Jim Bagemehl
Kiel, WI *****
*********@*******.***
Objective
To obtain a position with a strong, forward thinking, progressive company
where I can fully utilize my knowledge and experience gained in Facilities
Engineering and Construction Management.
Summary of Qualifications
Over 25 years of experience in Cad Design within the Facilities
Engineering/ Construction Management Field
. Cad Design - Mechanical, Structural and Architectural
. Design Manager - Co-ordinate design efforts of all engineering
disciplines
. Machine Design and Repair - Work with area associates from Maintenance
and Central Crafts.
. Work with Design Firms to create Facility Construction drawing package
. Develop standards and procedures within organization
. Work with area associates on Kaizen teams to improve product flow
Major strengths include strong leadership, excellent communication skills,
competent, strong team player, attention to detail, respect for compliance
in all regulated environments, as well as leadership skills including site
supervision, scheduling, training, and other administrative tasks. Thorough
knowledge of current manufacturing and construction practices and a clear
vision to accomplish the company goals. Computer and Internet literate.
Relevant Skills
* AutoCAD
* Microsoft Office
* Excel
* Sketch-up
* Adobe
* Buzzsaw
Employment History
Experis ManpowerGroup
Business Operations Specialist and Sr.CAD Drafter
Contract position at Kohler Co. Communications and Facilities Engineering
2011 - 2013
Professional Accomplishments
. Served as Design Manager, Assistant Project Manager and Facility
Analyst for the design/build of the 79,000 sq. /ft. Global
Communications facility.
. As part of the Kohler Co. design team and working with the
architect, created the coordination sketches for updates and
building modifications during construction.
. Working with the project manager, vendors and manufacturers
coordinated the design, selection and installation of all ancillary
equipment, including but not limited to furniture, audio visual
equipment, reference library solutions, caf ' and kitchen
equipment.
. Coordinated the moving in process of 200 plus associates and
personal equipment into the building.
. Working with the project manager and general contractor, served as
point contact for all warranty issues and new projects, post
construction and occupancy.
. Provided project drafting support for Mechanical and HVAC groups.
Kohler Company, Kohler WI
Operations Support, Facilities Engineering / Construction Management
1979 - 2009
Professional Accomplishments
. Served as Design Manager and Gate Keeper of a multi-discipline
design team for a Greenfield manufacturing facility in India.
. Created drawing package consisting of equipment, piping and
schematic layouts of a Vitreous Slip Production Facility.
. Created multi-discipline design package of a process wastewater
treatment facility for the Vitreous Manufacturing Facility.
. Created bid packages and conducted contractor walk thru for the
demolition of existing and installation of new equipment and
utilities in the Vitreous Manufacturing Facility.
. Created drawing package for the redesign of the Electric Melt
Facility cooling water system consisting of piping layouts,
elevations and process flow diagrams.
. Facilitated the design and installation of an overhead monorail
system, to eliminate the need for double handling of product
throughout the Vitreous Manufacturing Facility.
. Participated on a team to address Associate Engagement (Gallup)
Impact Plans. Group addressed and participated in the tracking of
network downtime and submitted findings to IT.
. Served as Mentor to High School and College Co-ops.
. Participated on numerous Kaizen teams to address the issues of Just
in Time Manufacturing, Continuous Improvement and Quality.
Education and Training
Sheboygan South High School - Diploma
Co-op with Donohue and Associates
Manual/Board Drafting
AutoCad
Time Management Concepts
Improving Personal Productivity
Diversity/Sensitivity Training
Six Sigma / Kaizen Training
Professional references
Mike Andrews
Project Manager
Facilities Engineering/Project Management
Kohler Co.
****.*******@******.***
Tom Casper
Manager Studio Operations
Global Communications
Kohler Co.
******.*******@******.***
Art Stewart
Staff Engineer
Facilities Engineering/Project Management
Kohler Co.
***.*******@******.***