CHINTAN CHOKSHI
Phone: +91-909*******; Email: accni2@r.postjobfree.com
CONSTRUCTION / PROJECT MANAGEMENT PROFESSIONAL
M. Tech. (Construction and Project Management) / Proven capabilities in managing challenging projects within defined
cost/timelines
PROFILE
Technically competent Project Manager with more than 7 Years of chronicled success in managing Infrastructure
and construction projects in resource assessments, inventory control, and preparation of project control reports.
Gained excellent experience in Project Planning and Monitoring, Project Budgeting, Project coordination and Quality
Management.
Proven expertise in preparation and tabulation of reports, graphical representations, use of latest construction
technologies and industrial tools at site.
Capable of striking perfect coordination with all interest groups – consultants, subcontractors, clients and site
engineers – to catalyze work progress.
Demonstrated ability to manage human resources, financial towards the achievement of stated object ives, to plan
and manage work programmes and to lead, motivate and provide effective guidance to a team of professionals.
Adept at instituting /implementing quality systems and ensuring strict observance thereof.
Acknowledged team leader, trainer and a guide with strong analytical and relations-building skills.
PROFESSIONAL EXPERIENCE & DEVELOPMENT
ARCHEYPE INDIA C PVT. LTD. (May’13 till date)
Planning Manager
Key Project Handled
- Hyatt Regency – Five Star hotel, 210 Keys, Ahmedabad
Organize to and prepare bar charts, construction programs, construction planning, crash programs, cash flow,
identifying items on critical path, suggestive programs for recovery programs an d other planning related issues using
Microsoft project, Primavera or other state-of-the-art softwares.
Establish start and end date, commensurate with contractual clauses and prepare construction programs and cash
flow accordingly.
Identify each component of work and prepare planning schedule commensurate with the quantity, resource
allocation, start and end date for the component.
Coordinate with field engineers to record actual progress of each component of work and submit factual status
reports to the management.
Coordinate with all concerned inter-departments including contracts department, design department, technical
coordination department, purchase department and others for project planning and control operations.
Organize site meetings to record status of progress, delays (if any), suggestions for recovery and resource
mobilization.
Keep abreast with latest rules, regulations, laws, by-laws and/or notifications issued by statutory authorities.
CBRE SOUTHASIA PVT. LTD. (Jan’11 to May’13)
Asst. Project Manager
Key Project Handled
- Interior fit out for American Express India Pvt. Ltd., 150,000 Sft., Gurgaon
- Interior fit out for American Express Banking Corporation, 22000 Sft., Mumbai
- Interior fit out for Ericsson Global India Pvt. Ltd., 185,000 Sft., Gurgaon
Plan, organize, direct, control and evaluate construction projects from pre construction till close out according to
schedule, specifications and budget
Prepare and submit construction project budget estimates and update financial health update
Plan and prepare construction schedules and milestones and monitor progress against established schedules
Creating of the project schedule, Estimating tasks based on the project budget, Analysis of the task estimates given
by the team members before introducing them in the project schedule.
Assessing the impact of change requests on the project schedule, and introducing them to the project schedule once
they're approved.
Prepare contracts and negotiate revisions, changes and additions to contractual agreements with architects,
consultants, clients, suppliers and subcontractors
Procurement assistance of contracting vendors and material suppliers
Hire and supervise the activities of subcontractors and subordinate staff
Check and ensure accurate billing of all sub contractors and vendors
KPMG (Jul’10 to Jan’11)
Senior, Advisory
Key Project Handled
- Project Monitoring, Control & advisory role in preparing Standard Operating Procedure for KMP Express way for
DS Construction India Pvt. Ltd., Gurgaon 135 KM,
Creating of the project schedule, Estimating tasks based on the project budget, Analysis of the task estimates given
by the team members before introducing them in the project schedule.
Advise improvisation in Project monitoring process and formats created explicitly for the project
Create a PMO desk and stream line monitoring of schedule progress and project costs
Conducting Business process analysis by developing and maintaining construction specifications, As-Is Process
Document, To-Be Process Document, Fit & Gap Analysis Document, Customization Requirements Document, Existing
System Study Report & Change Analysis Report
Research to classify and prioritize business process, user and functional requirements
Develop Information connector modules to monitor and d ocument project resource usage and resource costs.
SHAPOORJI PALLONJI & Co. Ltd. (Jul’08 till Jul’10)
Project Coordinator
Key Project Handled
- Interior finishes for Indira Gandhi International Airport, New Delhi, CIP Floor, Hotel Floor, International Pier,
Domestic Pier, Passenger Terminal, Toilet Finishes
- Interior fit out Hotel Crown Plaza Today, Delhi 150 Rooms
- Construction and interior finishes for factory Building for BOSCH Ltd., Jaipur, 88000 Sft.
- Interior fit out for Airtel, Gurgaon, 76000 Sft
- Interior fit out for SP Real Estate office building, Girgaon, 18000 Sft
Accountable for planning, organizing and coordinating all the running projects under Vice President (Operations –
North Region).
Planning the construction project that will be taking place in conjunction with the results to the analysis done for the
proposed project.
Monitoring project schedule from start to finish and make any necessary changes along the way, ensuring that the
procedure is being followed while checking the safety features of the project during the time it is being completed.
Studying project design and technical specifications, developing the design into activities plan and schedules for day -
to-day work execution.
Monitoring work progress ensuring strict adherence to defined quality parameters.
Resolving ambiguities and technical issues in various departments.
Defining quality systems / procedures and ensured strict adherence thereto. Identified substandard work
performance right in early stages and ensured reworking to quality specifications.
Actively involved in handling and managing following below mentioned accountabilities:
o Design review, technical review and project proposals.
o Estimating and bidding / Project budgeting and analysis.
o Commercial negotiations / material management and vendor selection.
o Construction planning and scheduling / sub contractor management.
o Project risk mitigation.
o Project quality management.
o Coordination with all the stakeholders.
NATIONAL COUNCIL FOR CEMENT AND BUILDING MATERIALS (Jul’05 to Jun’06)
Quality Auditor
Key Project Handled
- Quality Control and Audit for Earthquake resistant houses funded by World Bank & Asian Development Bank
through Gujarat State Disaster Management Authority, Kutch, Gujarat
Review construction quality issues, construction procedures confirm compliance to Standards & Procedures. Identify
quality improvement opportunities
Produce formal written reports, construction quality related standards, procedures, work instructions. Create
checklists as applicable
Prepare and perform audits / review findings and follow up on any clarifications / queries with the stakeholders
CEPT RESEARCH AND DEVELOPMENT UNIT (Jul’07 to Jan’08)
Research Assistant
Successfully developed project proposal for feasibility of modular Openings and Fenestration in Ahmedabad, Gujarat
for Sintex India Pvt. Ltd.
Involved in market readiness survey for modular openings, value engineering and research analysis using FAST
technique and Decision matrix.
EDUCATION & PROFESSIONAL CREDENTIALS
Masters in Technology, Construction and Project Management, CEPT University, Ahmedabad
Bachelors in Technology, Civil Engineering – Construction Technology, CEPT University, Ahmedabad
All education credentials evaluated by World Education Services, Canada
Technical Proficiency: Primavera, Microsoft Project, AutoCAD, Auto LISP, MS Office
ACADEMIC TRAININGS ATTENDED
Company Jones Lang LaSalle Meghraj Property Consultant Pvt. Ltd., Bangalore - Management trainee,
Duration May’07 till Jul’07
Company Vijay M Mistry Construction Pvt. Ltd., Jodhpur, Rajasthan, Rail Over Bridge – Trainee Engineer
Duration Jan’03 till Jun’03
Company Ambuja Cements, Mumbai, Maharashtra, Cement Laboratory – Trainee Engineer
Duration May’02
Company Mascot Ceramics, Kalol, Gujarat, Ceramic Tiles Factory – Trainee Engineer
Duration July’01
Company Western Railways., Ahmedabad, Gujarat, DEMU Shade construction – Trainee Engineer
Duration Jan’02 till May’02
Company MS Khurana Construction Pvt. Ltd., Ahmedabad, Gujarat, I-Max Theatre, Science city
Duration Jun’01-Nov’01
Company SN Developers Pvt. Ltd., Ahmedabad, Gujarat
Duration Jan’01-May’01
INDEPENDENT STUDY PROGRAM ATTENDED
Thesis – Real Estate Business, Planning and Forecasting
Thesis – Characterization of fly ash utilization by partial sand replacement in concrete
Seminar – A critical study for risk management for housing sector
Seminar – Alternative funding options for real estate sector with special reference to Real Estate Mu tual Funds.
Independent Study Program – Study of Rehabilitation Work in Kutch after 2001 Earthquake.
Independent Study Program – Study of Wooden structures in Ahmedabad.
OTHER KEY ACADEMIC PROJECTS HANDLED
9 Semester, Project – II, Construction of Terry Towel & Bed Sheet Project at Gandhidham, Anjar, Welspun India Ltd.
th
Study of Pre-Implementation, Implementation, Operational and Clean -up phase. A study of different management
system from Client, Consultant and Contractor’s side.
8 Semester, Concrete Technology, Air Entrained Concrete, A Study on Air Entraining Agents and their behaviour in
th
concrete.
8 Semester, Structures - IV, Complete structural design of G + 3 framed structure.
th
8 Semester, Project - I, Complete feasibility study for an Entertainment complex.
th
7 Semester, System Design, A study of system design for a Multiplex Theatre, Design of individual system and their
th
inter-relation for smooth running of a Multiplex.
5 Semester, Quantity surveying & Specifications, Complete Quantity Survey & Costing for a Residential Project
th
KEY ACADEMIC ACCOLADES
First prize winner in model making competition in a Technical Festival “Inertia 2003”, organized by CEPT University,
Ahmedabad. Working model competition Slip form construction technique.
First prize winner in technical quiz competition in a Technical Festival “Contech 2004”, organized by NIRMA University,
Ahmedabad.
ADDITIONAL INFORMATION
Date of Birth: 7th June’1983; Passport No: Available; References: Available on request