MANGALORE GANESH SHENOY

**** ****** **, *****:

630-***-****

Aurora, IL 60504

**************@*****.***

SUMMARY

Total of 15+ years of Business & Technology consulting experience

within the IT Infrastructure planning, Architecture &Designing,

Implementing, testing & delivering technology solutions for various

Enterprise's

Currently working with HCSC as Sr. Infrastructure Solutions Architect

within the Enterprise Architecture Services (EAS) division

Previously worked with Infosys as a Sr. Technology Architect,

predominantly working in the areas of Data Center Infrastructure

Migration/Consolidation, DMZ layout & Network design, providing

Consultancy services on Infrastructure Planning, Architecture

definition, Network engineering, Performance Assessment, High-

Availability, Capacity planning/Sizing and Disaster recovery solutions

Industry expertise in various verticals including Information

technology services, Healthcare IT services, Retail IT, Banking,

Financial Services and Insurance, Energy &Utilities and Telecom & Data

Communications domain

Managed complex assignments in the areas of IT Strategy & Architecture,

Business transformations, Disaster recovery solutions, Business

continuity management solutions and Implementations

Engaged in consulting discussions with COO, VP's and Director's of the

client organizations

In depth understanding of (Design/implementation) of LAN/WAN, Data

Communications, Routing & Switching, VPN, Server/Storage, DR &BCP,

Security compliance, Application load balancing (F5)

Good understanding of cloud concepts and various offerings: IaaS, PaaS

and SaaS

Architectural experience with various integrations technologies using

Real-time (web services &ESB), near real-time (asynchronous

communication using MQ/ MQ Farm) and Batch Integration (using FTP &

scheduler etc.)

Experience in performing detailed Infrastructure assessment and

research of business process, identify options and prepare various

reports for management and recommend action or change

Strong communication, interpersonal skills and Leadership skills

Ability to work on multiple projects/tasks simultaneously to meet

deadlines. A very good team player and self-starter

Ability to coordinate with business, technical (Infrastructure SME's,

Engineers &DBA's etc.), End users and other support teams for technical

support in the organization

EDUCATION

Bachelor of Engineering

July 1998

Electronics & Communications Engineering

Mangalore University, India

PROFESSIONAL CERTIFICATIONS

ITIL v3

Cisco Certified Network Associate (CCNA)

IBM p-Series certified Top-Gun Consultant

IBM Web sphere Application Server Network Deployment v6.1

IBM Certified SOA solution designer

Storage Network Industry Association (SNIA) Certified Professional

BCCP Certification from Business Continuity Management Institute

TECHNICAL SKILLS

Platforms/Operat Sun Solaris 8 & 10, AIX 6.0,5.3/5.2, Linux (RHEL4 &5), SLES

ing Systems 11, Microsoft Windows 2003, 2008/12 R2, VSphere,VMWare ESX,

HP, Dell, IBM Pure AS and Power systems

Tools CA Wily Introscope, Proactive UNIX Monitoring, MQ App Watch,

Site-scope, Quality Center, Dashboards & SSH

Products/Technol AD, LDAP, RDP, IHS, Apache, Reverse/ Forward proxy, Ent.

ogies Gateway, IBM WebSphere ESB/DataPower, WAS, MQ, SOA, EAI, F5,

DNS, CA SiteMinder, FTP etc.

Project Knowledge of PM Methodologies, Infosys PM Process, MS

Management Project, MS Office Suite

Microsoft Stack Experience:

Architected windows ASP/.NET applications using IIS (windows 2003/IIS

6.0 and 2008 R2/IIS 7.5 application servers and SQL Server database's

(2000, 2005 and 2008)

Supported end to end Infrastructure requirements &applications on these

platforms as above

Worked on the design and implementation of creating reporting

databases' separate from transnational database using SQL server

database replication and reporting using the SSRS (this is in HCSC)

Familiar with SQL server management studio fundamentals (used these

tools in my experience) and comfortable Interacting/coordinating with

SQL DBA's to get the job done

Managed and Conducted Dry runs and Prod data migration move involving

SQL Database's

Performed architect role in Active Directory Migration and

Consolidation initiative

Performed Infrastructure architecture design and server sizing for MOSS

2007 and SharePoint 2010 for Document management and Intranet portal

server

EDUCATION

Bachelor of Engineering

July 1998

Electronics & Communications Engineering

Mangalore University, India

PROFESSIONAL CERTIFICATIONS

Cisco Certified Network Associate (CCNA)

