Post Job Free
Sign in

Project Manager/Engineer 6 Years Experience Operations

Location:
Tustin, CA
Posted:
April 01, 2014

Contact this candidate

Resume:

CALVIN DINH

***** ******* ***** **, ******, CA ? 510-***-**** ? ******@*****.*** ?

www.linkedin.com/in/cmdinh

Seeking new career opportunities as an Industrial or Manufacturing

Engineering in Manufacturing/Operations

PROFILE

6+ years experience as an Industrial/Manufacturing Engineer with broad

experience in manufacturing, product development and project management.

The "go to" guy for getting product out the door to customers's

satisfaction and on-time. Strong data analysis, problem solving and trouble-

shooting skills necessary to deal with manufacturing/operation issues. Good

project management skills, both planning and execution. Currently taking

coursework to prepare for PMP certification.

CORE COMPETENCIES

. Oracle ERP/MRP Applications 11i

. Visidian: Product Lifecycle Management

. Microsoft Office

. Hyperion Interactive Reporting Studio

. AutoCAD

. Glovia 7.1.0 for Windows

. Windchill PDMLink 10.1

. Lean Manufacturing/Six Sigma

. Six Sigma Green Belt Training

. Project management

. Project Development

. Process and product improvements

. Cost reduction/savings

. Tool crib implementation

. Time and motion studies

. Process layouts

. Process flow diagrams

. Designing simple tools & fixtures

. Developing visual aids

. Assembly procedures/instructions

. Bills of Materials & Product structures

. Engineering change notices: creating, implementing, and maintaining

. Cross-functional teams/projects

. Direct customer interactions

. Read and interpret engineering drawings, blueprints and schematics

. Experience in AS9100 and ISO9001 environment

SELECTED CONTRIBUTIONS

. Certified Internal Auditor (Quality, Environmental, and Safety)

. EHS Team (Environmental, Health and Safety)

. Estimating assembly production times and machine shop cycle times

. Implemented a "clean area" for special customer cleanliness

requirements

. Implementation of new ERP/MRP software

. Successful startup of S.T.A.R.T. Center (tactital alert and readiness

team)

. Involved with product line transfers to Mexico facility

CAREER TRACK

SABRITEC (SMITHS CONNECTORS)

Company Profile: Design & manufacture high performance aerospace, defense

and space electrical connector/cable assemblies, as well as telecom, test

and measurement applications. ~40M/yr.

INDUSTRIAL ENGINEER

II

2012-March 2014 Will

perform all duties that pertain to the Industrial Engineer with the

addition of:

Training technicians in the building of new products and prototypes

Ensuring assembly procedures are created & maintained

Re-working in-field product when necessary

Providing feedback for new products and prototypes

S.T.A.R.T. CENTER PROJECT MANAGER & I.E.

SUPERVISOR 20

10-2012

Performed all duties that pertain to the S.T.A.R.T. Center Project Manager

& Industrial Engineer with the addition of:

Interface with cross functional teams to coordinate the introduction

of new products to production.

Prepare labor, material, tooling and equipment cost estimates for

proposals and quoting

Maintains operation sequences and optimize processes used in the

manufacturing of parts, components, sub-assemblies and final

assemblies.

Assures all "START Center" jobs are completed to customer's

satisfaction and delivered on time.

Draws up monthly & weekly schedules of "START Center" jobs to

establish sequence of each job to meet shipping dates according to

sales orders.

Launch jobs per MRP planned orders or purchase requisitions as

needed.

Expedites operations that delay schedules and alters schedules to

meet unforeseen conditions.

Monitor, communicate, and implement engineering changes (ECOs) as

needed as it relates to START Center jobs.

INDUSTRIAL ENGINEER

I

2008-2010

Plans utilization of facilities, equipment, materials, personnel and

computer systems to improve efficiency of operation by performing the

following duties:

Establishes manufacturing Bill of Materials (BOMs), Routings, and

Engineering Change Orders (ECOs) in Oracle MRP system for new and

existing designs; also modify existing designs when necessary.

Maintain and manage manufacturing operations routing

Work with production control and production to resolve any MRP

issues

Maintain and monitor production area performance that includes

productivity, efficiency, quality and time study.

Assure maximum profitability and cost accounting by conducting

statistical cost analyses.

Perform monthly database validation reports.

Provide technical support to manufacturing shop and assembly floor.

ALCON LABORATORIES INCORPORATED

Company Profile: As the global leader in eye care, Alcon develops and

manufactures innovative medicines and devices to serve the full life cycle

of eye care needs.

MANUFACTURING ENGINEERING CO-

OP

2007-2008

. Developed and implemented solutions to real manufacturing line

issues, including time/motion studies and layout to reduce

production cost as well as increase floor space.

. Purchased and installed new equipment to replace old equipment.

. Planned and used resources to schedule activities to meet project

deadlines.

. Developed and maintained working relationship with suppliers of raw

materials and production equipment.

. Obtained hands on experience working with the latest Medical

technology in eye surgical equipments.

Accomplishments: Re-laid out Cataract operations production line, designed

and built simple fixtures for assemblers, conducted time and motion

studies, helped setup a vertical storage unit, and various projects

completed to increase production floor space.

NEW UNITED MOTORS MANUFACTURING INCORPORATED

Company Profile: High volume automotive manufacturing.

MANUFACTURING ENGINEERING CO-

OP

2006-2007

. Analyzed manufacturing processes to: improve cycle-time, increase

efficiency, and reach cost savings goals.

. Generated maintenance strategies (predictive and preventative).

. Managed project development activities, schedules, costs, and work

flow for development tasks.

. Compiled documents & created user-friendly technical manuals.

. Learned lean manufacturing principles.

Accomplishments: Conducted time studies on Injection molding machines to

eliminate waiting time, thus reducing overall cycle time by 8 seconds

which resulted in significant money savings. Implemented a spare

inventory management system, ran test to reduce paint build up on racks to

reduce cost, save time and increase efficiency.

EDUCATION

California Polytechnic State University (San Luis Obispo, CA): earned a

B.S., in Electrical Engineering with emphasis in Industrial/Manufacturing

Engineering

REFERENCES

. Sandra Mariscal, Assembly Manager, Sabritec, w:949-***-****, c:951-

743-8812: *********@********.***

. Pat O'brien, Senior Production Planner, Sabritec, 949-***-****,

*******@********.***

. Bill Ferguson, Industrial Engineer, Sabritec, w:949-***-****, c:231-

458-1240, *********@********.***

.

PERSONAL INTERESTS: Exploring the world, meeting new people, trying new

foods, snowboarding, working on cars, landscaping, playing poker, reading,

and staying up to date with current events.



Contact this candidate