Walter Harry May
*** ***** ***** **. **** Hill, SC 29730 Tel: HOME ( 803-***-**** CELL 803-***-**** *********@*****.***
A Survey Party Chief with more than 30 years of experience in civil engineering, construction and development. Encompasses the ability to work with sub contractors and management, directing design and execution phases. Proven experience with on-site project management, delivering projects, both residential and commercial, within time and budgetary constraints.
Employment History
UELS ( Uintah ) Engineering and Land Surveying
Aug 2013 to present
Survey party chief on mutable pipeline as built surveys for Summit midstream and Meadow Lark mid stream in the Bakken area of North Dakota
PFS (PETROEUM FIELD SEVICES)
Out of Denver Colorado
Worked on pipelines for summit midstream doing as built routing and preliminary surveys
Spalding Dedecker
Oct 2010 to June 2013
905 South Blvd East Rochester hills MI 4837
Worked on highway improvements on I94 between Watervliet and Paw Paw MI
Worked in Alberta Canada on pipelines
10/2009 TO 10/2010
Worked as a security guard
Allied Barton charlotte nc
Field Engineer,
04/08-06/09
Allied Concrete Forming Concord, NC
Oversee and coordinate building and parking deck plans development, contributing to the overall successful construction of projects. Using Trimble Foresite for layout program
Lay out building and parking deck for Scana corp. in Cayce SC
Survey Party Chief/ Field Engineer, 10/06-01/08
Issacs Group Charlotte, NC
Championed the construction layout and design of for residential/ commercial developments. Managed jobs with GPS.
Survey Party Chief / Field Engineer,
03/03-10/06
PBS&J Charlotte, NC
Responsible for managing a two man layout crew with GPS. Corresponded with engineering on military bases utilizing GPS and robotic inst. Worked on SCDOT, NCDOT, and GDOT. Fort Detrick MD for National Cancer Reach Center utilizing GPS. Managed Parkersburg WV, underground water cleanup project as well as interstate pavement construction assignment. Performed high water marks in Mississippi, Florida and Georgia after national disasters. Did perlimanry field work for wideing of us 441 in Douglas GA
Survey Party Chief / Field Engineer,
02/02-03/03
RB Phar Charlotte, NC
Successfully established Topos Altas Asbuilts map making boundaries.
04/00-02/02
Land Design Charlotte, NC
Utilized GPS technology to manage a two man robotic crew assigned to residential/ commercial development projects. Benchmarked and led the Topos Altas Asbuilts boundaries process.
Survey Party Chief / Field Engineer,
01/89-04/00
ESP and Associates, Charlotte, NC
Administered residential/ commercial, interstate, and bridges development. Surveyed Marine Training Base Pairs Island, Fort Bennings, and Fort Bragg utilizing Asbuilts Altas map making, Topo boundaries, GPS static and RTK
Worked on multiple pipelines from Alabama to Washington DC
EDUCATION:
Penn Foster 2005/2006
surveying
CPCC
surveying IT Acadd 2010
CERTIFICATIONS:
osha 30 hr training card
Canadian whims card
first aid US and Canadian
snowmobile and atv training
have experience with robotic total stations and gps
h2s training
fork lift card
COMPUTER SKILLS:
PC Operating Systems, Microsoft Office, Outlook, SharePoint, Internet
VA WORK
BDLK
CHANTILLY VA
DEC 1987 TO JAN 1989
DEWBERRY AND DAVIS
FAIRFAX VA
OCT 1986 TO NOV 1987
TX WORK
VESELKA
ARLINGTON TX
MARCH 1984 TO OCT 1986
STARNES AND ASSOC
ARLINGTON TX
MARCH 1982 TO MARCH 1984
Some of the jobs I've been on
CAYCE, SC
In Cayce, SC I did the construction survey for the South Carolina Electric and Gas Headquarters (SCANA) located at the corner of Saxe Gothard Road and 12th Streets. I also layed out the footings, checked the rebar, anchor bolts and set wall alignments. A Topcon, total station was used in this project.
