MOHAMMAD L. RAHMAN

** ****** ****** ******, ** 02067 781-***-****

E-mail: acddmn@r.postjobfree.com

SUMMARY

Design, Construction, and Operation & Maintenance of Water Treatment

Systems involving: Reverse Osmosis, Ultra Filtration, Backwashable

Filtration, Media Filtration, Ion Exchange and Water Softening,

Coagulation, Precipitation and Clarification, Grannular Activated Carbon

Adsorption, Iron and Manganese Removal, VOC and H2S Removal by

Degasification, pH neutralization by calcite media, Chemical Injection and

Feed Systems, Brackish and Seawater Desalination plants, and preparation of

PFDs, P&IDs and Control Logic diagrams.

Process Design of chemical, petrochemical and refinery plants to include

material and energy balance calculations; preparing equipment

specifications, PFDs and P&IDs. Plant Operation of ammonia, urea plants

including utility systems.

PROFESSIONAL EXPERIENCE

GE WATER & PROCESS TECHNOLOGIES, INC, Burlington, MA 2006 to 2013

Lead Project Engineer

Project Engineering for Design Procurement and Manufacturing of Water

Treatment Systems.

The Task included P&ID PFD preparation, general arrangement drawings,

detail drawing preparation and other drawing preparation for customer

submittal. Prepare bill of material for procurement for procurement and

manufacturing using SAP Production System. Provide response to queries to

Field Service personnel during installation and commissioning. The systems

included reverse osmosis desalination, ion exchange systems UF

microfiltration systems. Maintained schedule of document submittal and

equipment delivery on target. The major projects were:

. WEB Aruba 3.4 MGD (capacity) Seawater Desalination Plant. $14,000,000.00

project value.

Prepared valve and instrument lists, supported major pumps selection and

piping components.

. Black & Veach /Immingham, UK 600 GPM (capacity) Two Train Mixed Bed

Condensate Polishing Ion Exchange system. $1,000,000.00 value. Managed

all project engineering activities.

. MWM/St. John The Baptist Parish, LA 3MGD (capacity) brackish water

reverse osmosis system. $1,500,000.00 project value. Provided all project

engineering activities lead.

. Intel D1D HERO Ultra Pure Water System to include ion exchange vessels,

HERO reverse osmosis system. $3,400,000.00 project value.

. Other projects were Duke Energy Buck UF/RO system, Duke Energy Dan River

UF/RO system, DTE UF/RO system, Formosa Plastic mixed bed condensate

polishing, Shell Oil Co., Montreal softener system, Al-Khairat RO system

in Iraq, filtration and RO system for source water treatment.

INTEGRATED PROCESS TECHNOLOGIES, INC. Marlboro, MA 2006 to 2006

Senior Process Engineer

Ultrafiltration Systems and High Purity Water Systems for Pharmaceutical

Industry.

Process Engineering work and start up of UF/DF Systems for Cabot Corp. for

filtration of process solutions. Process engineering work for WFI system

for Wyeth. Also worked on a CIP system.

WESTFALL MANUFACTURING CO., Bristol, Rhode Island. 2004 to 2005

Product Manager

Water Filtration Systems

Making proposals for Diatomaceous Earth Filtration Systems for Municipal

water systems and also for bleach filtration system.

US FILTER CORP., COLORADO SPRINGS, COLORADO 2003 to 2004

Senior Process Engineer

Pure Water and High Purity Water Systems for Pharmaceutical Industry.

Making process reviews for water systems prior to manufacture and provide

operational procedures for operating the systems. The water systems

included USP purified water production systems with Hot Water Sanitization

systems

ADDITIONAL RELEVANT EXPERIENCE

ESCO ENGINEERING CORP., AVON, MASS.

EMCO ENGINEERING, INC., CANTON, MASS.

Senior Process Engineer/Project Mamager

Filtration System for Injection Flood in Offshore Platform, Japan Vietnam

Petroleum Co.

Performed complete design and preparation of proposal for the 160,000 bpd

filtration system. Upon award of the project, was responsible for detailed

design, project engineering, and procurement of equipment components,

fabrication and assembly of system components. The process component

included automatic self-cleaning strainers, backwashable filters followed

by cartridge filters.

