Tran Huynh Thanh Tam

Day of birth: ** September *975

Address: A 604, 21floors building, Vung Tau trade center, Ba Ria – Vung Tau

Provine, Vietnam.

Email: accgtz@r.postjobfree.com

Phone: +84-905******

16 years of experience in construction and Commissioning Engineer activities, I have

been operation and maintenance equipments in power plant, Steel Company, refinery

plant, FPSO, Nickel plant. Interested in the functions of operation and construction.

Extensive international experience with multinational country and multifunctional

teams.

Work Experiences

Company: TECHNIP OF SINGAPORE (CONTRUCTION COMPANY)

Working time: September 2012 – Present

Location: KONIAMBO Nickel project in New Caledonia

Position: Mechanical Lead for Steam Turbine 135MW installation

From June 2013 replace for mechanical superintendent

- Work in office:

+ Coordinate between SIEMENS’s vendor, KONIAMBO Project and subcontractor

+ Make planning, schedule and organize all activity at site

+ Coordinate with field engineering for modification at site

+ Complete all ITR, SDM, Punch, and FMR

+ Check and sign all documents for site inspection

+ Check all documents and sign for handover to Pre- Commissioning

- Work at Site:

+ Combine steam trainer with steam valve body, HP, LP

+ Install steam trainers, LP, HP bypass valve for HP, LP steam turbine

+ Install hydro stool for pressure test and steam blowing

+ Install Lube oil system (pump AC, DC, L.O Tank, lube oil cooler, piping…)

+ Install hydraulic system (hydraulic control unit for HP bypass Valve, LP bypass valve,

Hydraulic for HP, LP steam control valves, piping …)

+ Install boiler feed water pump, HP, LP feed water heater, extraction pumps, ball

cleaning system for condenser

+ Install auxiliary sea water cooling system, close cooling system

+ Install, pressure test and air blowing for L.O pipe, Hydraulic pipe, gland steam pipe.

+ Pre- alignment HP, LP Steam turbine generator for turning gear

+ Gear box inspection and blue check

+ Final alignment HP, LP Steam turbine, generator and Gear box get ready for start up

Company: TECHNIP OF SINGAPORE (CONTRUCTION COMPANY)

Working time: September 2011 – 2012

Location: KONIAMBO Nickel project in New Caledonia

Position: Pre-commissioning Leader

Responsibilities: Pre-Commissioning and startup plant

+ Desalination, Demineralization plant

- Running test for seawater pump and Chemical system

- Reverse Osmosis 1st pass kids

- 1st pass RO Booster pump (60 bars)

- Pressure exchanger

- Reverse Osmosis 2nd pass kids

- 2nd pass RO Booster pump (20 bars)

- EDI Units ( Electrodeionization)

+ Air plant

- Compressor, air storage, air blowing for piping….

+ Nitrogen plant

- Expander turbine, cool box, evaporation exchanger…

- Compressor, Nitrogen storage, air blowing for piping…

+ Fuel oil system for Combustion Turbine Generator, combustion of boiler

+ Close cooling water system of metal shooting system

+ Running test Metal shooting system

+ Complete all ITR, SDM. Punch and all documents for handover

Company: EMAS OF SINGAPORE (CONSTRUCTION COMPANY)

Working time: October 2010 – July 2011

Location: Keppel Shipyard port in Singapore

Position: Pre-Commissioning and commissioning Leader of Utilities of FPSO

LEWEK EMAS

Responsibilities: Pre-comm and commissioning boiler and steam turbine of

FPSO LEWEK EMAS

+ Inspection and repair heating coil inside main boiler

+ Inspection bearing and rotor of Steam turbine, Generator and condensate system

+ Preparation chemical cleaning, steam blowing for boiler

+ Running test burner of boiler, atomizing air system, ignition cabinet, steam shooting

blower, oil and gas system, force draft fan, gland steam system, vacuum pump, HP, LP boiler

feed water pump

+ Running test emergency diesel engine, energization, Black start

+ Running test for Air compressor, air blowing pipe

+ Running test Water injection pump with discharge pressure is 300 Bars

+ Running test sea water circulation pump, cooling water pump, flushing pipe network

+ Start up main boiler, steam turbine for over speed testing, Load sharing and load reject

+ Start up auxiliary boiler for heating crude oil

Company: TECHNIP CONSORTIUM (CONSTRUCTION COMPANY)

Working time: January 2008 – October 2010

Location: 1st Refinery in Vietnam

Position: Pre-comm and commissioning Leader

Responsibilities: Pre-comm, commissioning of cold and hot utilities area:

+ Inspection demineralization water tank, supply water tank, active carbon vessel,

Caution, anion vessel, Crude oil tank, Diesel fuel oil tank…

+ Running test demineralization plant, air plant, Nitrogen plant, west water treatment

+ Running test hydraulic control oil system on buoy

+ Repair floating hose connected with the buoy for crude oil unloading

+ Fuel oil flushing and running test with the pig for unloading pipe under sea water

+ Inspection sea water intake, sea water line and running test 05 sea water pumps

+ Function test for stop valve, steam control valve, over speed of Steam turbine,

generator protection

+ Function test for transformer, switch gear and power energize for substation 22KV,

6.6KV.