BURLINGTON, NC
In Burlington, NC I did the construction stake out for a mall using Trimble Robotic and Trimble R6 GPS with VRS. Two separate subdivisions were staked out using Trimble R6 GPS with TSC2 with VRS.
DOUGLAS, GA
On US441 from Douglas GA to McRea GA I staked a new alignment and topoed 350 feet each side of the alignment. This project was accomplished by using Ashtec GPS and Trimble Robotic Instruments. The alignment and topo had to go through swamp, farm land and overgrown woods.
FORT DETRICK, MD
At the National Cancer Center in Frederick, MD I did location work using Ashtech GPS and Trimble robotic instruments.
PARKERSBURG, WV
An underground water cleanup stake out and location was accomplished using Ashtech GPS and Trimble robotic instruments.
CHARLOTTE, NC
Topo land fill was done after being covered with the last layer. Then extraction wells for gas relieve were staked. This was done all over North and South Carolina before VRS technology by using a Control Loop using static and set up base station and work inside loop.
Was contracted to duke power for 2 years doing boundries powerline row powerline stake out construction on several projects thru out NC and SC
RALEIGH, NC
A Trimble 4000 was used for location work for the widening of Interstate 40 through Capel Hill and into Raleigh.
I485
Stake outs work was done for I485 in the Charlotte area using Trimble 4000 and Trimble robotic instruments.
CONCORD, NC
Topo and construction work was done for a mall in Concord, NC. This job involved using static gps control on bridges and subdivisions.
ALABAMA and MISSISSIPPI
After Katrina using Ashtech gps the location of the highest point of water inland was located in Alabama and Mississippi.
MISCELLANEOUS
Stake out of natural gas lines, fiber optic cable lines, sanitary sewer lines, underground water lines petroleum pipelines and roads using various GPS and robotic instruments.
GPS knowledge – began using in late 1997. On a scale of 1-10, I would put my expertise as an 8 due to the constantly changing technology.
I have used Trimble 400*-****-**** 480*-****-**** with Static & RTK / RTK with VRS, Trimble Pathfinder, Topcon MC-R3, and various models of Ashtec .
Topo Experience
Rockingham, NC - Located 1000 acres of wetland using Trimble Pathfinder
Charlotte, NC 2 100 acres each, did the topo after clearing using Trimble 4600 with a TSC-1 data collector
I have topoed in rough mountain terrain, swamps, wetlands, desert, farm and rural land as well as urban and suburb areas.
I have no doubts of my physical and mental ability to survey for 21 days straight on any terrain.
If you need any additional information, please feel to contact me at your convenience.
Paris Island, Ft Bragg, Ft Bennings
BEFORE 1982 WORKED IN THE OIL INDUSTRY
WORKING ON DRILLING RIGS ON AND OFF SHORE
WENT TO WORK WITH MY BROTHER ON A SURVEY CREW IN 1977 DOING WELL STAKE OUTS AND PIPELINES IN WEST TEXAS AND NEW MEXICO
STARTED SURVEYING ON A SEISMIC CREW FOR OIL EXPLORATION WORKED ALL OVER THE WESTERN UNITED STATES AND SOME IN CANADA
THIS WORK CONSISTED OF LAYING OUT LINES FOR THE RECORDING EQUIPMENT
THESE LINES WERE FROM 1 TO 20 MILES LONG AND ANYWHERE UP 200+ MILE PROJECTS
WITH THE LINES CROSSING EACH OTHER DOING A TIC TAC TOE PATTERN
HAVE EXPERIANCE USING
TOPCON 303 / 802/ A1A
WILD T16 /
GEODEMETER / 600 / 5600 / S6
TRIMBLE
LIEKA
LIETZ
SOKIA
KERN
HP
ZIES
DATA COLC
SOKIA 33 31
GEODMETER FACE PLATE TSC1 AND TSC2
TDS RANGER AND RECON
HUSKY WITH C&G SOFTWARE
HP 48 WITH TDS AND SMI SOFTWARE
Expertise on a scale of about a 8. Due to new technology changing all the time
Gps
Trimble 400*-****-**** 480*-****-**** R* Static & rtk / rtk with vrs
ASHTECH DON’T REMEMBER THE MODEL
TOPCON MC-R3
Certification and Examinations
Surveyor Exam - SIT B-1307, 1996
Some of the jobs I've been on
EDMONTON ALBERTA CANADA
Worked on pipeline doing pipe tallies asbuilts locations topo’s and construction
CAYCE, SC
In Cayce, SC I did the construction survey for the South Carolina Electric and Gas Headquarters (SCANA) located at the corner of Saxe Goth Road and 12th Streets. I also layed out the footings, checked the rebar, anchor bolts and set wall alignments. A Topcon, total station was used in this project.
BURLINGTON, NC
In Burlington, NC I did the construction stake out for a mall using Trimble Robotic and Trimble R6 GPS with VRS. Two separate subdivisions were staked out using Trimble R6 GPS with TSC2 with VRS.
DOUGLAS, GA
On US441 from Douglas GA to McRea GA I staked a new alignment and topoed 350 feet each side of the alignment. This project was accomplished by using Ashtec GPS and Trimble Robotic Instruments. The alignment and topo had to go through swamp, farm land and overgrown woods.
FORT DETRICK, MD
At the National Cancer Center in Frederick, MD I did location work using Ashtech GPS and Trimble robotic instruments.
PARKERSBURG, WV
An underground water cleanup stake out and location was accomplished using Ashtech GPS and Trimble robotic instruments.
CHARLOTTE, NC
Topo land fill was done after being covered with the last layer. Then extraction wells for gas relieve were staked. This was done all over North and South Carolina before VRS technology by using a Control Loop using static and set up base station and work inside loop.
Was contracted to duke power for 2 years doing boundries powerline row powerline stack out construction on sevaral ptojects thru out NC and SC
RALEIGH, NC
A Trimble 4000 was used for location work for the widening of Interstate 40 through Capel Hill and into Raleigh.
I485
Stake outs work was done for I485 in the Charlotte area using Trimble 4000 and Trimble robotic instruments.
CONCORD, NC
Topo and construction work was done for a mall in Concord, NC. This job involved using static gps control on bridges and subdivisions.
ALABAMA and MISSISSIPPI
After Katrina using Ashtech gps the location of the highest point of water inland was located in Alabama and Mississippi.
MISCELLANEOUS
Stake out of natural gas lines, fiber optic cable lines, sanitary sewer lines, underground water lines petroleum pipelines and roads using various GPS and robotic instruments.
GPS knowledge – began using in late 1997. On a scale of 1-10, I would put my expertise as an 8 due to the constantly changing technology.
I have used Trimble 400*-****-**** 480*-****-**** with Static & RTK / RTK with VRS, Trimble Pathfinder, Topcon MC-R3, and various models of Ashtec .
Topo Experience
Rockingham, NC - Located 1000 acres of wetland using Trimble Pathfinder
Charlotte, NC 2 100 acres each, did the topo after clearing using Trimble 4600 with a TSC-1 data collector
I have topoed in rough mountain terrain, swamps, wetlands, desert, farm and rural land as well as urban and suburb areas.
I have no doubts of my physical and mental ability to survey for 21 days straight on any terrain.
If you need any additional information, please feel to contact me at your convenience. Paris Island, Ft Bragg, Ft Bennings
REF
* George Platz spalding and dedececker
* Spalding DeDecker Associates, Inc.
* 905 South Blvd East
* Rochester Hills, MI 48307
* * Chip Clark
Allied Concrete Forming Inc
* 4413 Republic Ct NW, Concord, NC 28027 704-***-****
Mark Funkhouser
PBSJ Charlotte NC
Joe Bruno ESP and Assoc
Pineville NC 28134
Joe Hendricks
ESP and Assoc
Pineville NC 28134
Have osha 30 hr training card
have Canadian whims card
first aid US and Canadian
snowmobile and atv training
have experience with robotic total stations and gps
h2s training
fork lift card