CARLOS SANCHEZ

Civil Engineer en PDVSA Petroleos de Venezuela S.A.

acdf9y@r.postjobfree.com

Extracto

CIVIL ENGINEER WITH TEN (10) YEARS (2004-2014) AND EXECUTION OF DEVELOPING

PROJECTS FOR THE OIL INDUSTRY, GAS AND SOCIAL PROJECTS. SUPERVISION OF

CONCEPTUAL ENGINEERING, BASIC AND DETAIL. INDUSTRIAL PLANT CONSTRUCTION

MANAGEMENT AND TREATMENT OF OIL, GAS AND WATER. SURFACE FACILITIES FOR THE OIL

INDUSTRY. PROJECT MANAGEMENT. COST ESTIMATE OF WORK. PROJECT PLANNING.

PROJECT MANAGEMENT. TRACKING PROJECT. APPLICATION PROCEDURES QUALITY AND

SAFETY IN CONSTRUCTION SURFACE FACILITIES FOR OIL INDUSTRY. CALCULATION OF

FOUNDATIONS OF EQUIPMENT. CALCULATION OF BUILDINGS. PREVENTIVE AND

CORRECTIVE MAINTENANCE OF HIGHWAYS AND BRIDGES. CONSTRUCTION OF ROADS,

BUILDINGS, HOME, HOSPITAL AND SCHOOLS. PIPELINES BUILDING FOR THE OIL INDUSTRY.

BUILDING BRIDGES OF PIPE FOR OIL INDUSTRY. CONSTRUCTION OF EARTH MOVING. DRAIN

CONSTRUCTION WORKS OF RAINFALL AND WATER CONTAMINATED. STUDIES AND SOIL

SURVEYING. SITE METRICS COMPUTATIONS. PREPARATION OF PLANS AND DOCUMENTS OF

PROJECTS. ENGINEERING MANAGEMENT PROGRAMS. MANAGEMENT DESIGN STANDARDS

OIL PDVSA. MANAGEMENT INTERNATIONAL STANDARDS.

Experiencia

Civil Project Leader at PDVSA Petroleos de Venezuela S.A.

marzo de 2009 - Actualidad (5 años 1 mes)

ENGINEERING:

CIVIL PROJECT ENGINEER FOR OIL PDVSA. DESIGN OF A TREATMENT AND MANAGEMENT

PLANT OIL, GAS AND WATER. PLANT CAPACITY IS 400 THOUSAND BARRELS OF OIL PER

DAY AND 190 MILLION FEET OF GAS PER DIA.MI cubios LIABILITY IN THE PIPELINE PROJECT

HAS BEEN DESIGNING, PIPELINES, ACUEDUTOS, FOUNDATIONS FOR EQUIPMENT

(COMPRESSORS, OIL SEPARATOR, DESIDRATADOR OIL, VENT STAKES, DESGACIFIADORA

BOOT, ETC), ROADS, DRAINAGE, BUILDINGS, FOUNDATIONS OF TANKS, EARTH MOVING

PIPE BRIDGES, STRUCTURES, PIPE-RAK, STUDIES OF SOIL. DEVELOPMENT OF TECHNICAL

DOCUMENTS, SPECIFICATIONS FOR RECRUITMENT, METRIC COMPUTER WORK.

SUPERVISION IN ENGINEERING. MANAGEMENT STANDARDS PDVSA, ACI, COVENIN.

COMPLY WITH QUALITY PLAN FOR ENGINEERING.

CONSTRUCTION:

COORDINATE AND MONITOR ALL JOBS OF CONSTRUCTION PLANT IN CIVIL DISCIPLINE.

Página1

SELECTION AND MANAGEMENT OF CONTRACTORS. CONSTRUCTION COST MANAGEMENT,

REVIEW AND APPROVAL OF EVALUATIONS OF WORK. MEET PROJECT PLANNING. COMPLY

WITH QUALITY PLAN FOR CONSTRUCTION. APPLICATION OF NON-DESTRUCTIVE TESTING

QUALITY. COMPLY WITH SAFETY OF THE CORPORATION. TEAMWORK. PROGRESS REPORT

TO MANAGER OF THE WEEKLY WORK.

