Post Job Free
Sign in

Engineer Power Plant

Location:
Chennai, TN, India
Posted:
February 26, 2014

Contact this candidate

Resume:

VEERANJANEYULU GADHAM

Mobile: 073******** E-Mail: accu9s@r.postjobfree.com

In a quest of career growth opportunities in the areas of Production

planning & Fabrication with an organization of repute.

PROFESSIONAL SYNOPSIS

< A dynamic professional over 3.1 years of experience in the field of SAP

(Production planning) and Fabrication.

< Presently associated with Pennar Industries, Hyderabad as Engineer.

< Proven track record of swiftly ramping up projects with competent cross-

functional skills & ensuring on time deliverables.

< Expertise in planning systems that will enable to meet an organization

consistently and enhance customer satisfaction.

< Adept in planning components to meet specifications and performance

criteria provided by the customer.

< Skilled in conceptualizing and effecting process initiatives to enhance

efficiency and productivity.

< An effective communicator with analytical, problem solving &

organizational abilities.

CAREER RECORD

Since December' 10 with Pennar Industries, Hyderabad

Joined as Engineer

Description : Pennar Industries is one of the largest auto auxiliary

suppliers in the world manufacturing wide rank of products. Company holds,

ISO 9001-2008 certified company. Customers are TATA, Ashok Leyland, IFB,

INEL, TECUMSEH, ECTIL, SOLAR PROJECTS FOR L&T, MOSER BEAR, JOHNSONLIFT,

GREEN SPAN, M&M, ALEX, ENDURANCE etc.,

As a Production End-user:

. Raw Materials Planning.

. Coordination with all Departments related to the Production like

Quality, Tool Room and Maintenance etc.

. Maintaining shift schedule, shift wise and monthly wise.

As SAP-PP Core Team Member:

. MRP Run

. Production Order creation.

. Production Order Confirmation.

. Material Requirement Planning based on Customer requirement

. Materials creation in SAP for new Products.

. Bills of Material (BOM) and Routing creation in SAP.

. Work Centers Creation in SAP.

. Creation of PR's and PO's for Raw Materials, Engineering Materials and

Consumables in SAP.

. Coordinating with End Users in Branches, Located in Hyderabad, Chennai

and Hosur and solving their issues in SAP.

Roles and Responsibilities:

. Presently working as overall shift incharge for CRSS plant.

. Products planning & scheduling in interaction with marketing & sales.

. Individual supervision of all work centers for enhanced productivity.

. Co-ordinate with operators and junior engineers for effective manpower

usage.

. Planning of Pickling line with our affecting the rolling production.

. Work rolls arrangement for different grade material rolling.

. Work with different stages of the production line for smooth and

timely delivery.

. Maximum utilization of resources (manpower and equipment) for meeting

time deadlines.

. Coordination with marketing purchase, shop floor, to ensure smooth

floor to meet the business targets.

. Reduce the online defects of maintenances down time and increase the

productivity.

. Control of consumables at al! a work centers from HRS to PACKING.

Motivate, encourage subordinates and instill a feeling of

satisfaction in them

PREVIOUS EXPERIENCE

Previous with Premier Engineering Industries Hyderabad

Joined

as Engineer

Description : Worked at Premier Engineering Industries, Hyderabad as a

Production & Quality Control Engineer for 2.6 Years (July 2008 to Dec

2010). Which includes contract and company workers and Manufacturing of SS

& MS Lube Oil Tanks, Storage Tanks, and LP Heater Shells Presently.

. BHEL Orders, NTPC Projects (Bowl Mills)

. Mill Side Housing and Base.

. Separator Body.

. Separator Top.

. Planetary gear housing.

. Lube oil tank.

. Fabrication, Machining and With Liner Assembly.

Roles and Responsibilities.

. Detailed Study of the Drawing.

. Preparation of Sub-Contractor items.

. Inspection of the Sub- Contract Items.

. Quality Report

. Dispatching the goods

. Material Management

. Responsible for all production safety environments.

PROJECTS EXECUTED

Project -1 : Bowl Mill

Client : NTPC & BHEL

Description : This project used in power plant for Cole Grinding.

Software's used : Auto CAD.

Machines Used : Lathe

Duration : 1 Month.

Project -2 : LP HP Feed water Heaters In Thermal Power Plants

Client : BHEL.

Description : Feed water heater is a power plant component used to

pre-heat water.

Software's used : Auto CAD.

Machines Used : Lathe

Duration : 35 Days.

Project -3 : LP Inner Casing

Client : NTPC & BHEL

Description : A support arrangement is provided for an inner casing of a

turbine having an inner casing with

Upper and lower sections.

Software's used : Auto CAD.

Machines Used : Lathe

Duration : 60 Days.

Project -4 : Lube Oil Tank.

Client : BHEL.

Description : A Lube oil tank provides a safe and effective method of

bulk storage for motor oils of all

Types

Software's used : Auto CAD.

Machines Used : Lathe

Duration : 20 Days.

Project -5 : Storage Tank.

Client : BHEL.

Description : A Proper tank or vessel is necessary to avoid

contamination and to prolong the life of the

Lubricant in storage.

Software's used : Auto CAD.

Machines Used : Lathe

Duration : 40 Days.

ACHEIVEMENTS & TRAININGS

"CNC (Milling & Lathe Programming)" Completed in

"Integrated ITC" In Khammam.

Participated with ANAAR Team to development activities,

which includes project with

SAFETY CYLINDER Modification done stroke length reduced from 400 mm to 200

mm in all hydraulic presses.

PERSONAL DOSSIER

Date of Birth : 12th MAY 1989

Present Address : C/o Samba Siva Reddy

Plot No. 102,

Sai Colony,

Ammenpur

Hyderabad-500037.

Linguistic Abilities : Telugu, English & Hindi.

I hereby declare that the information given above is true to the best

of my knowledge and conscience.

Yours Sincerely,

Gadham Veeranjaneyulu.

TECHNICAL SKILLS

> SAP Production Planning.

> MS Office.

> Auto CAD 2010.

> Plasma programming with OMNI-Cad.

> CNC Programming.

SCHOLASTICS

> Diploma in Mechanical Engineering from State board of technical education

and training with 56.5% in 2008

> SSC From ZP High School with 67% in 2005.



Contact this candidate