ITIL v3 Foundation

IBM p-Series certified Top-Gun Consultant

IBM Web sphere Application Server Network Deployment v6.1

IBM Certified SOA solution designer

Storage Network Industry Association (SNIA) Certified Professional

BCCP Certification from Business Continuity Management Institute

PROFESSIONAL EXPERIENCE

HCSC (BlueCross Blue and Shield of IL) May

2012 - Till Date

USA

Enterprise Infrastructure Solutions Architect

Program Description: NEXT GENERATION program (NGEN) will help define HCSC's

Retail Market Enterprise Architecture and operations in preparation for the

new industry environment once the Affordable Care Act (ACA) program is in

full swing. The Infrastructure architects are the EAS leads, who will be

working with HCSC Business and IT Leadership to help define Enterprise

Infrastructure solution architectures that will meet the demands of the

changing healthcare environment as well as move HCSC as a company forward.

Responsibilities:

Perform the necessary leadership, analysis and design tasks related to

the development of large-scale enterprise solution architectures

Understand, advocate and augment the principles of information

technology strategies

Analyze enterprise business drivers to determine corresponding change

requirements

Analyze the IT environment to detect critical deficiencies, and

recommend solutions for improvement

Analyze technology industry and market trends, and determine their

potential impact on the enterprise.

"Sell" The Enterprise architecture vision, standards &process, its

outcome and ongoing results

Participate in Requirement gathering which includes

Business(Functional), Technical and Non Functional Requirements

Facilitate and guide solution decisions for the enterprise and Manage

project related key issues, Risks and Decisions

Produce Logical Infrastructure Architecture and Physical Architecture

Design (All environments including Dev, SIT, UAT, L&P, Prodfix,

Production and DR) along with LBOM and Costing deliverables to ensure

that design is in line with budgeted cost

Lead the design discussions, Present and review the Design in DCC

(Design Command Center) and obtain sign-off

Lead the implementation of a solution architecture based on enterprise

business requirements and IT strategies

Direct the governance activities associated with ensuring solution

architecture compliance

Coordinate solution architecture implementation and modification

activities

Document End to End Systems Architecture along with depicting all the

Integration systems and end to end applications transaction flow

Facilitate the evaluation and selection of software product standards,

as well as the design of standard software configurations

Consult with application or infrastructure teams to fit systems or

infrastructure to architecture, and identify when it is necessary to

modify the solution architecture to accommodate project requirements

Identify the organizational impact (for example, on skills, processes,

structures or culture) and financial impact of the Infrastructure

solution architecture

Follow TOGAF standards and Document all the Infrastructure solution

architecture design (Logical, Physical and BoM) and Cost Benefits

Analysis

Bridge the Gap between BAS (Business application services) and I&R

teams (comprised of all the Technical teams including Network, Windows

Eng., Open systems, WAS, MQ, Database etc.)

Work closely with the enterprise program management office (EPMO)

and/or project office to ensure alignment of plans with what is being

delivered

Extensively worked on NGEN projects which includes Consumer Market IVR,

Vantage Membership suite of applications, Retail shopping Cart (B2C

ecommerce Portal) & Online sales channel(B2B ecommerce portal), Managed

correspondence, Homogeneous network and Sales call center etc

Represent EAS and actively participate in SDM (solution Delivery

Methodology) project meetings from Kickoff to closure

Infosys Oct

2005 - May 2012

USA

Sr. Technology Architect

Responsibilities:

Managing and executing various client engagements in IT Infrastructure

/Technology consulting space

Managing and directing Infosys onshore and offshore delivery teams

(India and Mexico). This also include delegating tasks to other team

members in India and Mexico and review the project deliverables

Play active role in directing recruitment of consultants for infrastructure

consulting practice in Infosys-SI and ensuring retention of existing

consultants

Responsible for developing Client specific delivery strategies, work as a

part of Engagement team in developing Business/ Technology Solutions for

prospective Clients, Manage vendors for a strategic partnering to ensure

resource requirements are met in a timely fashion

Working with engagement teams of different verticals & accounts for

proposal anchoring, solution preparation, formulating RFI/ RFP

responses, Effort estimation

Account and Program Managing & overseeing the Infrastructure

Consulting/ Implementation programs

Responsible for proposing solutions focused on delivering measurable

business value to prospects and there by impact positively the chances of

winning large Data Center Re-engineering, Infrastructure Hosting/

implementation deals for Infosys

Reviewing effort estimation, in scope/ Out of scope items timeline,

execution methodology and schedule to ensure competitiveness of

deliverables and processes.