Engineer Planner at INVERCORE

marzo de 2008 - marzo de 2009 (1 año 1 mes)

COORDINATE AND PLANNING A PROJECT ACTIVITIES AS ALL IS WELL DRILLING 10

DRINKING WATER STATE IN THE MUNICIPALITY ANZOATEGUI URICA. FORWARD CONTROL,

VALUATIONS, PLANNED PROGRESS CURVES, CURVE INVERSION, TECHNICAL REPORT

WRITING, ETC. CONTROL AND MONITORING OF VERTICAL DRILLING AS RELEVANT

ACTIVITIES. PDVSA GAS. INFRASTRUCTURE MANAGEMENT.

Construction Project Manager at Constructora IMG C.A

noviembre de 2007 - marzo de 2008 (5 meses)

PLAN, COORDINATE, DIRECT, INSPECT AND CONTROL ACTIVITIES EXECUTION AND

OPERATING PRINCIPLES REQUIRED FOR THE PROJECT IMPLEMENTATION IN COMPLIANCE

WITH THE STANDARDS OF QUALITY, TIME, COST, PERFORMANCE AND SECURITY REQUIRED

BY THE CUSTOMER AND THE ORGANIZATION. TECHNICAL REPORT WRITING. COORDINATE

THE DEVELOPMENT OF TECHNICAL BIDS, WHICH IS ASSIGNED IN COMPLIANCE WITH

SPECIFICATIONS CUSTOMER RECEIVED AND DEFINED CRITERIA FOR EACH PARTICULAR

CASE. ADMISNISTRAR THE HUMAN RESOURCES, MATERIALS, AS WELL AS FINANCIAL

CONTRACT AND COORDINATE THE ACTIVITIES OF THE CONSTRUCTION OF 110 TOWN

HOUSE. DEALING WITH CUSTOMER FEED CONTROL, CONTROL OF VALUATIONS, PLANNED

PROGRESS CURVES, CURVE INVERSION, PROCUREMENT OF MATERIALS, ETC. CONTROL

AND MONITORING OF RELEVANT ACTIVITIES. QUALITY ASSURANCE MATERIALS. PRISM

BUILDERS PROJECT. (COLOMBIA).

PLANNING COORDINATOR at IATECA C.A

septiembre de 2007 - noviembre de 2007 (3 meses)

PLAN AND COORDINATE ALL ACTIVITIES AS A PROJECT IS THE GROUND STOP MPE-1.

DISTRICT MORICHAL. FORWARD CONTROL, VALUATIONS, PLANNED PROGRESS CURVES,

CURVES OF INVESTMENT, ETC. COORDINATE A GROUP OF PLANNERS FOR CONTROL AND

MONITORING OF RELEVANT ACTIVITIES AS A FURNACE REFRACTORY MAINTENANCE,

DESALINATORS, DISIDRATADORES, THERMAL INSULATION, LINING OF LINES, SCAFFOLD

SUPPLY. SOUTHERN DISTRICT PROJECT PDVSA. MAJOR MAINTENANCE MANAGEMENT

RESIDENT ENGINEER at ACROS CORPORATION

febrero de 2007 - septiembre de 2007 (8 meses)

PROJECT EXECUTING. CONSTRUCTION OF STEEL AND CONCRETE BUILDINGS IN VARIOUS

LEVELS. CHIEF ENGINEER FIELD AND EXECUTING THE PROJECT. QUALITY INSURANCE.

Página2

CONTROLLED CONCRETE DRAINED. CALCULATION OF AIR CONDITIONING UNITS, LEADER

OF PROCUREMENT OF MATERIALS FOR CONSTRUCTION. PROJECT EXECUTED FOR

NORTHERN DISTRICT PDVSA. SOCIAL DEVELOPMENT MANAGEMENT.

