JINOY ANTONY P.
Career Objective
[pic] Secure a position in an organization that promises career
development. Look forward to grow along with the organization.
E-mail:
jinoy_antony@yahoo.c Academic Profile
o.in B-Tech in Electrical & Electronics Engineering ( 1st Class )
jinoy.antony@gmail.c JYOTHI ENGINEERING COLLEGE, CHERUTHURUTHY,THRISSUR-KERALA
om MBA IN PROJECT MANAGEMENT - Pursuing (4th semester Pursuing)
SENSORIUM THRISSUR, KERALA.
Diploma in Electrical Engineering ( 1st Class )
Contact No: THIAGARAJAR POLYTECHNIC COLLEGE, ALAGAPPANAGAR THRISSUR-KERALA
Saudi Arabia Diploma In Project Planning & Management using PRIMAVERA
+966-0592327200*
India (Home) Employment Records
+91-889******* Total Experience - 7 Year.
IN KINGDOM OF SAUDI ARABIA
Present Address: Sep 2012 onwards working with M/s. Sendan International Co. Ltd,
Jinoy Antony as an Electrical Engineer / E&I Planning Engineer for their YANBU
Pavarattikaran House ARAMCO SINOPEC REFINERY PROJECT (Gasoline Package) With Daelim.
Job responsibilities
Manakody P.O. Preparation of Work Schedule using Primavera 6.0
Thrissur, Kerala Preparation of manpower Mobilization & Demobilization plan
India. Proper Manpower allocation as per the Work requirement.
Coordination with Client, Sub-contractors and Site Team.
Substation erection.
Date of Birth : Monitoring Installation of equipments like power transformers
04,March, 1986 (45MVA, 10MVA), Station service Transformer 11KV/433V (2.5MVA),
neutral grounding transformer CTs, PTs, Circuit Breaker,
Isolator, capacitor bank, and lightning arrester.
Passport Details: Monitoring of H.T, L.T, & Control cable Laying and Termination.
G9189442 Monitoring the site Work and Request Site Instruction for
Valid till: 06 July Variation and Re-Work.
2018 Material Procurement and follow up for delivery of material in
correct time.
Follow up for preparing of As-Built Drawings and getting
Possible Joining approval.
Time: 15 Days from Follow up for preparing Drawing and getting Approval for
Offer Letter additional work.
Receiving Date Preparation of Project Recovery Plan Preparation of reports for
daily, weekly, monthly progress & Variation Work.
Preparation of monthly invoice as per the work progress and for
Current Salary: variation work.
1850.00 USD Vendor Assistance for testing and commissioning.
Coordination for clearing Punch List.
Working complies with ARAMCO & HSE standards.
Expected Salary: Attending weekly meeting with client and preparation of MOM.
As per Company
Standard IN OMAN
April 2010 to May 2012 worked with M/s. Al Turki Enterprises
L.L.C., Oman as an Electrical Engineer for their The Wave Muscat
Project with top International Consultants like PARSONS
INTERNATIONAL, W/s ATKINS and COWI & PARTNERS. As an Electrical
Engineer with over 2 years experience in the Infrastructure and
building services. I have extensive experience in the on-site
coordination, supervision and execution, of HV, LV and ELV
Electrical systems.
The Wave Muscat is a residential enclave set alongside six
kilometers of gulf of Oman consisting of Centralized Cooling
Plant, apartments, town houses, village blocks, 750 villas,
business park, five star hotels & golf courses etc.,
Job responsibilities
Daily reporting to Project manager & Coordinator.
Nationality : Indian Primary responsibilities are site execution, testing and
commissioning and technical meetings with consultants and client.
Preparing shop drawing, get approval from the consultant/Client
Sex : Male on-site reviewing of shop drawings, raising TQ and clarify all
the Technical Queries in a thorough and timely manner, liaison
with all discipline to ensure a coordinated installation.
Marital Status: Preparation of Work Schedule using Primavera.
Single Proper Manpower Allocation (Manpower Management).
Co-ordination with Ministry of Electrical Department (MEDCo).
Preparation of Material Submittals, Method statements, Variations
Religion : Christian etc., Preparation of Design drawing for variation works.
Conduct site inspections and discuss design issues with
consultant to ensure smooth operation of the site and no delays
caused to project Progress.
License: Indian Coordination with other engineering services.
(Light + Transport Co-ordination and meeting with relevant sub contractors.
Vehicle) Preparation of Operation & Maintenance Manuals.
Maintenance work for the entire wave project up to DLP period.
Material Procurement, using SAP.
Languages Known : Working complies with HSE standards.
English, Malayalam &
Work Profile
Hindi (Read, Write & Inspecting Installation of Centralized Cooling Plant & Pump Room
speak) Switchgears and other equipments.
Tamil ( speak) Substation Erection, HV Cable-Laying from Grid Substation and
Testing of transformer, HV cable high pressure test and outgoing
LV cable test.
Reference: Good knowledge of Transformers, Ring Main Unit, Electrical motors
and Main Feeder Pillars (3200A, 1600A
Mr. Manual Dimaya Installation of Street and Landscape Lights.
Electrical Site Providing Provision for Telecom, Building Management System,
Engineer Access Control System and CCTV in the entire Wave Muscat site.
PARSONS INTL. Co. Client: "The Wave" Muscat Oman.
LLC.
The Wave Project 3 ) IN QATAR - Mar 09
Muscat, Oman Experience in TRADEMEN Trading & Contracting CO W.L.L. Doha,
Mob No: Qatar as an Electrical Design Engineer
009**-******** Designing & Detailing of Small Power drawings as per the Client
requirements and Kharamma Standards.
Designing & Detailing of lighting drawings as per the client
Reason For Looking requirements and Kharamma standards.
New Job: Checking the drawings and commenting the correction to the
draughtsman.
Project Completion Attending the discussions with the client and understanding the
on April - May requirements.
2014th Coordination with client
4)IN INDIA - March 2007 - March 2009
Experience in Kerala State Electricity Board Thrissur as an
Electrical Assistant Engineer (2007 to 2008 Night Shift)
Daily Operation and Maintenance of the 110KV substation. I got
enough exposure in the Maintenance & Operation of auto recloser,
panel board, Power Transformers, Circuit breakers, Current
transformers, Potential Transformers, Lightning arresters and
Line / Bus isolators.
Completed Projects Profiles
All External Electrical works for the Golf Academy (Substation
Erection, Both HV & LV Cable works, Landscape & Street lighting,
ELV Provision and Tapping HV Power from Overhead line through
Horizontal Thrust Bore to the substation).
E & I Work for Yanbu Aramco Sinopec Refinery Project (Gasoline
Package). (Completion on May 2014th)
Infrastructure & Electrical works for (B + G + 4) three
Apartments and Townhouses.
Infrastructure & Electrical works for 110 villas in The Wave
project.
Infrastructure & Electrical works for Oman sail (Almouj MARINA)
Dockyards.
Key Skills
PROJECT PERT/CPM Schedule for Monitoring and Control of
Activities
Project co-ordination with customers, consultants, vendors and
sub-Contractors
Inspecting the Electrical site materials
Good interpersonal, Coordination and communication skills
Computer Proficiency
PRIMAVERA 6.0
AutoCAD
Microsoft office
SAP
Pro-E
I hereby declare that all the information's given above are true and
correct with the best of my knowledge and I bear the responsibility of
the above-mentioned particulars.
Date:
Yours Sincerely,
Jinoy Antony