Post Job Free

Resume

Sign in

Project Manager Engineer

Location:
Leeds, West York, United Kingdom
Posted:
May 06, 2014

Contact this candidate

Resume:

CURRICULUM VITAE

Russell Etherington.

UK ADDRESS: 2 Wood View Grove, Hove Edge, Brighouse, West Yorkshire. BD6-

2EH

HOME TELE: (UK) + 44(0) 148*-******. DATE OF BIRTH: 17th

April 1960.

E-MAIL: acd0dm@r.postjobfree.com MOBILE UK:

+ 44(0)790*-******.

(Contact Details Mongolia) +

976-********.

MARITAL STATUS: Married.

DRIVING LICENCE: Full clean UK,

QUALIFICATIONS: BSc Civil Engineering (first class) Manchester Polytechnic.

City & Guilds, (Correspondence).. 1982 South London College of Technology,

Marshall Asphalt M.D.C.

Concrete Practise 1983, Concrete Technology 1985, and General

Technology 1985. Formwork

Design 1985. Practical Applications 1985. CSCS - Managerial &

Professional Health & Safety.

MEMBERSHIP OF PROFESSIONAL BODIES: 1 - Membership Institute of

Concrete Technology,

2 - Membership Institute of Asphalt Technology. 3 - Membership Institute of

Quality Assurance. 4 - Chartered Quality Institute (awaiting grade) 5 -

PRINCE2 project management 2014.

Summary: I have a B.Sc. degree in Civil Engineering and 30 years of active

Professional experience generally in Roads/Highways, and Mayor

International (Commercial/Military airport projects in the positions of

Project Manager, Material Engineer,& Laboratory Engineer, in many design

and construction projects. I have acquired a very good team spirit and

working under pressure while working in various countries with

international consulting firms including Strabag International (Libya and

Qatar), Worley Parsons, (Mongolia and China), Tarmac Contracting (UK). and

Mouchel Parkman (UK).

As a Project Manager on a number of road projects, I have worked in the

forming of the design team, scheduling of the design task, monitoring of

progress, checking of geometric and pavement design, preparation of various

reports including Inception Report, Design Standards Report,

Soils/Materials Report, Hydrologic/Structures Report, Engineering Report, a

full set of tender documents as well as the various progress and Interim

Reports

.

My experience as a Materials Engineer and Projects Manager include:

. Investigation and design of cuttings and embankments

. Investigation of problem soils (e.g. expansive clays) and design of

remedial measures

. Subgrade soil survey.

. Field non destructive testing like DCP, In situ CBR, Plate Loading

Testing and Benkelman Beam Deflection Testing

. Traffic volume studies & axle load studies that comprise traffic count, O-

D survey, Axle Load Survey, Socioeconomic survey and analyses of traffic

volume and axle load.

. Landslide investigation (investigation, analysis and design of remedial

measures for slope stability, rock fall, creep, etc)

. Pavement condition survey

. Subsurface exploration on trunk roads, rural roads, bridges, airfields

and buildings

. Identification and investigation of quarries, borrow pits and other

sources of construction materials in many projects.

. Analysis and interpretation of field observations, in-situ test results,

laboratory test results and traffic data in the preparation of Materials,

Geotechnical and Pavement Design reports as well as technical

specifications

. Pile capacity analysis

Among my experience as a Project Manager include:

. Leading and coordination of various teams of design and construction

projects that includes liaising with clients/donors, preparation & follow-

up of invoices, preparation of proposals for outstanding problems, etc

. Preparation of technical and financial proposals for various highway,

airfield, bridge and water works projects. I have sound experience of

preparing highly responsive technical proposals for a number of projects,

including mine projects in the south Gobi where the company is responsible

for supply concrete for surface and below structural/shot Crete concrete.

. Preparation of work plan and staffing schedule (master work schedule,

interim plan and staffing schedule)

. Monitoring of the accomplishments of on-going projects. Specifically, I

have in-depth knowledge of Microsoft-project software in the planning and

tracking of projects

I have extensive exposure to computers and can operate different

application as well as programming software. Also prepared various QA

Manuals and project reports and is well conversant in various reporting

standards and procedures.

EMPLOYMENT HISTORY:

March 2012 - May 2014: Wagner's Global Services

Mongolia. LLC.

