Post Job Free

Resume

Sign in

Project Manager Mechanical

Location:
Chino Hills, CA
Posted:
March 26, 2014

Contact this candidate

Resume:

Laura E. Dawson - Resume Document

lLaura E. Dawson

Experience

****-**** ******** *** ****** Cucamonga, CA

Plumbing Estimator / Manager / Serv. And New Const. Operations

Estimating – Commercial Plumbing, Service and New Construction. Also assisted in revamping

operational functions of commercial service, new construction, estimating and dispatch. Primarily

worked with clients consisting of large grocery store chains for all service and remodel projects.

Worked directly with VP of Plumbing and COO to successfully implement crews designated to handle

larger scope of work encountered in service plumbing that resulted in small, fast paced TI's. This position

originated as an opportunity to estimate that evolved into a position that involved my operational and

managerial skills that required interaction with many departments and supervision of technicians.

Estimating duties included various commercial projects as well as estimating, managing and coordinating

smaller fast paced projects our specialized crew would complete that required me to directly communicate

with technicians in the field and corporate contacts, write estimates daily (averaging approx. 50-70 weekly)

small, fast paced jobs that range from overnight excavations and repairs to more extensive corrective

remodels limited to 2-3 days to complete.

2008-Current Pigtail Plumbing Chino Hills, CA

Owner/Operator of Sole Proprietorship Plumbing Contractor

Consulting, Research, Estimating, Contracts and other required general business functions for my own small

family business. (Currently in business – home based business)

2010-2012 Cantoni Plumbing, Inc Corona, CA

Independent Contractor – Plumbing Estimator and Consultant

Estimating and Consulting for Commercial and Residential Plumbing, various types of construction.

(Position originally was a work from home position, eventually became an in office full time position - left

to stay home with children and operate business from home)

2008-2011 Dynamic Plumbing Riverside, CA

Contract Administrator and Operations

Contracts, Contract Change Orders, Operations Related duties. Compiled various reports and project

related data and changes, held regularly scheduled meetings related to Operations. Typical communication

between our office (Project Manager, Superintendant, Operations Director, Sales, Payroll, HR, etc.) for

typical job start up as well as administrative duties. Including Insurance, Attorneys, and other points of

contact or reference to discuss various issues prior to and during a contract relationship. Took on several

other duties such as submittals, conflict resolution, contract discrepancies, lawsuits, and other contract

related issues. (Left due to illness)

2008(temp) Williams Mechanical Inc. Palm Desert, CA

Commercial Plumbing Foreman/Consultant Temporary (High Rise Construction)

Solair Building on Western/Wilshire in Downtown LA. Consulted and acted as Foreman/Project Manager

while in place to help accelerate production and to bring the company’s progress up to date. Redirected

crew and changed the method of operation to accomplish the company’s goal. The company was behind

when I started on the project and when I left they were ahead of schedule. (Temporary position)

2006-2008 Perfection Plumbing, Inc. Norco, CA

Commercial Plumbing Foreman

Commercial, New Construction, High-End restaurants (Ruth’s Chris Steak House, PF Chang’s, etc.), Design

Build, Commercial/Industrial (multiple projects), multiple materials and methods used for installation on

projects. Crews varied from 3 – 15men, Daily Reports, RFI’s, E.W.O., C.O., Safety Meetings, Foreman

Meetings, MEP Coordination Meetings, etc. Fast Paced Accelerated projects, Work under Extreme

Architectural and Engineering Conditions. Oversee other projects and troubleshoot for other foreman,

conflict resolution, troubleshooting, engineering/layout and design, reinstallation, appurtenance technology

consult. (Laid off due to lack of work took temp pos. with Williams Mechanical - WMI)

Page 1 of 3

Laura E. Dawson - Resume Document

2005-2006 Nicodemus Plumbing and Mechanical Los Alamitos, CA

l Commercial Plumbing Foreman

New Construction, Turner Construction: Chapman University, Lawrence & Kristina Dodge College of

Film and Media Arts. 3 story steel structure, 250,000sq. ft., acoustics engineered, Cast iron, ABS,

Rectangular Steel, copper (solder, braze, gruvlock), Gas (threaded), appliances, appurtenances, heavy

equipment and tools operation, crews varied from 1-8 men, Daily Reports, C.O., E.W.O., Safety Meetings,

Foreman Meetings, MEP Coordination Meetings, (job situations at times practically like design build) (laid

off due to lack of work took position with Perfection Plumbing)

2005 E&M Mechanical Yorba Linda, CA

Commercial Plumbing/Journeyman Plumber

New Construction Snyder Langston: Midnight Mission Los Angeles

Three Story Steel+ sub terrain parking. Cast iron, copper (solder, braze, gruvlock), Gas (weld and

threaded), rigging and staging (crane and air operations), penal code fixtures, combo waste. (Left to take

position with Nicodemus)

2004 Sulzer Plumbing/Nirvana, Inc. Fullerton, CA

Commercial Plumbing/Journeyman Plumber

Tilt-ups, Multi story TI’s, Commercial Property Management TI’s, (occasional remodels, custom homes and

commercial and residential repairs). Various poly materials DWV pipe, Cast Iron, Clay, Transite (asbestos and

cement), ABS, SDR35, C900, PVC, Copper (solder, braze and victaulic), Gas (IP and wardflex), and varied

mechanical coupling and joint systems. Operation of tools and heavy equipment varied. Crews varied from 1-5

men or worked alone. Daily Reports, R.F.I.’s, Safety Meetings, other necessary paperwork. (Left to make more

money at E&M Mechanical)