+ Running test HP, LP boiler feed water pumps, lube oil system, jacking oil system,

condensate system, force draft fans, steam shooting blower…

+ Running test burner of boiler, atomizing air system, ignition cabinet, Steam turbine,

generator…

+ Start up boiler for steam blowing

+ start up power plant and synchronization to power network

Company: TORISHIMA/COLENCO (Electric de France) (CONSTRUCTION

COMPANY)

Working time: January 2007 – January 2008

Location: Camau 1 and 2 X 750MW combined cycle power plant in Vietnam

Position: QA/QC supervisor

Commissioning supervisor

Responsibilities:

- Inspecting:

+ Check welding joint for water tank, fuel oil tank and piping

+ Vacuum test for fuel oil tanks, demineralization water tanks

+ Check dry film thickness for Painting

+ Holiday test for fire water pipe, potable water pipe underground

+ Pressure test and leakage test for fuel oil pipeline, air pipeline, Nitrogen pipeline, fire

water pipeline, potable water and demineralization pipeline...

+ Inspection all equipment before installation on site.

- Pre-commissioning, Commissioning of utility system:

+ Oil flushing for diesel fuel oil system.

+ Air blowing for gas pipeline, nitrogen, instrument air, plant air system.

+ Water flushing for potable water, fresh water, fire fighting system,

+ Running test for Demineralization water plant, sea water intake and pump

+ Check vibration, temperature of motors and pumps for all systems

+Start up gas turbines, boilers, steam turbines, auxiliary hot water boiler, fuel gas station,

Instrument air plant, Nitrogen plant…

Company: BLUESCOPE STEEL Limited

Working time: March 2005 – January 2007

Location: Project in Vietnam and Indonesia

Position: Construction and Commissioning engineer

Responsibilities:

+ Install metal pot, Furnace, air knifes, air dryer, miller, extension leveler, coater, oven

and lopper towers

+ Running test metal pot, furnace, air knife, chemical coater, Pre-primer painting coater,

and lopper towers…..

Company: COFIVA (Electric de France) CONSTRUCTION COMPANY

Working time: November 2003 – July 2004

Location: PhuMy 2.2 combined cycle power plant in Vietnam

Position: Process operation engineer

Responsibilities: Pre-commissioning and commissioning Engineer

- Pre-commissioning and commissioning:

+ Check and energization power for substation 500KV.

+ Air blowing gas pipeline, Nitrogen line, Hydrogen line cooling for generator

+ Flushing and run passivation for sea water pipe

+ Running test lube oil system, jacking oil system of steam turbine, vacuum pump,

boiler feed water pump, air compressor 3 nd stages, nitrogen compressor, water cooling

system, Hydrogen cooling system for generator

+ Check auxiliary hot water boiler and gas station

+ Chemical cleaning, and passivation.

+ Start up gas turbine and synchronization to power network

+ Start up gas turbine and HRSG boiler for steam blowing

+ Start up HRSG boiler, steam turbine and generator

+ Check steam control valve and trip block

+ check speed protection for steam turbine

+ Start up gas turbine, HRSG boiler, steam turbine and synchronizing to network

+ Function test transformer, switch gear and substation 500Kv

+ Running test Gas turbine 2X 235MW and Steam turbine generator 245 MW,

Company: AMATA power plant

Working time: July 2002 – November 2003

Location: Vietnam

Position: Operation and maintenance engineer

Responsibilities:

+ Operate auxiliary steam boiler for HFO heating, fuel oil pumps, fuel oil separators

system, diesel engine and generator, fire engine pump, emergency generator, cooling

tower,

+ Overhauls for diesel engine, generator, fuel oil separator, auxiliary steam boiler….

Company: Baria combined cycle power plant

Working time: July 1998 – July 2002

Location: Vietnam

Position: Operation engineer

Start up gas turbine, HRSG boiler, steam turbine, demineralization water plant,

condensate system, auxiliary steam boiler, UPS (110V, 220V) system. Operate main

substation 110KV, 220Kv connect to EVN network

Languages

English: Fluent

Vietnamese: mother tongue

Diplomas and Certificate

1998: BACHELOR DEGREE major in Electrical from HCM University, Vietnam

1998: Certificate of Ba Ria - 480 MW Combined Cycle Power Plant.

1999: BACHELOR DEGREE major in Mechanical from HCM University, Vietnam

2003: Certificate of Phu My 2.2 (EDF) - 715 MW Combined Cycle Power Plant

2005: Hazardous Material Awareness Course

2006: Fire and Emergency response

2007: Certificate of Ca Mau 1 and 2 (EDF) 1500 MW Combined Cycle Power Plant

2010: Certificate of Technip consortium. Dung Quat refinery project

2011: Certificate of Hamworthy Combustion Company

2012: Certificate of Technip Corporation (Pre-commissioning for Utility area)

2014: Certificate of Technip Corporation (Construction for Steam turbine and generator)

Computer skills

MS Office, MS project, AutoCAD, MS project

Additional skills

- Ability to handle problems under high pressure working environment.

- Organize and plan tasks effectively.

- Coordinate and build collaboration between individuals as well as departments.

- Participate highly efficiency in team



Contact this candidate