Jeff Rogers
Regional Manager
Newport Beach, CA 92660
949-***-****; *************@*****.***
EDUCATION
B.S., Electrical Engineering, 1994
AREAS OF EXPERTISE
• 20 years working in Rail Systems & Electrical, Heavy Civil, Commercial & Industrial Construction
• Design/Build experience with all disciplines
• Extensive Light Rail construction experience
• Successful project manager on numerous contracts
• Considerable experience interacting with municipalities
• Electrical Design
• Traction & Substation Power
• OCS
• Communications
• Trackwork
• Train Signaling
• Systems Start-up
AWARDS
• GLAAACC Purchasing Executive Award, 2007
• 50,000 Man-hours Safety Award-2004, 2005
YEARS OF EXPERIENCE
20
1
Jeff Rogers
Regional Manager
1958 Vista Caudal
Newport Beach, CA 92660
949-***-****; *************@*****.***
REGISTRATIONS / LICENSES
• California A License (Effective 05/04/2007)
• Journeyman Licensed 1997
• OSHA 40-Hour
• FMI Project Mgmt Academy
• Kaunas Negotiating Seminar
(1997)
In my past role as Regional Manager of Balfour Beatty’s Rail/Trans Group, I was instrumental and key
contributor in the growth from a small organization of 6 to more than 50 salaried employees. The estimating
department was also expanded during this time from a staff of 2 and the capabilities to estimate single
projects up to $100 million to now a staff of 8 estimators which includes single estimates of over $1 billion.
During this time Balfour Beatty, my team has expanded our target markets from primarily Southern California
to Northern California, Denver, Portland and Seattle. My responsibilities included Profit and Loss reporting,
annual budget projections, business development, estimating and proposal development, and all office and
field operations including job tours and reviews of schedule, budget, safety, quality and related issues with the
Project Construction Teams. Over the past eight years, annual revenues have been increased from
approximately $20 million per year to over $160 million per year along with increasing the overall margins.
During my 20 years of construction/engineering related project management, I have accumulated a vast
knowledge of design-build related work in construction and management of rail transit systems, heavy civil
work, C&I electrical work and the successful installation and start-up of all such work.
EXPERIENCE WITH BALFOUR BEATTY
Charlotte Streetcar, Charlotte, North Carolina
Advised and implemented a project recovery schedule that included the status
of project related deliverables, procurement activities, equipment and overall
construction sequencing. During this time also made changes by increasing
the staff needed to implement the needs of the Project along with hiring the
construction employees needed to complete the construction activities.
Provided them with training on an execution plan and the processes needed to
track the production and budget related items.
North Metro Transit Corridor, Denver, Colorado
Assisted in the successful pursuit, as the lead prime contractor, of the $377
million design-build project for RTD. Primary role was in the development of
the PE drawings with the design firm needed for the estimators to complete
2
Jeff Rogers
Regional Manager
1958 Vista Caudal
Newport Beach, CA 92660
949-***-****; *************@*****.***
the estimate (i.e.: utilities, retaining walls, bridges, civil alignment, electrical
and systems). Developed the Project Schedule for the proposal submission
that included more than 40 access dates and multiple schedules for various
options. Completed the bid review that included quantities, production,
subcontractor reviews, risk analysis, and overall margin and contingency.
Exposition Line LRT Phase 1 C-5 Light Rail Transit Project, Culver City,
California, Exposition Metro Line Construction Authority – The $23
million(sole source negotiated contract) Expo Phase 1 project included the
construction of an aerial station and bridge structure a new 1,711 foot cast-
in-place prestressed box girder bridge. It features a station platform,
construction of 3,400 feet of overhang cast-in-place walkways. The project
included all of the station elements including steel canopies, rain shields, steel
stairway structures, elevator enclosures and cast-in-place concrete buildings
that house electrical and communications/signal rooms for train systems and
elevated station finishes. Additional work included track, traction power
electrical and communication systems, parking lots, traffic signals, bike path
and landscaping.
