Post Job Free
Sign in

Manager Quality Control

Location:
Collierville, TN
Posted:
March 30, 2014

Contact this candidate

Resume:

Jeffrey Alan Dunn

*** ******** **

Moscow, Tn ***57

901-***-****

***********@*****.***

Summary: Skilled at team building, mentoring and leading to meet and

exceed goals while maintaining internal and external customer

focus and service. An innovative, result driven team player

with a solid track record in manufacturing and facility cost

saving improvements seeking exciting opportunity in the Quality

Control Field.

Disciplines: Lean Manufacturing, Kaizen, Mistake Proofing, 5S's,SPC,

Root Cause, Project Management, R-D Testing, JIT, Auto Cad,

ISO/QS - 9000, Micro-soft office tools, FMEA, PPAP,FAI

Professional Experience:

03/2012 - Current T.B.E.I., Tishomingo, MS

Manufacturer of Heavy Duty Dump Truck Bodies and Dump

Trailers.

Manufacturing Engineering Manager/ISO Implementation Lead

. Supervise Maintenance Personal and schedule machine

down time for maintenance work.

. Punch Presses, Turret Press's, Plasma

Cutters, and Welder's.

. Order Replacement Parts for machinery.

. Capital Projects justifications and installations.

. Environmental Management.

. Paperwork

. Auditing Areas for compliancy

. Waste Disposal

. Plant Layout and Development

. Fixture Design for current and new products.

. Time Studies on both current and new products.

. New Product Process and Development

. Establishing Process and Procedures to become ISO

Compliant.

. Writing SOP's, Work Instructions, OJT's, Tier Level

Documentation, to set the plant up to be ISO 9001-2008

compliant.

. Weekly meeting with Management on product updates

. Establishing Incoming inspection criteria for all Sheet

Metal that is received.

. Aluminum

. Stainless Steel

. Cold Rolled

. Hardox 450

09/2007 - 03/2012 Coilmaster Corporation, Moscow, TN

Manufacturer of HVAC units.

Quality Manager - ISO 9001-2008

. Supervise Auditors in there duties. 7 direct reports.

. Frequency of checks.

. Paperwork that needs to be filled out.

. What to look for and why.

. Provide training for auditors.

. How to calibrate there equipment

. How to do internal audits. Both

scripted and non scripted

. How to use there equipment properly.

. Set work schedules. ( 2 shift operation)

. First articles of inspection on new products

. Write work instructions

. Write process maps

. Maintain assorted data bases

. Visit customers to assure a good working relationship.

. Visit external supplies to do random audits

. Use either 8 D or 5 Y principles on CAR's.

. Write Tier Level 1,2 and 3 documentation to assure that

we maintain ISO compliancy.

03/98 - 07/07 Detroit Diesel Remanufacturing North, Kentwood, MI

Remanufacture of Heavy Duty Diesel Injectors and Fuel Pumps

Quality/Maintenance Coordinator ISO 9000-2001

. Developed and maintained gage calibration system for in-

house use.

. Supervise Auditors in there duties. 4 direct reports.

. Developed and implemented an inventory control system

for the maintenance department

. Overseen $35,000 monthly maintenance budget. 7 Direct

Reports.

. Scheduling and maintaining a P.M. system

. Review prints and establish B.O.M. if none were received

with machinery

. Researched parts and prints for older machines to keep

them in operation

. Implemented preventive maintenance program

. Proposed and Implemented capital appropriations

. Managed renovation and upgrades of machines and

facility. Brought project in at $100,000 under budget

and 3 weeks ahead of schedule

. Fill in production supervisor when needed

. Internal Auditing

. Floor Audits

. Paperwork

. External Audits to maintain ISO

certification

Production Worker

. Worked on production floor before being promoted into

management

03/97 - 04/98 Infrared International, Grand Rapids, Michigan

(Manufacturer of Ceramic Heaters)

Assistant Production Manager

. Schedule and monitored work flow and work orders.

. Re-aligned production floor foot print to better utilize

increased work space and new equipment.

. Sent to Wales, UK to help set up plant for European

sales and manufacturing.

. Learned all operations required to make products.

04/91 - 02/97 Flex Cable, Morley, Michigan

(Manufacturer of Robotic Welding Cables)

Plant Manager

. Managed 2 locations approx 20 miles apart

. Set Monthly and Yearly budgets based on sales history

. Managed 50 plus employees between the 2 locations across

3 shifts

. Set productions schedules based on manpower and orders

. Responsible for all hiring, firing and reviews of

employees

. Repositioned foot print of production floor to better

utilize process flow. This allowed us to increase

production by 30% without adding manpower

ISO Coordinator

. Set up a quality control department for the factory

. Did all the original research to bring ISO into the

company 1994 ISO.

Warehouse Supervisor

. Set up inventory control system. This allowed us to reduce

our on-hand inventory

. Cycle counts

. Scheduled incoming and outgoing shipments

1987 - 1991 Spartain Engineered Products, White Cloud, Mi

(Metal Stamping Plant)

Die Setter

. Installation and set up of secondary and automatic

Presses

. Do first piece analysis to assure parts were to prints

before machine was turned over to operators

1984-1987 Challenge Mfg., Walker, Mi

(Metal Stamping Plant.

Press Operator/Quality Control

. Ran secondary single stroke press's

. Ran Automatic High Speed Press's

. Transferred into the Quality Control Department where I

was trained in Ford's Q1 Quality Program

. Trained In SPC

. Maintained X BAR/ R Charts

. Calibrated Equipment

. Work Place Audits of parts, which was recorded on X Bar

charts

Experience: Experienced in high volume manufacturing and facility

Management. The various processes include; Stamping,

Machining, Resistant and Robotic Welding, Assembly Lines,

Equipment automation & refurbishing, Facility upgrades,

expansions and new construction. Also Multiple 2nd jobs

in retail and in grocery. Inventory control, Forklift

operations



Contact this candidate