Position: Operations

Manager.

My role as Operations Manager is to ensure all projects are started and

executed in a timely manner. To support the Project Managers, both

commercially, and technically throughout the course of the works.

Also provide leadership, motivation and strategic direction to a

multifaceted team of both local and international staff, through our

Mongolian JV partner (Monroad Civil Engineering).

This extends to operational supplies from the aggregate quarries, asphalt,

concrete plants, and its required transportation. Projects are

predominately roads, bridges, airports (both regional and the new Chingis

Khan International airport), infrastructure, and rail projects situated

within the central and southern regions of Mongolian.

. Able to present formally to senior clients

. First class communication, analytical, problem solving and team

management abilities.

. Have a clear understanding of the dynamics and requirements of a fast

moving engineering design team within a EPCm environment.

(engineering, procurement, and construction management)

. Responsible for proposal preparation and QC, estimating project costs,

contract negotiation, project quality, and project profitability.

. Responsible for project schedules and timely completion of projects.

. Evaluated and executed the supply of Concrete, Asphalt and Dry

Aggregates for the Samsung Railway project in the South Western Region

of Mongolia. The proposed rail is planned to be 225.0km long from

Ukhaa Khudag Mine site towards to border of Gashuun Sukhait.

. Implementing the construction design for rainwater runoff from

highways and roads, controlling irrigation and flooding on national

park areas, together with diverting sewage and pollution away from

water sources. Execution of NEC,ECI, together with FIDIC contracts

March 2011 - March 2012: Worley Parsons. Mongolia. LLC.

Position: Resident

Engineer.

The works comprising this contract were situated in the Umnugovi aimag,

Khanbodg Soum. The road alignment was from the Oyu Tolgoi mining site

south towards the Mongolia/China boarder. The project comprises the

construction of 30-km of roads; Staff consisted of Foreign Engineers as

Resident Project Manager, 2-Resident Engineer, 2-Highway/Bridge Engineers,

1-Senior Quality Assurance Engineer and 1-Contracts Engineer supported by

local staff as 2-Structures Inspectors, 4-Road Inspectors, 2-Quality

Control Engineers, 1-Quantity Surveyor, and 1-Surveyor. Regular meetings

were held with the Contractor, the Designer, the Employer's local

representatives and the Employer; reporting at Ministerial level when

required.

Jan 2010 - Feb 2011: Strabag International GmbH.

Position: Project Manager/Senior Materials

Engineer.

(Coastal Road: Ajdabia to Al Marj. & Tripoli

International Airport)

Engaged on the Coastal Road Ajdabia toAl Marj in Libya. The project

consisted of full reconstruction and overlay maintenance. This phase

covered the border of Egypt to Tunisia which is around 960 km.

Responsible for the central laboratory situated in Tripoli, and associated

satellite facilities along the main coastal highway.

Duties consisted in brief of the following,

?Sourcing of all construction materials, to be incorporated within the

project.Both within Libya and overseas.

?Compile all QA documentation, Quality Plan, and Inspection Test Plans

?Analyzes product failure data and laboratory test results to determine

causes of problems and develop solutions.

?Monitor material performance and evaluate material deterioration.

? Supervise the work of technologists, technicians, and other engineers.

? Design and direct the testing or control of processing procedures namely

Asphalt and Concrete production.

? Evaluate technical specifications and economic factors relating to

process or product design objectives.

? Conduct or supervise tests on raw materials or finished products to

ensure their quality.

?Perform managerial functions, such as preparing proposals and budgets,

analyzing labor costs, and writing reports.

?Plan and evaluate new phases of the project, consulting with project team

within Libya and support staff in Germany.

April 2006 - Dec 2009: Junior Sammy Construction Ltd.

Position: Project Manager. (Trinidad, West

Indies.)

On assignment from Expo-Tec Services Ltd, responsible for all aspects

relating to Earthworks, Drainage, and Surfacing of the new Interchange

project, programmed to be completed in October 2008.

