Ron Herndon **********@*****.***
***** **** ***** ****** **** ph. 248-***-****
Novi, MI 48374 Cell ph. 248-***-****
Hard working and results driven professional with a diverse background in Supply Chain Management and Sales. Over
twenty years of experience including JIT Logistics, Production Control, Supplier Development, Scheduling, Option
Forecasting and Systems Support. A hands-on professional with proven assets in improving business processes.
Currently seeking a position in Home Improvement Sales.
PROFESSIONAL EXPERIENCE
Real Estate Sales 01 / 2011 – Present
Keller Williams Realty, Northville, MI
• Prospecting for clients on a daily basis by calling expired listings, For Sale by Owner (FSBO’s),
800 Sign Calls, and Zillow leads.
• Advise potential clients as to the current market conditions and the unique buying opportunity this
market presents.
• Practice scripts and dialogs to handle clients objections in a professional manner.
• Write contracts and negotiate contracts on behalf of clients.
• Attend weekly Mike Ferry Organization Real Estate Sales Training.
Business Systems Support Manager 8 / 2005 – 12 / 2007
Chrysler Corporation Auburn Hills, MI
• Developed the functional business requirements and project management activities for the
implementation of the Common Constraint Database (CCDB). Received (Directors Award) for the
development and implementation of this system.
• Provided expert analysis and consultation to CCDB users to ensure material constraints, restrictions,
and plant parameters were entered correctly.
• Developed systems enhancements for the Common Constraint Database (CCDB).
• Provided expertise analysis and troubleshooting support of the production scheduling and material
forecasting systems used by Chrysler.
• Developed business requirements for the new vehicle scheduling system (ASF).
Platform Manager, Scheduling and Forecasting 10 / 1994 – 7 / 2005
Chrysler Corporation Auburn Hills, MI
• Managed the daily activities of the Jeep and Large Car Platform and directed the work efforts of
four UAW represented scheduling analysts and two supervisors.
• Key participant in the weekly Order Status Meeting designed to quickly resolve dealer order
problems, material constraints, scheduling and plant build issues.
• Key participant in the development and implementation of a new model launch and early buildout
plan. The agreed upon plan would then be communicated to all stakeholders to ensure the successful
launch/buildout for each vehicle.
• Developed the functional business requirements and project management activities for the launch of
the I2 Gateline Optimization Project (GOP) Scheduling System.
• 2004 – Received (Vice-President Award) for quickly analyzing and determining if late production
increases could be incorporated into the program. This action generated over ten million dollars of
additional profit for Chrysler.
• 2005 – Received (Director Award) for developing a plan to ensure that the International Program
vehicles could be built before the vehicle was phased out of production at one facility and
moved to another facility.
Supplier Delivery Specialist 9 / 1991 – 9 / 1994
Chrysler Corporation Highland Park, MI
• Conducted Tier 1 supplier delivery performance review meetings and follow-up meetings with poor
performing suppliers to improve overall supplier performance.
• Trained suppliers relative to Chrysler requirements and monitored overall supplier delivery
performance with an emphasis of assisting suppliers with the lowest scores.
• Developed and implemented a new supplier grading system (Director’s Award).
Supervisor, Production Control 1/1988 – 8/1991
Chrysler Corporation Highland Park, MI.
• Supervised and directed the work efforts of six UAW represented PC analysts to ensure an adequate
supply of quality material was delivered to assembly plants.
• Determined the most cost effective means of transportation available so as to ensure that material
was delivered on time.
• Developed an Engineering Change Chargeback Procedure (Directors Award) which resulted in a
projected cost savings of $100,000 annually.
• Developed a supplier chargeback procedure for recouping the transportation costs when a supplier
made shipments in excess of the normal agreed upon ship pattern (Vice-President Award). Initiative
resulted in cost savings of $500,000 annually.
JIT Logistics Coordinator 4/1984 – 12/1987
Chrysler Corporation Highland Park, MI.
• Responsible for the route design and maintenance of the Chrysler Just-in-time (JIT) program for
various assembly plants.
• Analyzed the material truck load capacity requirements for each route and designed the routes to
ensure the most cost effective means of transportation.
• Conducted JIT implementation and maintenance meetings to establish the most cost effective means
of transporting material from suppliers to Chrysler assembly plants.
New Car Salesman 7/1982 – 3/1984
Town & Country Dodge Farmington, MI.
• Sold new cars and trucks and advised customers relative to their needs.
• Studied vehicle features to assist potential customers with their buying decision.
• Wrote orders and completed paperwork for vehicle purchases.
Operations Manager 9/1980 – 6/1982
Greyhound Bus Company Detroit, MI.
• Dispatched buses and supervised drivers.
• Scheduled routes and assigned drivers for each passenger run.
• Determined passenger transportation requirements and advised other Greyhound Bus locations of
any potential passenger capacity issues affecting the next Greyhound Station.
EDUCATION
Master of Science in Administration (6/1992) (3.6 GPA)
Central Michigan University Mt. Pleasant, MI
Bachelor of Science in Business Administration (6/1981) (3.5 GPA)
Davenport University Dearborn, MI