2003-2004 WestStar Const. (Union Contractor) Anaheim, CA

Commercial Plumbing/Union Plumber

North High TI, Torrance; Fullerton High School, Fullerton; El Camino College, Torrance; multiple Torrance and

Fullerton School District Elementary and High Schools TI’s and Laboratories. Various poly materials DWV

pipe, ABS, Cast Iron, C900, SDR35, Copper (Victaulic, solder, braze), gas (IP threaded, weld, and PE butt

fusion), Galvanized IP (vents and water supply), extensive utility tunnel systems, varied mechanical coupling

and joint systems, acid waste and vent systems, combo waste and vent systems. Operated backhoe, bobcat,

forks, lifts, pneumatic jackhammer, and other equipment on multiple sites. Crews varied from 1-7 men or

worked alone. Daily Reports, RFI’s, safety meetings, other necessary paperwork. (Left to make more money in

the private sector)

2001-2003 Wicketts Plumbing (Union Contractor) Yorba Linda, CA

Commercial Plumbing/Union Plumber

Multiple projects throughout Orange, LA and San Bernardino counties: New Construction, TI’s, Tilt-ups,

Laboratories, Multi-story, Strip Malls, Placentia Linda School District Elementary and High School Tis, various

community centers, remodels, custom homes. Cast Iron, Clay, Transite, Galvanized IP, Black IP (threaded and

weld), PE (butt fusion), wardflex, copper (victaulic, solder, braze), acid waste, various poly materials DWV

pipe, varied mechanical coupling and joint systems. Operated backhoe, bobcat, lifts, forklifts, and various other

equipment, tools and machinery on multiple sites. Crews varied from 1-5 men or worked alone. Daily Reports,

RFI’s, safety meetings, other necessary paperwork. (Left to another union company due to lack of work)

2000 Personal Property Experience Sleepy Hollow, CA

Soils Investigation/Individual Sewage System Modification

Reviewed and interpreted Soils Investigation for Individual Sewage Disposal System - Single Family Residence.

Researched existing system. Consulted with Geotechnical Engineer and other agencies to discuss the potential to

modify existing system or design new system. Based on compiled data and feedback of outside agencies,

designed and implemented modifications to existing systems to allow for a new leach/gray-water system to

improve system’s efficiency.

1999-2000 Yager Plumbing Huntington Beach, CA

Page 2 of 3

Laura E. Dawson - Resume Document

Commercial Plumbing/Apprentice

New Construction, TI’s, Tilt-ups, Laboratories, Multi-story, Strip Malls, Some Remodels. Cast iron, Clay,

Transite, Various poly materials DWV pipe, Galvanized IP, Black IP (threaded and weld), Copper (solder,

braze). Trained to operate backhoe, bobcat, forklifts, lift (scissor and boom) and other trade related equipment.

Education

2003-2004 A&J Training Center Dominguez Hills, CA

rd

U.A. APPRENICESHIP PROGRAM (initiated as 3 year apprentice 2002)

List of all classes taken available upon request

1998 – 2002 Fullerton College Fullerton, CA

Major: Environmental Engineering/Environmental Chemistry

Expected Graduation/Transfer CSUF undetermined

A.A., Environmental Science, A.A., Chemistry upon completion/undetermined

License

Licensed C-36 Plumber - License # 920998 and LA Journeyman License

Skills Fundamentals of Plumbing: solder, braze, mechanically inclined, familiarity with how waste, water

supply, gas systems are engineered, materials used, fittings and appurtenances, some specialty areas.

Read Prints: aptitude for finding inconsistencies that benefit employer. (i.e. generating change orders,

extra work orders, etc.)

Estimating Skills: estimate various types of projects using multiple methods and software

Supervisory Skills: Ability to run a crew or multiple crews, familiarity with code and using references,

attention to detail, troubleshooting and also take care to exhibit aesthetically pleasing work and a safe and

productive work environment.

Excellent Communication with Authorities (including written): inspectors, superintendents, other tradesmen,

engineers; and all paperwork involved, daily’s, weekly’s, safety’s, R.F.I.’s, etc.

Well-Organized Work Area/Site: keep it clean and well maintained including equipment used, material

storage/staging and inventory onsite as well as maintaining material lists, deliveries, etc.

Equipment Operation Skills: backhoe, bobcat, pettibone, fork, concrete coring and saw-cut, powder

actuated tools, lifts (scissor and boom), jackhammer (pneumatic and electric), threaders,

chop/band/circ/rotary saws, and all handheld power tools.

Computer/Technical: Master Builder, Planswift, (BidMail takeoff software), Excel, Outlook, Power Point,

Word, Word Perfect and several other programs utilized for data input and correspondence relating to my

positions.

Community activities

-Past involvement in the position of Activist to implement the planning and funding of extending the Sewer System to my

community of Sleepy Hollow.

-Invited to and presented at Career Day to represent Union Plumbers (UA) and the Plumbing Trade at the Fullerton School

District 2003.

-Nominated and Selected as a member of Manchester Who’s Who Registry of Executives and Professionals 2006-2007

Page 3 of 3



Contact this candidate