Over 25 years of extensive experience in the building trades to oversee multiple project construction teams
on
Design-builds, T& I Mall build outs Water, Chemical, Coal Fire Energy, and Nuclear Power Energy. Verifiable
track record for the successful completion of various projects by supervising every stage of a
project, from cost estimation and design through the final finishes. Proficient in estimating and
bidding, hiring successful subcontractors, maintaining budget and schedule, and resolving concerns
that may arise during any given project. Successful at coordinating trades, developing partnerships,
and building positive rapport with architects, engineers, local officials, vendors, and clients.
Successful in contract negotiations, project estimating, impending design problems, document
preparation, building code and regulations, material purchasing, site management through
certification of occupancy. Successful in maintaining budget and finishing projects on schedule.
Able to analyze problems and make sound decisions in a timely manner based on objectives, risks,
implications and costs. . Self-starting highly motivated and goal oriented. Professionally and
technically competent, assertive, confidant, ethical and ambitious.
Experience
PACE Pacific Corporation, 3731 East University Dr., Ste. A, Phoenix, AZ 85034- 01/2012 to 11/2013
General Contractor Superintendent –
Project: Educational Facility; Owner - Pascua Yaqui Native American Tribe; Cost: $12 million. The Education
Center includes an extensive library/resource center, a high-tech classroom based facility, a cultural
preservation center, an outdoor Amphitheater. Funded through Federal grants and tribal funds.
● Responsible for the comprehensive execution of construction at site for the entire project from mobilization
through completing the punch list
● Planned, coordinated, scheduled, budgeted, and supervised the construction project from early development
to completion
● Interpreted specs and plans and conveyed to all subcontractors of all trades on the project
● Developed, updated, and maintained project schedules
● Coordinated all tasks with the field operations, workers, subcontractors, architects, engineers and owners
● Ensured the construction activities moved according to predetermined schedule by communicating
effectively and coordinating the efforts of all parties involved in the project
● Assessed subcontractor’s work for using proper construction techniques and worked with them to meet the
detailed schedules and overall project plan
● Conducted weekly meetings with subcontractors to assess the arrival and utilization of materials, supplies,
tools, machinery, equipment, and manpower allocations as compared to monthly plans
● Monitored and controlled subcontractor’s activities with the aim to meet the committed construction
schedules and budget
● Maintained daily paperwork, including, daily job reports, RFI’s, PO’s, T&M work orders, as-built drawings,
change orders, and safety documentation
● Resolved on-site technical problems and represented PACE in meeting with owners and project sponsors
Roger Pettit
2282 Briarwood Circle
Eureka CA 95503
accuwd@r.postjobfree.com
B&M Cillessen, 2050 Afton Place, Farmington, New Mexico, 10/2005 to 01/2011
Construction Superintendent on Various Commercial Building Projects
● Coordinated, planned and managed diverse field staff and subcontractors
● Ensured that subcontractor fully executed and complied with the contractual scope of work
● Prepared and reviewed plans, specifications, drawings and schedules
● Insured work and performance was compliant with drawings, specs, schedules, building codes and regulations, and
enforcement of same
● Facilitated efficient use of manpower and equipment
● Established strong safety practices and maintained job labor relations and EEO compliances
● Scheduled equipment and material delivery coinciding with contractor schedules, to meet project requirement
● Inspected field work to evaluate construction quality and progress, efficiency of operations and proper installation in
accordance with design
● Performed quality control duties and responsibilities regarding the work being performed
● Assured safety management program was implemented and complied with throughout project. Prepared weekly
construction progress reports
● Held weekly coordination meetings with owner and architect to review progress and establish continuing milestones
● Reviewed contractor and subcontractor payment applications, change orders, equipment vendor payment requests
● Coordinated required inspections with local jurisdictions
● Identified conflicts in construction progress and provided solution
● Maintained daily log of work activities on the jobsite
● Performed Superintendent duties at multiple jobsites simultaneously
● Walk down projects daily to monitor activities
● Presided over weekly subcontractor meetings designed to coordinate work
● Issued notice of non-compliance to subcontractors in regards to work quality/scheduling
● Ensured jobsites were always safe, clean and organized
● Performed job progression and completion punch list
Projects completed (B&M Cillessen):
Family Crisis Center, Farmington, NM - Remodel of an existing 12,000 sq ft bldg
Kirtland Youth Facility, Kirtland, NM - New Construction –Youth facility with a gymnasium and offices