Water Purification System for Water Pure Co. /Merck, New Jersey.

Performed complete design and, project engineering, procurement of

equipment components, fabrication and assembly of system components for

water systems using reverse osmosis with thin film composite membranes. The

system uses a membrane Clean-In-Place on the skid.

Ion Exchange Demineralized Water System for Brita Resin Treatment Plant,

Derry, New Hampshire.

Performed complete design and preparation of proposal for the 125 gpm water

system. Upon award of the project, was responsible for detailed design,

project engineering, procurement of equipment components, fabrication and

assembly of system components, and providing assistance for installation

and startup. The process component included carbon filter and demineralized

water system.

Demineralizer Make up Water Plants of Cogeneration Power Plants for

Bonneville Pacific/United Engineers and Constructors, Inc. at Garnet Valley

and Black Mountain, Nevada

Performed detailed engineering design; managed procurement, fabrication,

assembly of equipment, and providing assistance for start up. The

demineralizer make up water plant at each site consists of two 180 gpm

trains of softeners, two 72 gpm reverse osmosis trains and two 120 gpm

mixed bed vessels.

Seawater Desalination Plant, Johnston Island Phase I

Performed complete design and preparation of plans & specifications.

Completed final design, involved in procurement and project engineering,

installation and start up. These works included computer projection for the

membrane system and programming of Programmable Logic Controller for

control systems. The plant included Seawater pumping system, inline

coagulation, multimedia filtration, acid and antiscalant injection,

cartridge filtration, high pressure pumping, reverse osmosis membranes, and

pH adjustment and chlorination of product water.

Brackish water Desalination Plant, Hail, Saudi Arabia

The plant has a capacity of 26.4 MGD and uses lime soda softening,

filtration reverse osmosis, and post-treatment including degasification, pH

adjustment and chlorination. Responsible for conducting detailed design and

cost estimating for the project.

BADGER ENGINEERS, INC., CAMBRIDGE, MASS.

Process Engineer

Worked in Process Department and performed process design work involving

material and energy balance calculations, preparing process flow and

instrumentation diagrams, designing and specifying process equipment and

economic studies of project and processes. Worked on the following units

and processes:

Phthalic Anhydride Plant, Monsanto Co., Texas City, Texas

Collected plant data and conducted process design for plant expansion to

200Mlbs/yr. The process included oxidation of o-xylene by air in fluidized

bed reactor, condensation of crude phthalic anhydride, and purification of

phthalic anhydride by fractionation.

Alkyd Resin Plant, Americore, Inc., Paraguay

Completed the process design and conducted economic study.

Crude Oil & Vacuum Distillation Unit, Sun Oil Co., Marcus Hook, Penn.

Plant capacity 100,000 barrels/day. Crude and vacuum distillation.

Conducted process design and prepared equipment specifications for this

plant.

PMDI Synthesis, ARCO Chemical Co., Channelview, Texas

Worked on process development of PMDI synthesis unit.

Solar Desalination System, SERI, Rabigh, Saudi Arabia

Prepared complete process design and cost estimating for the system.

BARNARD & BURK, INC., CHEMICOPROCESS DIV., MOUNTAINSIDE, NJ

Process Engineer

Worked on overseas assignment in Venezuela, providing process engineering

assistance for operation of ammonia and urea plants, making recommendations

for improvement of the plants, designing a condensate recovery and

utilization system in the plant including specifications of equipment.

Plant capacities- ammonia 600 MT/day, urea 1000 MT/day.

UREA FERTILIZER FACTORY, GHORASAL, DHAKA, BANGLADESH

Project/Plant Engineer

During design and construction phase of the factory as Project Engineer

supervising construction works and checking P & IDs and equipment

specifications. After completion of the construction, was engaged in

preparing operating procedures, training of operating personnel and in

initial start up of ammonia and urea plants including utility system.

Subsequently worked as Plant Engineer and supervised operation of plant.

EDUCATION

MS, Chemical Engineering, Northeastern University, Boston, MA

BS, Chemical Engineering, Bangladesh University of Engineering

and Technology,

Dhaka, Bangladesh