Jack Connolly
accnw5@r.postjobfree.com
RELEVANT WORK EXPERIENCE
Harold Brothers Mechanical Contractors Weymouth, MA
MEP Engineering Coordination; Octoberer 2012 – Present
Managed the installation of mechanical and plumbing systems for buildings being
constructed or renovated.
Created detailed plans showing the sizes, heights and locations of equipment, distances
and sizes of penetrations through floors and walls and the clearances of other equipment
or building structures for engineering installation.
Coordinated with other trades the locations of mechanical, plumbing, electrical and fire
protection systems along with the architectural, structural and civil design of the building
site.
Building Engineering Resources N. Easton, MA
MEP Engineering Design; March 2010 - October 2012
Created Electrical, Plumbing and Mechanical engineering plans as needed for various
phases of construction.
Created existing conditions plans for electrical, plumbing and mechanical design while
working with engineers to design new work.
Conducted punch lists on site to verify correct existing conditions.
Created revisions on plans as requested by architects.
CVS/Caremark Woonsocket, RI
Pharmacy Operations; November 2007 - March 2010
Coordinated A&E services and created plans for the renovation or remodeling needed for
CVS/Caremark Pharmacies.
Updated store plans as needed to match new survey information, show new proposals,
etc.
Created 3D plans to show atypical construction as needed.
Worked directly with engineering staff to create new pharmacy layouts.
Provided up to date spread sheets with store specific information.
SBA Sprint Southborough, MA
Assistant Construction Manager; September 2004 - September 2007
Coordinated A&E services of wireless telecommunication site development and
designing of wireless sites.
Designed, reviewed and approved construction and zoning drawings submitted by
various vendors to maintain consistent quality.
Maintained working relationships with co-workers to insure that the correct information
is available and being utilized.
Coordinated with other project disciplines for the timely and effective design of sites.
Ensured coordination between site construction and the local utility companies.
Managed and coordinated the field activities of the site construction to ensure that site
construction schedules and the client's specifications with quality assurance programs
followed.
Assured design and construction meet local, state, national and clients building codes and
plans.
Ensured that site punch lists are completed and cleared in a timely manner.
Evaluated site-testing documentation (i.e. ground tests, sweep tests, special inspections,
etc) for input into site closeout packages
Provided project status in daily report.
Reviewed quality during construction, punch list walks and sign off on payment requests.
Managed teams/vendors to meet all goals in a timely manner.
Provided recommendations and support to management.
Coordinated site research, survey, and design with direction from wireless service
providers, tower building companies and site acquisition firms.
Performed and organized site visits to record field data for projects.
Russ Electric Hingham, MA
Electrical Designer; January 2002 - September 2004
Designed and produced electrical schematics, cable harness plans, BOM’s and working
drawings for the installation of various generators.
Provided support for junior level CAD operators.
Provided field support services on site surveys.
Unique Woodworking Weymouth, MA
Architectural Designer; February 2000 - January 2002
Designed and produced working drawings for the installation of custom designed closets
and cabinetry.
Provided support for junior level CAD operators.
EDUCATION
ITT Technical Institute Norwood, MA
Associates Degree - Computer Drafting and Design, 2008
SKILLS
AutoCAD 2000-12, Revit, Architectural Desktop, Microstation, Pro E, Revit, Solidworks,
Inventor, Java, MS Office, Adobe, Quickbooks