Exposition Line LRT Phase 1 Track Work Project for FFP, Los Angeles,
California, Exposition Metro Line Construction Authority – I was responsible for
project oversight of track work for EXPO Phase 1 ($45 million) including the
furnish and installation of embedded, and ballasted track for the 8.6 mile
alignment. With my guidance, the subcontract exceeded the project
requirement of 30 % Local Hire and established a mentoring program for the
first 90 days of employment to ensure a safe work environment for an
inexperienced workforce. Our Team worked with the Prime contractor to
maintain aggressive production to meet construction schedule with significant
inherited delays.
MTA Goldline Eastside Extension, Los Angeles, CA
Senior Project Manager. Project Value $122 million
Responsible for all aspects of the design, furnish, installation and
commissioning for the Traction Power, OCS, Train Control and Communications
systems. Project highlights include: substations, transfer trip scheme, load
break switches for sectionalization. OCS, utilizing a low-profile design tie-in to
the existing Pasadena Goldline at Union Station. I had to coordinate with local
government entities, local municipalities, utility companies and California DOT.
The project required frequent interaction with the owner/agency and other
contractors.
3
Jeff Rogers
Regional Manager
1958 Vista Caudal
Newport Beach, CA 92660
949-***-****; *************@*****.***
EXPERIENCE WITH MASS ELECTRIC CONSTRUCTION COMPANY
Valley Metro Rail Traction Power/OCS, Signals, and Communications,
Phoenix, AZ
Project Director - Project Value $95 million
Responsible for two independent contracts, TES/OCS and Signal/Comm. Project
Team included staff consisting of two Project Managers, support staff of 20
individuals, and 5 design engineers. This project was a new system start-up
construction of 20 miles of embedded double rail track, constructed by 6 prime
contractors, running thru 3 local municipalities and coordinating with many
local government and utility organizations. The scope of work included:
design, construction and testing of 15 traction power buildings, construction of
the OCS, the design, furnish, installation, and testing of the railroad signal and
communications system.
Sunrise to Folsom Extension, Sacramento, CA
Project Manager – Project value $22 million
Responsible for the expansion of the 7.5 mile extension from Sunrise to
downtown Folsom. This project included tie-in to the existing operational line
at Sunrise Rise Station, 8 Traction Power Substations, a 100HZ Substation,
60,000 feet of DC cabling, all railroad signaling and associated wayside
equipment, including 14 highway grade crossings, and 2 interlockings.
Pasadena METRO Goldline, Pasadena, CA
Project Manager - Project Value $68 million
Responsible for the design, procurement and installation of 10 Traction Power
Substations (including AC Metering Compartments ranging from 13.5 KV to
35KV, auxiliary transformers for general power, and approximately 100,000
feet of 750MCM, 750 volt, DC cabling) and all communications systems (fire,
life and safety issues, emergency telephone, CCTV, radio, blue light trip
stations, SCADA system, and an operations control facility).
Whittier Access Project (Tunnel Segment), Whittier, AK
Electrical Design Coordinator and MEC Project Manager - Project
Value $57 million
Design/build/operate contract to convert existing 2.5 mile railroad tunnel to
automobile/railway use, including an extensive lighting and ventilation system
and buildings to house fans, control facilities, toll booths, and safe houses.
Responsible for designing and coordinating all aspects of the electrical system:
including emergency systems, life safety requirements, power distribution (35
KV), and traffic control systems.
Rock N Roller Coaster Design-Build Project, Orlando, FL
Project Manager - Electrical Value $7 million
4
Jeff Rogers
Regional Manager
1958 Vista Caudal
Newport Beach, CA 92660
949-***-****; *************@*****.***
Other Disney World Projects at the same time ranging from $500K -
$4 million
Lucent Technologies 8” Wafer Plant, Orlando, FL
Project Manager – Electrical Value $8.5 million
Ted Williams Tunnel Vent 6 & 7 Fan Project, Boston, MA
Prime Contractor with Electrical/Mechanical
Project Engineer - Project Value $20 million
REFERENCES
Upon request
WORK HISTORY
Balfour Beatty Rail, Inc., Los Angeles, California, Regional Manager, April 2006 January 2014
Mass Electric Construction Company, Various Locations, Project Manager, August 1994 March 2006
5