. Review and assess feasibility studies, engineering designs,

construction plans, specifications, unit cost analysis and estimated

construction and maintenance budget; provide recommendations for

improvement;

. Review existing project planning, design, construction management,

quality control (QC) and quality assurance (QA)(ITP) plans and

procedures of the ongoing road and bridge project; provide

recommendations for improvement;

. Submit detailed reports on the status of road construction program

implementation to ministry of works and transportation; where

deficiencies are noted, recommend corrective action;

. Review the performance indicators in the Performance Management Plan

and recommend any other suitable custom indicators necessary to

monitor progress made and impact of the project.

. Monitor performance of, and provide technical advice as needed, for

the implementation of two additional task orders related to capacity

building for rural electrification and water and sanitation

infrastructure surrounding the works.

June 1997 - April 2006: Expo-Tec Services Ltd.

Position: Surfacing Manager / Freelance Materials

Engineer.

Operating as a Limited Company, within the UK and Overseas. QA/Materials

Engineer for the following projects,

( National Grid Telecomms build within the UK. ( Lucent Telecommunications

project in Riyadh, Saudi Arabia.

( Atkins. Ras-Shukier. Oil terminal project, Egypt. ( Cambells Int,

Tunnelling/Carriageway project, Perth, Western Australia.

Surfacing Contracts Manager for the following Major projects, (Tarmac (NW)

Runway 2 Manchester Airport. ( Hanson A487 North Wales. ( Tarmac - Motorway

Term Maintenance. (Manchester) ( Tarmac - (Southern) A303 Mere.( Tarmac

(Midlands) Northern Relief Road, Birmingham. ( Interchange Project & Piarco

International Airport in Trinidad & Tobago.

July 1994 - June 1997: Al-Hoty Stanger Ltd. (Saudi Arabia)

Position: Quality Assurance/ Materials Engineer.

Responsible for all functions and levels of the business, company

activities included Construction Materials Testing,

Water, Chemical, Soils, Metallurgical Analysis, None destructive testing

and inspection, Paint and coatings examination, geotechnical

investigations, and Oil analysis.

Reporting directly to the board of Directors, with associated

responsibility for the preparation of yearly budgets, for their submission

and implementation.

Turnover in excess of 1.5 million SR per month, with nine departments

(approx. 187 members of staff) covering the above activities within the

central province office situated in Riyadh,

April 1993 - Jan 1994: Morrison A & B (Middle East Ltd)

Position: QA/Materials Engineer.

Engaged within the Middle East region, responsible for management of all

contracts / company quality assurance programmes on projects throughout the

Kingdom of Saudi Arabia, U.A.E. Oman, and the State of Bahrain.

My main duties and responsibilities were as follows,

. Negotiate and propose material supplies in accordance with British /

American standards, and in line with the contract specification.

. Analyse present operations, formulate and implement effective

organisation strategies to improve productivity.

. Prepare professional reports for the Consulting Engineers in respect of

the source approval for inclusion for all materials.

. Analyse new projects/ ventures and calculate feasibility studies,

including cash flow, and profit/ loss projections.

February 1992- May 1993: Stanger Consulting Engineers.

Position: QC/QA Engineer.

Responsible for the day to day supervision of the NAMAS accredited

laboratory, also acting Project Manager for the bridge investigation

projects, and motorway resurfacing contracts.

March 1990- February 1992: Pioneer Concrete (UK) Ltd.

Position: Plant Manager.

Responsible for sales, overall production, QSRMC, Health and safety,

technical, credit control, and plant maintenance. At this time Pioneer

operated a cell management system where the Plant Manager had overall

responsibility for profit and loss.

Nov 1982- January 1990: Morrison Knudsen. (Saudi Arabia)

Position: Quality Control Engineer.

Responsible for ensuring that construction materials were selected with

regard to quality, cost and that they were processed in accordance with the

contract specification, and/ or good practice.

Engaged on numerous projects throughout Saudi Arabia.

References:

1- Martin Lehmann. Dipl.-Ing. Technical and Design Manager, Construction

Advisor.

acd0dm@r.postjobfree.com or acd0dm@r.postjobfree.com Cell +971

561750393.

2- Mr.Tengis Garamgaibaatar. C.E.0. Monroad (Civil Engineering).

Building, 20th Khoroo, Bayangol District, Ulaanbaatar, Mongolia

acd0dm@r.postjobfree.com Cell +976-********.



Contact this candidate