Project Management activities to include budgeting, allocation and

Timesheet approvals

Bank of America May

2009 - March 2012

Chicago, IL

Sr. Infrastructure Architect

Project Name : Architecture, Environment Planning & Engineering

The Team's mission is to provide a high quality, highly available, high

volume, secure and fault tolerant operating environment for both

development and production Channel applications. The primary role of

the Environment Engineering Team is to minimize the down time of non-

prod environments, so that they are available for testing as much as

possible. The team is also responsible for ensuring that the

infrastructure/ applications are scalable to meet the business

requirements. To achieve this, the team proactively monitors the

environments, triage issue resolution, troubleshoot defects and help

plan deployments efficiently. The other job functions include review of

environment configuration, password encryption and decryptions,

managing the technical requirements like Firewall ports opening, SMTP

request and Proxy changes etc.

Responsibilities:

Provide environment / Infrastructure architecture support, for all

managed environments (Development through Production) for corporate

cash management (B2B and B2C applications), Treasury payment

applications and their partner applications

Performed the role of Design team lead and lead the technical design

discussions of the solution/ application architecture and Recommend

scalable, resilient and cost effective solutions in accordance with the

Bank's standards

Maintain Technology architectural diagrams & Design documents

including High level and Detail Level design documents

Responsible for hardware standards and best practices, capacity

planning and server sizing, hardware configuration, software licensing,

software tools support, hardware inventory and support maintenance

upgrades, hosting planning and relationship management

Manage the Onsite/Offshore coordination in a Global Delivery Model to

meet the project deliverables on or before schedule this also includes

managing teams in India and Mexico

Assigning tasks to other team members in India and Mexico and review

the project deliverables before submission to client

Identify and remediate declining/not permitted technology as per Bank's

Enterprise standards

Work with ET&D (Enterprise technology and Delivery) and Business/

functional teams to gather all the Infrastructure, Technical and Non

functional requirements of applications

Help in capacity planning, proof of concept design and

Hardware/Software recommendation in line with bank standard's

Environment related problem determination & Categorization and Problem

resolution

Work with downstream application support in identify the root cause for

issues/ Defects and fix's

Proactively health check environments for configuration after each

deployment

Proactively monitor logs during tests for problems, help setup

monitoring for critical failures

Hardware : Sun, IBM, HP Servers

Software : Sun One Web Server, IBM WebSphere 6.0, Apache, IIS, Web

logic, Oracle RAC

Bank of America

Apr 2008 - May 2009

Chicago, IL

Sr. Infrastructure Architect

Project Name : Cashproweb Data Center Move

The Project is first of its kind for Bank and considered to be highly

critical project due to very high user volume, complexity of

applications, Re-engineering effort, around 500+ total servers to be

migrated, tight project schedule, multiple vendor coordination and

limited available documentation & support from Legacy world. The

objective of the project is to migrate the Bank's Cashpro-web suite web

applications & Portal deployed in two different legacy datacenters to

one centralized target data center. The scope included defining the

Solution Approach to build new environments from ground up with in Bank

(POC/SIT/UAT/PRE-PROD/PROD &DR) and then remediate &install

applications, migrate and then test all applications within Bank's

target Datacenter

Responsibilities:

Conducted series of workshops & interviews with clients to get the

Current system landscape and Assessment of the current infrastructure

including data center layout

Produced various deliverable as per the SOW (Assessment and discovery

phase) and Solution artifacts which can be repeatedly used in

subsequent phase of the project (Design and Implementation Phase)

Perform Architecture Gap Analysis and document the findings

Define the To-be/Target state application infrastructure architecture

design in constant consultative approach

Lead the design discussion with all the client stake holders of the

project

Preparing and reviewing the Future State Infrastructure architecture

diagrams for all in scope applications

As a Infrastructure track lead for the Data center move, responsible

for driving the project with all the Infrastructure/technical needs for

the project right from POC though DR Environments (POC, SIT, UAT, PROD

& DR)

Establishing offshore connectivity by opening the firewall ports for

servers & admin console access

Managing the Onsite/Offshore coordination in a Global Delivery Model to

meet the project deliverables on or before schedule this also includes

managing teams in India and Mexico

Assigning tasks to team members in India and Mexico and review the

project deliverables before submission to client

Identifying forward proxy needs (authenticated vs. unauthenticated

proxy) & working with proxy team and SMTP for email messaging

requirements for applications

Identify and finalizing the Security requirements including the IPsec

requirements for windows based applications

Responsible for overseeing the Server install verification, performing

health checks for servers, Server access verification for onshore

&offshore team members

Upgrade Aspects, Infrastructure sizing, migration approach &

verification

Apart from Infrastructure, handling additional responsibility for eGain

suite of applications (client facing critical application for help desk

managing service request &Live chat etc)

