HIGHLIGHTS OF SKILLS AND QUALIFICATIONS
~2 years of experience in Middle East with EPC Company and ~2 year of experience with oil refinery
•
in project planning, construction( tanks and piping), procurement, monitoring & control
Created execution plans, resource deployments (manpower and equipment), project status reports,
•
completion forecasts and tracked and monitored project progress
Performed Earned Value Analysis (EVA) to monitor schedule and budget variances ensuring that
•
project would remain within allocated budget and schedule
Working knowledge of ISO standards (ISO 14001:2004, OHSAS 18001 & ISO 10002) and their
•
Implementation and integration on a management system
Familiar with ASME, ASTM and API standards including API 650, API 653 & AMSE B31.4
•
Good knowledge of non-destructive testing (NDT) of welding joints for tanks and pipelines
•
Experience in pneumatic and hydro testing of oil storage tanks and related piping
•
Familiar with estimation(direct/indirect cost) & bidding (risk/opportunity allowance & margin) process,
•
break even analysis, types of contract, front end loading & strategic spreading of cost on bid price
Working knowledge of raising change order, delay analysis and its techniques, prolongation cost
•
assessment & Estimating Risk Analysis (ERA) for contingency cost
Excellent skills in Primavera 6, MS project, MS Office Suite (Word, Excel, Power Point)
•
EDUCATION
2013
MEng.,
MEng., Engineering Management
University of Alberta, Edmonton, AB
Major Courses
• Scheduling of Repetitive and Non-repetitive Construction Projects
• Engineering Project Management
• Interpersonal Skills for Project Manager
2007
BEng., Mechanical Engineering
Eng.
NED University of Engineering & Technology, Karachi, Pakistan
WORK EXPERIENCE
2011-2012
Project
Project Coordinator
Pakistan Refinery Ltd. Karachi, Pakistan
Project: EPC of 2 oil storage tanks with combined storage capacity of 44500 cubic meters
Created WBS, established milestones, scheduled project activities, implemented logic relationships,
•
tracked critical path, performed resource loading and levelling and monitored and updated logic driven
project oriented schedule network
Developed, revised, updated and maintained execution plan as required, maintained and controlled all
•
key documentation e.g. issued work permits, third party inspections, drawings, execution plans,
method statements, Incident investigation reports and job safety assessments
Prepared overall progress S-curve and monitored progress based on the progress achieved compared
•
to planned man-hours for monitoring purposes to track project deliverables
Performed Earned Value Analysis (EVA) to monitor schedule and budget variances ensuring that
•
project would remain within allocated budget and schedule
Calculated cost and schedule variances (CV & SV) to avoid cost overruns and delay in schedule
•
Participated in daily and weekly meetings with project manager and team leaders to discuss the
•
progress, resolve project schedule, cost & technical issues
Compiled project close-out reports consisted of actual scope of work, lesson learned, resource loaded
•
schedules (planned and actual), challenges and risks identified and corrective actions implemented
2008-2009
Field
Field Engineer
Chicago Bridge & Iron(CB&I) Ras-Laffan Qatar
Project: EPC of 38 oil storage steel tanks with combined storage capacity of 900,000
cubic meters and 120 km of piping systems. (PEARL GTL PROJECT)
Supervised construction activities (15 - 20 crew members) fabrication and erection of above ground
•
steel storage tanks & interconnected piping between tanks
Ghufran
Ghufran Ali Abbasi
13,
13, 11035 – 88 Ave, Edmonton AB T6G 0Z3
13
780-***-**** *******@********.**
780-695- *******@********.**
Interpreted general arrangement drawings, specifications, Isometrics and piping and instrumentation
•
diagrams (P&IDs) for the construction team
Sequenced project activities, including those of subcontractors, to ensure contract schedule
•
requirements are met
Determined and recommend changes in methods, schedule and procedures where improvements can
•
affect the project
Supervised different test stages on tanks including inspection of tank bottom welds (Vacuum box
•
testing), inspection of reinforcement- plate welds (pneumatic testing), testing of the shell (hydrostatic
testing) using API 650 and API 653 standards.
Coordinated with inspection for non-destructive testing (NDT) i.e. dye penetrant inspection (DPI),
•
magnetic particle inspection (MPI) & radiographic testing (RT)
Communicated construction needs and expectations to other inter-company departments, i.e.
•
engineering, procurement, fabrication, etc.
Conducted tool box meetings on daily basis to ensure that crew understands company policies and
•
importance of personnel protective equipment (PPEs) during work
Maintained efficient job practices, high quality and safety standards targeting zero incidents
•
2008
Procurement
Procurement Engineer
Chicago Bridge & Iron(CB&I) Ruwais, UAE
Project: EPC of four 83,600 cubic meter nominal capacity concrete full containment
LPG tanks for propane and butane. (GASCO 3rd NLG TRAIN PROJECT)
Completed purchases in all aspects of supply chain: materials, service subcontracts, small tools,
•
equipment rentals and related servicing, and consumables
Arranged material and equipment for organization in a timely and cost effective manner
•
Prepared bids, requests for quotes (RFQ), request for information (RFI) and other vendor documents
•
Examined material specification of received material and conducted positive material identification
•
(PMI) in case of any doubt
Reviewed documents provided by vendor including material data report (MDR), mill test certificate
•
(MTC) & certificate of compliance (COC) as per ASTM standards for quality assurance
Prepared Spare Parts Inventory Report (SPIR) for the whole project of GASCO using MAXIMO
•
2007
Graduate
Graduate Engineer
Pakistan Refinery Ltd. Karachi, Pakistan
Assisted in fabrication and erection of above ground steel tanks and related piping, as per drawings
•
using API 650 & API 653 standards
Provided technical engineering information & interpretation of plans, details sheet and specifications
•
for contractors
Coordinated in hydro testing of pipelines (1.5 x designed pressure) using ASME B31.4
•
SHORT COURCES
Primavera Project Planner 6
•
APC ( Accident Prevention Course) conducted by CB & I in Qatar
•
Mobile Crane Safety Course conducted by CB & I in Dubai
•
MEMBERSHIP WITH PROFESSIONAL ASSOCIATIONS
Project Management Institute (PMI)
•
EIT registration with APEGA in progress
•
ADDITIONAL INFORMATION
Possess valid driver’s license and clean driving abstract without any restriction
•
Willing to relocate anywhere in Canada
•
Eligible to work legally in Canada without any restriction
•
References available upon request