RESIDENT ENGINEER at JOSE LOPEZ CONSTRUCTION

octubre de 2006 - febrero de 2007 (5 meses)

EXECUTING WORKS, PROJECTS IN GENERAL. (BUILDING SCHOOLS FOR PDVSA).

MONITORING AND CONTROL PROJECT PLANNING, MONITORING IN QUALITY ASSURANCE

PROJECT THIS COMPANY. PROJECT EXECUTED FOR NORTHERN DISTRICT PDVSA.

MANAGEMENT OF URBAN DEVELOPMENT.

PROJECT COORDINATOR at COMPREHENSIVE AND PROFESSIONAL SERVICES XXX C.A

abril de 2006 - octubre de 2006 (7 meses)

PROJECT COORDINATOR, EXECUTOR OF WORK (SCHOOLS FOR REMODELING PDVSA) AND

CONTROL OF WORK. And MATERALES PROCUREMENT OF GENERAL SERVICES PERSONNEL

MANAGEMENT AND SAFETY DOMAIN. PROJECT EXECUTED FOR NORTHERN DISTRICT

PDVSA. MANAGEMENT OF URBAN DEVELOPMENT...

PLANNER at CONSTRUCTION ESCARKA C.A

noviembre de 2005 - mayo de 2006 (7 meses)

PROJECT PLANNER activities, or STATE IN CIVIL, VALUATIONS, ADVANCE CONTROL WORK,

ETC . SIX PROJECTS PLANNED FOR SIMULTANEOUS Monagas STATE GOVERNMENT IN THIS

COMPANY. ( 500 PLANNING AND CONSTRUCTION OF HOUSES IN MATURIN ARAGUA OF

CONTRACT N IMV - 002-2004 . REHABILITATION OF FARM ROAD PHASE III Jusepín - CAICARA

CONTACT LAEE -INV -001- 06. REHABILITATION OF FARM ROAD PHASE II Jusepín - CAICARA

CONTRACT NO LAEE -AD -INV -004- 06. WORKS ROAD IMPROVEMENT IN JOINT

AGRICULTURAL SECTION LO07 - LO01 - LO03 SPLICE Jusepín CONTRACT No. LAEE -AD -INV

-002- 06. REHABILITATION OF FARM ROAD SAN JAIME - pitched TO10 CONTRACT N FIDES-

INV -002- 05. WORKS EXPANSION AND ROAD IMPROVEMENTS IN AGRICULTURAL CAICARA

CONTRACT No. RO -INV -001- 06. REHABILITATION OF FARM ROAD CONTRACT CAICARA -

Jusepín No. RO -INV - 005-06 . RIM REPAIR FAILURE, EMERGENCY WORKS SECTOR VIA OLD

CORRAL AND BELL CONTRACT N LAEE -AD- EMG -INV -004- 05.

COST ANALYST at CELESTE CONSTRUCTION C.A

mayo de 2004 - noviembre de 2005 (1 año 7 meses)

COST ANALYST, FINANCIAL CONTROL PROJECTS, COMPUTER METRIC, APU PREPARING FOR

THE COMPANY. FINANCIAL ANALYSIS FOR PROCUREMENT OF MATERIALS

Cursos

Página3

Civil Project Leader

PDVSA Petroleos de Venezuela S.A.

PROJECT MANAGEMENT 10/2013

SAP2000 11/2012

ENGLISH 07/2013

CAPITAL INVESTMENT PROJECTS 05/2009

Organizaciones

VENEZUELA ENGINEERS ASSOCIATION

ENGINEER

diciembre de 2007 a Actualidad

Proyectos

PIPELINE CONSTRUCTION OF 16 INCHES

septiembre de 2008 a Actualidad

Miembros:CARLOS SANCHEZ

BASIC ENGINEERING PROJECT FOR NEW FACILITIES THE FURRIAL (NIF ) .