Ensured end to end deployment across environment besides vendor co-

ordination

Responsibility includes managing the technical prerequisites, Capacity

planning, verifying software installs & Hardware specs and sanity

testing w.r.t firewall, proxy and SMTP gateway

Hardware : Sun, IBM, HP Servers

Software : Sun One Web Server, IBM WebSphere 6.0, Apache, IIS,

Weblogic, Oracle RAC

Global Industries Limited Jan

2008 - Apr 2008

Houston, TX

Infrastructure Architect

Project Name : Microsoft SharePoint (MOSS-2007)

The Microsoft SharePoint Project has been initiated by Global's to have

the robust Document management & collaboration system for Project

Management team to start with. The fundamental requirement for this

project was to support the Global's vision to ultimately deploy

SharePoint as a full Enterprise Portal, supporting both internal and

external users, in both corporate and remote locations. The project

involved detail requirement gathering and analysis, interfacing with

business users, Planning, Design, Configuration, and Testing &

Deployment of the Microsoft SharePoint document management solution.

Responsibilities:

Interfacing with business users

Functional, Infrastructure & Non functional requirements gathering and

analysis

Define the High Level Infrastructure Architecture

Prepare Detail Design and Implementation checklists

Coding of interfaces to support these requirements

Install and Configure SharePoint on Dev, Test, Production & DR

Environment

Testing, Integration, Pilot Planning and Implementation

Documentation of the procedure to support these solutions

Post installation support

Hardware : HP DL 580 & DL 380 Servers

Software : Windows 2003, SQL-2005, MS SharePoint 2007(MOSS 2007),

Win SharePoint services 3.0

ING US Financial Services

March 2006 - May 2007

Hartford, CT

Implementation Program Manager

Project Name : ING SCON Implementation project

The project involved performing Implementation Project Manager Role

responsible for Planning & Managing the Production Applications Dry

runs and Migration's in a Server consolidation project. The work

profile involved conducting kick off meetings, daily and weekly

meetings with application leads and SME's to plan and prepare

production data and application migrations.

Responsibilities:

Conducting daily and weekly status meetings with project team

Conducting Technical working session with cross functional teams and

technical SME's

Gather data migration and application profile information

Prepare implementation approach and project plan including schedule

&timelines

Oversee dry run activities

Oversee production deployment management

Documentation of weekly status report and senior management escalation

document

Hardware : SUN, IBM and HP servers

Software : UNIX, Windows, Solaris, SQL server and Oracle

AT&T Oct

2005 - March 2006

St. Louis, MO

Sr Infrastructure Consultant

Project Name : SAP Data Archival

The project involved SAP data archival solution for HR & CRM modules.

This involved Infrastructure architecture assessment of the existing

solution, gap analysis, requirement gathering for new solution, Storage

assessment & capacity estimation, architecture design and validation of

the new SAP data archival solution, vendor management for the archival

solution implementation and technology & products evaluation in the

enterprise servers, storage and ECM arena.

Responsibilities:

Architecture assessment and Gap analysis

Infrastructure architecture design

Server and Storage capacity planning

Archival technology and products evaluation

Vendor co-ordination &Management

Solution Implementation roadmap and oversee implementation

Hardware : IBM P5-550, Hitachi Thunder V9565 storage system

Software : SAP HR ECC 5.0, SAP Archive link 4.6, AIX 5.2, FileNet

ACSAP, FileNet IS 4.0

Telstra

May 2005 - Aug 2005

Melbourne, Australia

Infrastructure Test Consultant

Project Name : EAI P5 MAXIM Manual Disaster Recovery

EAI P5 MAXIM Manual Disaster Recovery is a Disaster Recovery Project

involved building the DR capability for the EAI P5 MAXIM Applications

servers. P5 is a Production Environment of Telstra, where the EAI MAXIM

application has been hosted. The P5 MAXIM EAI integrates various

backend applications endpoints with Siebel Maxim application at the

front end. The P5 Production Environment is located at Telstra,

Melbourne and the S5-DR build site was build at Telstra, Sydney.

Responsibilities:

DNS Design for SIT Testing & DNS Assumptions

Defining the Test Strategy for EAI P5 MAXIM Manual DR

Define the Master Test Plan & Detail Test Plan

Formulating the Interface Planning & Testing Document for DR Trial

Engaging Telstra SIT Support team and endpoint applications interfaces

for the SIT execution

System Integration Testing, User Acceptance Testing & NFR Test

Management

Hardware : SUN V880 & 890 Servers.

Software : Oracle 9i, Sun Solaris 8, EAI MAXIM applications.

Infosys Technologies

Nov 2004 - Apr 2005

Bangalore, India

Infrastructure Consultant

Project Name : Infrastructure Solutions Competency Development

Infrastructure Solutions Competency Development was a in-house project

involved creating proposals for the customer RFPs, responding to

RFP's/RFI's, Creating white papers, Business presentations, case

studies and solution decks preparation in line with Infrastructure

planning, Performance Assessment, High Availability, Capacity planning,

Server/ Application Sizing, Disaster Recovery & Business continuity and

Security & compliance.

Responsibilities:

Proposal preparations

Responding to RFPs and RFIs.

White paper & Solution developments

Business presentation preparations

Preparation of project case studies

Reliance Infocomm Ltd

Oct 2003 - Nov 2004

Mumbai, India

Executive L3- Network (TAC)

Project Name : Internet & data Broadband services using Metro

Ethernet

The Project involved Planning, Design, Implement, Monitor & Support for

the Reliance Nationwide Metro Ethernet Networks for providing Internet,

Ethernet based leased line services, L2/ L3 VPN Broadband services. As

a TAC member resolving the issues from support team and handling TAC

cases with vendor for the root cause analysis and immediate resolution.

Responsibilities:

Planning & Design of Metro Ethernet Network (MEN)

Implementation & configuring MEN

Monitor & Troubleshooting of MEN for Internet & Broadband service

TAC (Technical assistance committee) team member

Vendor Interactions & coordination

Hardware : Atrica 8100 & Atrica 2100 optical Ethernet switch

Software : ASPEN- NMS, MPLS, VPN, OSPF and Layer 2/3 routing &

switching

Project Name : Network & Performance Management of Reliance web

world network

This project involved Network & Performance Management of Reliance web

world network throughout India using the Cisco multilink PPP Network.

This network provides the various applications at the web stores using

the VLAN's concepts & Reliance Data Network (RDN) for providing

connections to the respective servers located at Internet Data Center,

Mumbai.

Responsibilities:

Providing the Level 2 support for the Reliance nationwide web world

network

Hardware : Cisco 3645, 3660 & 3675 Routers, Nortel 1424T switch &

420T baystack Hubs.

Software : Cisco IOS, Whats-UP Gold, HPOV NMS

Software Technology Parks of India

Feb 1999 - Oct 2003

Bangalore, India

Member Technical Staff- E1

Project Name : STPI Softnet services and Connectivity solution for

Manipal Media Pvt. Ltd.

The project involved providing the High speed dedicated International

Private leased circuits and Internet services to Software companies,

100% EOU's, Press/ Media companies and Educational institutions. It

involved rolling out of the STPI softnet (IP & IPLC services) services

in Manipal & Mangalore through the STPI Gateway. The Project also

involved providing the dedicated direct Internet connectivity to the

Manipal media office in Manipal and IP VPN connectivity solution to

their branch offices in Bangalore & Mumbai. It also involved providing

the backup Connectivity through ISDN/ Dialup.

Responsibilities:

Planning & Design and Implementation of IP/ IPLC circuits &VPN

Implementation & Testing of the IP circuits

Configuration Management

Network management & trouble shooting

Proposals & Business development activities

Vendor/Customer Interactions & coordination

Hardware : Cisco 3645 Router, Cisco C2900 switch

Software : Cisco IOS, Microsoft VPN configuration and ISDN

Project Name : Asymmetrical Internet Satellite Gateway Installation

The Project Involved setting up of the IP & IPLC Gateway with

asymmetrical bandwidth with service provider as Concert (AT&T & BT) and

setting up of Network Operation center. It involved Planning and

designing of ISP network, hardware selection and bandwidth management.

Installation and configuration of the cisco4500 router for the backbone

connectivity with 1Mbps. Installation and configuration of Cisco 2900

switch for the STPI LAN with 50 nodes. Installation and configuration

of New bridge Bandwidth Manager for managing the bandwidth allocation.

Installation and configuration of Solaris 2.6 on Sun Ultra10S machine

for email and DNS services. Project also involved setting up of the N/W

Management, PPP, TCP/IP, Internet Application Protocols, Networking

Products, Routing and Switching, Operations Support Systems.

Responsibilities:

Satellite Gateway installation &Carrier coordination

Planning, design and Implementation of IP/ IPLC & Internet Link

End to End Testing of the IP/ IPLC circuits

TCP/IP Configuration Management

Network management & trouble shooting

Proposals & Business development activities

Hardware : Cisco 3645 Router, Cisco 2900 switch, Sun Ultra10S Server

Software : Cisco IOS, BGP 4, Microsoft VPN configuration.



Contact this candidate