GeoMat, Farmington, NM - New construction, offices and laboratory 12,000 sq ft
Sun Ray Casino – Farmington NM - Addition to existing Dining room
Riggs Oil Company – Farmington, NM - Warehouse addition - 8,000 sq ft
Exterran Oil – Farmington, NM - New construction 25,000 sq ft office facility
Vinson Supply, Farmington, NM - New Construction, 12,000 sq foot, office and warehouse
SMS Supply Farmington, NM - Warehouse addition; 5,000 sq ft
Ashley Plaza, Farmington, NM - New Plaza Construction – 25,000 sq ft
Ashley Furniture, Farmington, NM - New construction 40,000 sq ft – Ashley Furniture Retail Store
Sun Ray Casino, Farmington, NM - Added 35,000 sq ft to the casino. New casino, restaurant, lounge
Indian Health Services, Gallop, NM - Removed old generators, installed new generators, installed new controls
Chinle Hospital Renovation, Chinle, AZ- Hospital addition 25,000 sq ft
Roger Pettit
2282 Briarwood Circle
Eureka CA 95503
accuwd@r.postjobfree.com
Harrison Western Contractors, Construction Corp
Project: Night Horse Dam, Outlet Works Concrete Tunnel Lining and Gate Chamber, Durango, CO :
Subcontractor for the concrete tunnel lining construction and placement of concrete for the tunnel’s invert and arch
sections (1,400-foot long tunnel) Completed placement of the concrete lining and gate chamber and the guard gate
and piping within the downstream tunnel. Fabricated and installed the jet flow, sleeve valve, and associated piping
throughout the project.
Western Industrial Contractors,
Project: Denver International Airport Fabrication, installation, and integration of new bomb detectors
Equipment installation and commissioning of material conveyor handling systems
Performed mechanical fabrication installation, integration, and commissioning of a new bomb detector system and
baggage conveyor handling system
Washington Group International
Project Engineer
New plants design - starting from project scheduling and plant layout to PFD and P&ID development, detailed design
of process components, equipment and vendor selection, technical writing and development of equipment
documentation (equipment data sheets, master specifications, inspection requirements forms, vendor drawings and
data requirements forms), vendor quotes evaluation, procurement, construction and start-up assistance. - Mechanical
design, piping and pressure vessels design, stress analysis, steam and condensate systems, conveyor systems. -
Overall responsibility for technical integrity of entire project work. Coordination of detailed discipline engineering effort,
Coordination of regulatory approvals and permits. Engineering support of existing plants, working with Operations and
Maintenance to improve processes, maintain and upgrade equipment performance.
Raytheon Engineering (formerly Stearns and Rogers) Englewood, CO
Project Engineer
Provided Engineering and technical services of refueling equipment; service/troubleshooting and onsite upgrade
installations during pre and outage deployments. Assisted in the design of upgrades and manufacturing of
mechanical equipment. PWR and BWR fuel handling systems including mechanical, electrical and electronic design
and support and upgrade fuel transfer and manipulator crane systems to ensure total reliability and optimal
performance during all fuel handling operations. Overseen multiple projects from the kick off phase until final delivery.
Provided quick response engineering support to mechanical and electrical. Supported the quality department in all
engineering decisions regarding maintenance and operations of mechanical systems. Participated in Engineering
Investigation Teams to determine design problems and improvements. Tracked the cost and schedule variances
through a project schedule. Identified process problems and implemented plans to prevent future occurrences.
Worked with the procurement department to ensure proper vendor selection, avoiding bad products and overpriced
parts.
Primary responsibilities included:
• Upgraded projects from set-up to the execution phase
• Interfaced with clients and performed troubleshooting equipment activities at nuclear energy power plants
• Supported refueling equipment during pre and outage contracts.
• Support of design, engineering and mechanical manufacturing of refueling equipment upgrades during non-peak
activities.
• Performed instructor activities.
• Conducted routine and non-routine tasks, operated specialized equipment, took measurements, extracted and
compiled data regarding equipment and process performance; collated data on task and outage performance.
• Developed calculations, tables, reports and related data; maintained maintenance logs and certification documents.
Roger Pettit
2282 Briarwood Circle
Eureka CA 95503
accuwd@r.postjobfree.com
• Developed maintenance procedures, problem reports, field schedules and task close out reports.
• Participated in planning and executing projects; assisted in preparation of proposal and procurement documents.
Provided input to training materials and conducted training.
COMPUTER SKILLS
AutoCAD 12 and 14, 3-D CAD, Microsoft Office (Word and Excel), Project, and Scheduler, P-6
Current first aid and CPR and OSHA 30
EDUCATION
BACHELOR OF SCIENCE, Kennedy Western University Mechanical Engineering
CONSTRUCTION MANAGEMENT, Central Oregon Community College
US ARMY, combat medic
PENDLETON HIGH SCHOOL