marzo de 2009 a Actualidad

Miembros:CARLOS SANCHEZ

DESIGN AND CONSTRUCTION OF A TREATMENT AND MANAGEMENT PLANT OIL, GAS AND

WATER. PLANT CAPACITY IS 400 THOUSAND BARRELS OF OIL PER DAY AND 190 MILLION

CUBIC FOOT OF GAS PER DAY

DETAILED ENGINEERING GROUND MOTION FOR NEW FACILITIES PROJECT THE

FURRIAL (NIF ) .

octubre de 2010 a Actualidad

Miembros:CARLOS SANCHEZ

DETAILED ENGINEERING OF OIL COLLECTION LINES NEW FACILITIES PROJECT THE

FURRIAL (NIF ) .

abril de 2010 a Actualidad

Miembros:CARLOS SANCHEZ

This project consisted of consulting firms develop the detail engineering of the oil lines adyancente collection

to multiple field. I as leader of the civil discipline me handle the engineering supervision and approval of civil

discipline products complying with quality.

DETAIL ENGINEERING TRANSFER LINES OIL, WATER AND GAS FACILITIES THE NEW

PROJECT FURRIAL (NIF ) .

Página4

agosto de 2010 a Actualidad

Miembros:CARLOS SANCHEZ

This project consisted of consulting firms develop the detail engineering of the collection lines of oil, water

and gas operating center new facility on Furrial. are lines will be used for transferring crude specification

treaty and under the water for further treatment and gas for their respective treatment. I as leader of the civil

discipline me handle the engineering supervision and approval of civil discipline products complying with

quality.

DETAILED ENGINEERING PROCUREMENT AND CONSTRUCTION OF A PRODUCTION

MODULE FOR NEW FACILITIES PROJECT THE FURRIAL (NIF ) .

octubre de 2012 a Actualidad

Miembros:CARLOS SANCHEZ, carlos fernandez nays, JOSE CASTILLA, CARLOS REDONDO, CESAR

URREA

This project consisted of consulting firms develop the detail engineering, procurement and construction of a

module to manage the Furrial field production. I as leader of the civil discipline me handle the supervision

and approval of the detailed engineering and construction developed module production in compliance with

quality and safety in the project.

DETAILED ENGINEERING STATION PROJECT FLOW NEW FACILITIES THE FURRIAL (NIF ) .

febrero de 2011 a Actualidad

Miembros:CARLOS SANCHEZ

THIS PROJECT IS TO DEVELOP A FLOW STATION (RAW) DRIVING WITH OIL WELLS 280 PSIG

PRESSURE IN THE OPERATING CENTRE IN Furrial. I MONITOR THE DEVELOPMENT OF

EXECUTED BY DETAILED ENGINEERING CONSULTING ENGINEERING AND DOCUMENT

APROVE THE CIVIL DISCIPLINE IN COMPLIANCE WITH QUALITY STANDARDS OF THE

CORPORATION

DETAIL ENGINEERING AND INDUSTRIAL servicemarks AUXILIARY FOR NEW FACILITIES

PROJECT THE FURRIAL (NIF).

mayo de 2012 a Actualidad

Miembros:CARLOS SANCHEZ

PROCUREMENT AND CONSTRUCTION ENGINEERING OF OIL STORAGE TANKS FOR NEW

FACILITIES PROJECT THE FURRIAL (NIF ) .

octubre de 2012 a Actualidad

Miembros:CARLOS SANCHEZ, JUAN CASTILLO, PABLO ROJAS, LISANDRO BASTARDO

THIS PROJECT IS IN THE DEVELOPMENT OF DETAILED ENGINEERING, PROCUREMENT AND

CONSTRUCTION OF CRUDE OIL STORAGE TANKS, WATER PRODUCTION AND FIRE SYSTEM

OPERATING CENTER NEW FACILITIES THE Furrial. ARE THIRTEEN (13) IN TOTAL.

SUPERVISION IS MY RESPONSIBILITY AND APPROVAL OF DETAIL ENGINEERING DISCIPLINE

DOCUMENTS EXECUTED BY A CONSULTANT CIVIL ENGINEERING AND BUILDING

FOUNDATIONS AND TANKS.

DETAIL ENGINEERING BUILDING FACILITIES THE NEW PROJECT FURRIAL (NIF ) .

Página5

agosto de 2013 a Actualidad

Miembros:CARLOS SANCHEZ, PABLO ROJAS, JUAN CASTILLO, ROSMERY TIAPA, AULIO VALERO

This project involved DEVELOPMENT ENGINEERING AND CONSTRUCTION DETAIL OF ALL

NECESSARY BUILDINGS IN DOWNTOWN NEW FACILITIES OPERATING THE Furrial. BUILD

BUILDINGS ARE: CONTROL ROOM, OFFICE BUILDING, ELECTRICAL SUBSTATION, DINING,

VALVE MAINTENANCE SHED, CLINICAL MONITORING INDUSTRIAL AND HOUSES, ETC. MY

RESPONSIBILITY WAS COORDINATING, MONITORING AND APPROVE THE COURSE

DOCUMENTS PROVIDED BY THE CONSULTANT CIVIL ENGINEERING AND BUILD ALL

BUILDINGS IN COMPLIANCE WITH THE REQUIREMENTS OF QUALITY AND SAFETY OF THE

CORPORATION.

DETAILED ENGINEERING GAS PLANT PROJECT FOR NEW FACILITIES THE FURRIAL (NIF )

.

junio de 2013 a Actualidad

Miembros:CARLOS SANCHEZ

DETAILED ENGINEERING GAS PLANT PROJECT FOR NEW FACILITIES THE FURRIAL (NIF )

.

junio de 2013 a Actualidad

Miembros:CARLOS SANCHEZ

ENGINEERING AND PROCUREMENT FOR DEHYDRATION AND PROJECT GAS SWEETENING

NEW FACILITIES THE FURRIAL (NIF).

julio de 2013 a Actualidad

Miembros:CARLOS SANCHEZ

ENGINEERING AND PROCUREMENT FOR DEHYDRATION AND PROJECT GAS SWEETENING

NEW FACILITIES THE FURRIAL (NIF).

julio de 2013 a Actualidad

Miembros:CARLOS SANCHEZ

CONSTRUCTION PROJECT EARTH MOVING NEW FACILITIES THE FURRIAL (NIF ) .

agosto de 2011 a Actualidad

Miembros:CARLOS SANCHEZ, MARIA CHANG, JOSE NOLA, MARIANNY GOMEZ

IN THIS PROJECT RUN AND MONITOR THE CONSTRUCTION OF EARTH MOVING CENTER NEW

FACILITIES OPERATING Furrial FULFILLING THE REQUIREMENTS OF QUALITY AND SAFETY

OF THE CORPORATION.

BUILDING LINES OIL COLLECTION FOR NEW FACILITIES PROJECT THE FURRIAL (NIF ) .

septiembre de 2013 a Actualidad

Miembros:CARLOS SANCHEZ

CONSTRUCTION OF OIL TRANSFER LINES FOR NEW FACILITIES PROJECT THE FURRIAL

(NIF ) .

agosto de 2013 a Actualidad

Página6

Miembros:CARLOS SANCHEZ

STATION CONSTRUCTION PROJECT HOME OIL NEW FACILITIES THE FURRIAL (NIF ) .

agosto de 2013 a Actualidad

Miembros:CARLOS SANCHEZ

Idiomas

Inglés

Aptitudes y conocimientos

Designs

Construction

Civil Engineering

Earth Moving

Road

Preventive Maintenance

Predictive Maintenance

Educación

INSTITUTO POLITECNICO SANTIAGO MARIÑO (IUPSM)

Civil Engineer, review of engineering, construction, roads, concrete, steel, project direction, earthwork, etc.

Página7

CARLOS SANCHEZ

Civil Engineer en PDVSA Petroleos de Venezuela S.A.

acdf9y@r.postjobfree.com

Contacta con CARLOS en LinkedIn

Página8



Contact this candidate