Post Job Free

Resume

Sign in

Engineer Power Plant

Location:
Westerville, OH
Posted:
March 25, 2014

Contact this candidate

Resume:

Aiman Khaleq (IEEE)

**** ******** ** (***) ***- *179

Dublin, OH. 43017 acda4d@r.postjobfree.com (614) 376 - 4696

Objective:

To obtain a challenging engineering position that will be able to utilize my technical talent and strong work

ethics.

EDUCATION

Bachelor of Science Degree in Electrical Electronic Engineering Technology Feb /95 - Feb / 98

DeVry University of Technology, Columbus, OH

Certification of Completion in Advanced Hands-On Computer Monitor Troubleshooting Course

Sencore Tech. School TC100T, Columbus, OH Feb / 99 - May /99

Certification of Completion in QOS Implementation & Improvement

OMC, LLC in Cooperation with Ford Motor Company Columbus, OH Feb /99 -Oct /00

Kaizen Workshops–Several Journeys working all elements to conduct overall, process improvements.

Certification - Root Cause Analysis and Corrective Action Training

Certification of Completion in Safeguarding of Machinery (OSHA) July / 28 /04

Certification of Completion in General Electric Power Generation

GE Energy Learning Center - Schenectady Duration 10 weeks

GE Ex2000, Ex2000BR, Ex 2100 Excitation, LCI, LS 2100 Static Starter & GP 2100 Generator Protection

Commissioning and Maintenance Direct hire Training programmer

Power Generation 1.5MW Wind Turbine Generator Technical Training course.

Power Generation 1.5MW Wind Turbine Tractel Training course.

Work Experience: Work with Electrical systems setup and troubleshoot EX2100, LCI, PLC System and

configuration Protection panel relays, working on testing walkie-talkie panels, work on automotive

electronic modules and Microprocessors and standard electronic components. Experience related to electronic

modules, junction boxes and switches (controls).Troubleshoot, repair and maintenance testing equipments (electronic

circuitry, pneumatic and mechanical system. Working with monitors, flat panels and all in one repair and quality control

procedure and documentation.

WORK History

Client: GE Energy

Position: Field Engineer:

Power Plant – USA and Middle East Oct.7./2007 – Dec./2013

Personally handled and tracked all phases of setup, launch and wrap up for All units 7FE, 7EA

Commissioning of GE EX2100e,LCI and PLC system, Protection Relays. Commissioning of the Electrical

Installations including Motor Control Center (MCC) of 7FE Gas Turbine.

Client: GE Energy / Granite Jan.5 / 07 – Oct. /07

Team Leader - Field Engineer:

Position: PPM Big Horn Project, Bickleton, WA

Train, task, and monitor three teams of Engineers and Technicians while insuring quality installation of retrofit and

upgrades to 1.5 MW Wind Turbine Generators. Evaluate each Engineer to ensure proper knowledge base and

safety training is in place prior to performing tower climbing, and repair / retrofit work efforts. Check outcome and

quality levels of work, before during and after each project. Generate status reports to superiors for timely flow of

information.

Client: Motorola / contractor K2 Partnering Plantation, Florida, March. /06 – Dec /06.

Position: New product introduction Test System Engineer.

Modify an existing test stations to support new products.

Integrate new test station in the production.

Compile a list of the product issues found during the test system development as well as a list of

enhancements required for testing and provide feed-back to the product-development team.

Assist in piloting and testing new products.

Get feed back from technicians and operators and implement the required enhancements.

Train technicians in production process and procedures.

Client: Solectron Invotronics Scarborough, Toronto, Ontario Feb. /04 – Feb. /06.

Position: Test Engineer Support

Responsibility:

Provide hands-on leadership in the quality management of high-volume consumer product testing for automotive

electronic modules, junction boxes (passive and smart) and electro-mechanical switches released to the

manufacturing facility.

Evaluate supplier-requested deviations to current product components. Write engineering changes, as needed, to

improve or maintain products.

Investigate customer related engineering issues. Interface with customer on all engineering related issues.

Experience with IC’s. Microprocessors and standard electronic components. Experience related to electronic

modules, junction boxes and switches (controls).Troubleshoot, repair and maintenance testing equipments

(electronic circuitry, pneumatic and mechanical system).

Work with the engineering dept. to provide new solutions to upgrade automated equipments, selecting ordering and

implementing appropriate parts, reprogramming PLC, providing new documentation, finally maintain and repair

Universal VCD/RA insertion machinery.

Client: Decision One Inc. Grove City, Ohio Mar. /98 – Dec. /03

Position: Test Engineer Technologist for Dell CRT, Flat panels and Gateway Plasma TV’s.

Responsibility:

Provide hands-on leadership in the quality management of high-volume consumer product Testing.

Partner with Engineering Groups during the product Testing phase to ensure quality.

Partner with Manufacturing to ensure on-going process and product quality.

Conducted process audits and operator training to help company achieve ISO 9001-2000 Certification

Collaborate with customers and suppliers.

Key Achievements:

Analyzed Technical Documentation and implemented new standard processes and procedures that increased

productivity by 15% and decreased downtime by 1/3.

REFERENCES: Available Upon Request



Contact this candidate