Curriculum Vitae Paolo Lussi
Paolo LUSSI
PERSONAL INFORMATION
*, *** ****, ************, *****, Italy
+39-091-****** +39-338-*******
accg67@r.postjobfree.com
Sex Male Date of birth 11/12/1956 Nationality italian
Working experience Working with private building companies, I have now decades of experience in managing also
large public infrastructure construction sites; I had the responsibilities of contractual relationships
with the clients, including any disputes and claims; I managed subcontracts and supplies
contracts, engineering and legals, planning and control costs.
Project manager
From June 2012
to today TECNIMONT CIVIL CONSTRUCTION – Cefalù (Italy)
Doubling of the existing railway line between Fiumetorto and Cefalù (Italy)
Client: RFI Rete Ferroviaria Italiana (Italian Railways Network)
Amount of works: € 300.000.000
Description: Construction of almost 20 km of new railway, with viaducts on r.c. and steel beams,
earthworks and a tunnel 5 km long. