DARREN VENTURA
Broomfield, CO 80023
Home Phone: 303-***-****
PRIOR EXPERIENCE
Amgen, Longmont, Colorado 2005 to
Present
Project Engineering - Senior Engineer
Project/Construction Manager responsible for the implementation of capital and expense projects within a
GMP manufacturing facility.
• Act as an interface and conduit to manufacturing, facilities, engineering, quality assurance,
validation and stakeholders. Responsible for initiating and managing change control records from
inception to close out.
• Involved in developing charters, user requirement specifications, functional requirements
specifications, conceptual schematic, design development, construction document cost estimates,
value engineering practices and risk management contingency plans.
• Conduct design professional and contractor evaluation selection, contractor pre-qualification and
bid invitation.
• Lead and conduct design constructability reviews.
• Participate and lead engineering teams in contract development and negotiations.
• Ensure revision controls are in place on contract documents (drawings, specifications, equipment
data sheets, etc.) and other pertinent documentation.
• Ensure field contractor work packages, contractor pre-work planning forms, safety plans and other
quality construction documentation are in place prior to the execution of construction activities.
• Administer the generation and execution of all construction/commissioning control processes
which include purchase requisitions, submittals, request for information, change orders,
lockout/tagout procedures, confined space programs/permits, hotwork permits and commissioning
plans and protocols.
• Supervise contractors in the field to ensure Amgen Standard Operating Procedures, Amgen
Manufacturing Procedures, OHSA and GMP/FDA guideline measures are met.
• Guide field contractors in scheduling, manpower and material purchases are within specifications,
schedules and budget constraints.
Page 1
Darren Ventura
• Responsible for coordinating all operational aspects of the projects including outages, testing, and
securing Certificate of Occupancy from local building department jurisdictions
• Communicate any manufacturing schedule changes which directly impact project schedules.
• Coordinate the preparation and delivery of GMP turnover packages.
Page 2
Darren Ventura
Capstone Planning and Controls, Inc., Broomfield, Colorado 1999 to
2005
Page 3
Darren Ventura
Project/Construction Manager
Consulted directly with clients, and provided a full spectrum of project/construction management services
from project inception to closeout. Services included:
o Supporting clients in gathering requirements for programming and space planning,
developing schematic, conceptual, design development and construction document cost
estimates, conducting design professional and contractor evaluation selection,
contractor pre-qualification and bid invitation.
o Perform value engineering, change order evaluation and negotiation, risk management,
contingency analysis. In addition coordinates interrelated activities involving owners,
design teams and contractors.
o Supervision of contractors in the field to emphasize the highest quality of workmanship
while adhering to schedule, standard building codes and OSHA requirements. Also
coordinated all operational aspects including, building systems commissioning, IT end
to end testing, outages and securing of certificate of occupancy from local building
officials. Develop and create work break down and organization break down structures
to assist in QA/QC procedures and maintenance of phased project schedules.
MAJOR PROJECTS:
• Amgen – January 7, 2005 – November 18, 2007 - Project
Manager/Owners Representative for Amgen Project Management Office. Served as a project
management team leader for an adjunct Capstone team on site for construction and start-up
projects in manufacturing supporting new product introduction.
• Centura Health – May 5, 2003 – December 20, 2004 - Project
Manager/Owner’s Representative for Littleton Adventist Hospital. The following projects
completed are as follows: Children’s After Hours (Pediatrics), Mammography/Ultrasound
Expansion and Remodel, Surgery Center Remodel, Quest Lab Remodel and Expansion and
Neonatal Intensive Care Unit Remodel and Expansion. These projects had a combined square
footage of 30,000 and had a total value of $4.9M
• GE Access – December 4, 2002 – May 2, 2003 - Project
Manager/Owners Representative for relocating GE Access corporate headquarters from Boulder,
CO. to Broomfield, CO. The scope of the project was an 80,000 square foot tenant finish build out
of an existing core and shell building. The project was valued at $9M.
Page 4
Darren Ventura
• Sutter Health – July 16, 2002 – November 25, 2002 – Project
Manager responsible for developing and implementing an Enterprise Project Management
System. Also responsible for training the client in project management control practices.
• McData Corporation – February 19, 2002 – July 15, 2002 -
Project Manager/Owners Representative for the new corporate campus building. The new
campus building consisted of 169,000 square feet of engineering/office space including a 2500
square foot data center. Responsibilities included over site of the Design Team/General
Contractor to ensure all work was completed to McData Corporation specifications, construction
documents and costing data was recorded and accurate. Directly tasked with managing the
installation of mechanical and electrical building systems, data/voice network infrastructure that
included a new data center, main distribution facilities and eight intermediate distribution
facilities for the information technology department. The total project was valued at $80M
• Construction Office – November 5, 2001 – February 18, 2002 - Supported clients in
developing conceptual, schematic, design and construction drawing cost estimates.
• GE Access – September 09, 1999 – November 2, 2001 - Worked directly with the
client to provide consultation in the evaluation, assessment, design, development,
and implementation of project management and controls practices in Facilities
Management, Network Management, Oracle and Web application related projects.
Assisted in the development and maintenance of program schedules, tracking
progress of work, budgets, resource planning, detailed cutover scheduling/support
including the gathering and compiling of information provided by the client.
Prepared data input/output for the master scheduling network system as well as
status summaries required for reporting. Responsible for estimating high level
projected costs dictated by the project charter, scope statement, historical
information and initial project requirements. In turn, responsible for creating and
tracking detailed cost estimates determined by hardware, software and resource
availability, for executive level reporting on project deliverables.
Storage Technology Corporation, Louisville, Co
1992-1999
Facilities Project Manager
• Responsibilities included oversight of all phases of facilities projects from start up to completion,
which encompassed the criteria development of facility projects, including coordination of internal
resources and contractor work schedules. Lead and participated in cross-functional teams for
problem solving, system development issues, process changes and/or improvements. Analyzed,
organized and managed project workload, assigned and coordinated project responsibilities.
• The scope of the projects consisted of clean room new build and modifications, high-end tenant
finish, laboratory fit-up, mechanical installations (process piping, chillers, cooling towers, boilers
Page 5
Darren Ventura
and HVAC infrastructure, pre-action fire protection/suppression systems, etc.), central utility plant,
waste water treatment plant, low and high voltage electrical installations (UPS/transformer, etc.),
proto-line/production line manufacturing reconfigurations, computer data center upgrades/remodels,
network management infrastructure, communication fiber optic installs, roof installations, road and
parking lot installations, landscaping.
• Established and maintained performance procedures for outside architects, engineers and contractors
employed on StorageTek premises.
• Developed high level conceptual budget estimates, design parameters and specifications for RFP's
going out to external design teams.
• Scheduled and lead design review meetings to provide construction management insight and input
related to construction methods, materials, feasibility, budget and schedules.
• Procured outside vendors through a standardized bidding process.
• Controlled and interpreted transmittals and shop drawings submitted for design approval ensuring
correct documentation of receipt and timelines of review.
• Interfaced with engineering to resolve any design conflicts, errors and omissions, or revisions to the
contract documents. In turn worked closely with departmental management, in-house personnel and
outside contractors to quickly resolve any project related issues.
• Controlled project budgets through financial management, planning, forecasting, and control
procedures. Supervise contractors in the field to emphasize the highest quality workmanship while
adhering to StorageTek contract documents /specifications, standard Building Codes and OSHA
requirements. Ensured labor charges and proper pricing of materials were correct on all payment
requests and that all change orders related to a project are legitimate and adhere to the terms and
conditions of the contract. Verification that all work has been completed to contract documents and
all costing data was recorded and accurate.
• Responsible for coordinating all operational aspects of the project including outages, testing, and
securing Certificate of occupancy from local building officials.
• Involved in inventory tracking of electrical and mechanical components for computer labs and
manufacturing.
COMPUTER SKILLS
Microsoft Project 4.0 for Windows/Theory Excel
Microsoft Project 4.0 or Windows/Hands on AutoCAD 1
Microsoft Project 98, 00, 02, 07 Primavera (P3e)
Microsoft Access Visio
Microsoft Office 07, 10 Power Point
Costworks 2002 (Means Estimating Software) Saylor in Windows (Estimating Software)
SAP
MCACES Gold (Estimating Software)
TrackWise
Time Control
Page 6
Darren Ventura
Maximo
ADDITIONAL TRAINING & SKILLS
HVAC Systems training Stormwater Training
OSHA Training Hazardous Materials training
Planning & Scheduling Fundamentals Critical Path Scheduling
Setpoint Systems Corporation Delta Controls I & II Situational Negotiations Skills
Confined Space Training Diversity at Work
Excellence through Quality Time Control (Administrative Training)
Primavera Project Planning for the Enterprise (P3e)
Carpentry
Extensive Training in Mechanical and Electrical Systems
See Attached Amgen Training List
EDUCATION
Bachelor of Science, Colorado State University,
Major: Industrial Construction Management
MEMBERSHIPS & AFFILIATIONS
Project Management Institute (PMI) – Corporate Member (Currently Studying for PMP Certification)
Page 7
Darren Ventura