instrumentation.
Inspection of Automation and Instrumentation material
received at site.
Cable schedules verification and execution of work in
time.
Calibration of weighing scales: Weigh Bridges 60Tons and
100Tons Capacity, Belt weighers, Field Instruments
(Temperature transmitters, Position transmitters,
Pressure transmitters, Flow transmitters).
Coordination with internal IT department, for attending
network and telephone related issues in office premises.
Position 3:
Position Electrical & Instrumentation Engineer, Graduate Engineer
Trainee
Duration May 2007 to May 2008
Responsibiliti Phase-1 Grinding unit PLC schematic architecture, P&ID,
es IO List verification.
Verification of Bill of Materials, Data sheets and
technical discussions with suppliers regarding
instruments and preparing comparison statement.
Coordination with contractor and suppliers during
erection and commissioning activities of PLC panels, VFD
panels and MCC Feed.
Documentation of Instrumentation relevant data.
Personal Profile
Full Name SUNITHA DEVARAPALLI
Father's Name D.Sekhara Rao
Date of Birth 25 February 1986
Marital Status Single
Nationality Indian
Strengths Proactive attitude, Responsible, Good team player,
Good written and communication skills, Ambitious
and energetic composed under pressure. :
Hardworking dedication and good Communication
skills
(Sunitha Devarapalli)