VINITHA
RAMESH
BABU
E.
University
Drive,
Apt
#2023,Tempe
AZ
85281
Ph:
email:
********@***.***
Linkedin:
http://www.linkedin.com/in/vinitharamesh
Looking
for
full
time
opportunities
in
the
field
of
substation
design
and
automation.
My
interests
include
analysis
and
design
of
protection,
control
and
automation
products.
Two
years
experience
executing
132/33kV
and
33/11kV
substation
projects,
as
a
full
time
employee,
for
electrical
utilities
and
oil
&
gas
projects.
Registered
for
FE
exam
in
April
2014.
Educational
Qualification
Degree
Institute
CGPA
Duration
Master
of
Science
in
Engineering
Arizona
State
University,
Tempe
AZ
3.3/4
Aug
2012
–
May
2014
(Power
and
Energy
System)
(anticipated
graduation)
Bachelor
of
Technology
National
Institute
of
Technology
Karnataka
7.72/10
July
2006
to
May
2010
(Electrical
and
Electronics)
Surathkal,
India.
Work
Experience
Organization
Projects
Contributions
Duration
(Position)
-
220kV
Mahada
-
Front
end
design
for
33/11kV
indoor
substation
including
equipment
Mott
MacDonald
Grid
Station
Sept
2010
layout(section
and
plan),
and
single
line
diagrams,
protection
and
metering
&
Company
LLC.
(addition
of
to
schematics,
auxiliary
AC
DC
power
distribution,
cable
routing
and
conduit
plan,
Oman.
2bays)
July
2012.
control
schematics
of
switchgears,
relay
burden
calculation,
based
on
IEEE,
IEC
(Junior
Project
61850
and
Oman
Standards.
Engineer)
-
33kV/11kV
-
ETAP
short
circuit
studies
and
load
flow
simulations.
substation
-
Analyze
and
address
interface
issues
in
civil
and
electrical
design.
Resolve
Majlis
Oman.
technical/
financial/
contractual/construction
differences.
-
132kV/33kV
&
-
Coordinate
with
internal
team
of
different
disciplines
to
generate
design
33kV/11kV
documents
and
drawings,
ensuring
compliance
to
client
requirements
and
substations
at
standard
specifications.
Occidental
-
Review
electrical
drawings
(layouts
and
schematics
of
equipment,
grounding),
Mukhaizana,
vendor
drawings
of
switchgears,
control
-
relay
panels
and
transformers.
Oman.
-
Participated
in
factory
acceptance
test
for
33kV
control
and
relay
panel.
(Oil
and
gas
project)
-
Assist
in
site
supervision
for
construction
and
commissioning
of
33/11kV
primary
substation.
-
Detail
design
:
-
Site
survey;
gather
field
data
and
document
for
front-
end
design.
Prepare
33/11kV
Tender
document
(commercial/technical/equipment
specifications).
substations
of
-
Project
management:
Bid
evaluation,
schedule
issue
of
design
calculations
and
Dhofar
Power
drawings(MS
Projects
/
Primavera),
handled
multiple
projects
simultaneously,
Company.
communicate
and
coordinate
between
client/contractor
designers
or
engineers.
Bahwan
Familiarity
with
specifications,
vendor
drawings
of
transformers
and
switchgears
for
LV
May
2008
Engineering
distribution.
Site
visit:
33/11kV
substation,
11kV
transformer
factory
to
Company
LLC.
Project
:
Low
voltage
distribution
for
residential
building
complex
(AutoCad)
June
2008
Oman
(Trainee)
Technical
Skills:
AutoCad,
load
calculations,
determining
equipment
specifications,
distribution
plan.
Academic
Projects
Course
Projects
Software
Duration
Computer
solutions
to
Power
-
Create
sparsity-
based
triangular
factorization
routine
and
a
Matlab,
C++
Ongoing
System
Newton-
based
power
flow
program.
Power
system
analysis
-
Perform
powerflow,
voltage
drop
calculations
and
system
PowerWorld
Ongoing
stability
studies
on
a
given
transmission
network.
Power
System
Stability
-
System
stability
of
a
2-
area,
4-
machine
system.
GE
PSLF ,
Fall
2013
-
Determine
the
critical
clearing
angle
and
study
its
variation
due
PSS/E,
Matlab
to
different
generator
models.
Advanced
Power
Electronics
-
Design
of
power
converter
for
outdoor
LED
application,
along
Plecs,
MathCad
Fall
2013
with
controller
design
to
supply
a
LED
load
of
100W.
Transmission
and
Distribution
-
Design
of
400kV
transmission
line,
its
components
(insulators,
Matlab,
Spring
2013
conductors,
towers)
and
study
performance
for
different
loading
PowerWorld.
conditions.
Electric
Power
Device
-
Short
circuit
and
contingency
analysis.
PowerWorld
Fall
2012
-
Design
of
protection
schemes
(CT,
VT
and
relay
selection)
for
a
230kV
transmission
system.
Relay
coordination
and
setting
for
time
overcurrent
relay,
differential
relay
and
distance
relay
scheme
for
a
given
line
section.
Electrical
Power
Transients
-
Analyze
mitigation
of
high
voltage
transients
in
a
500kV
line.
ATP-
EMTP,
Fall
2012
-
Study
arc
flashover,
TRV
and
insulation
coordination.
PSCAD
Power
System
Operations
and
-
Assignments
based
on
contingency
analysis,
powerflow,
outage
PowerWorld
Fall
2012
Planning
tables
and
project
on
study
of
PV
penetration
to
a
grid.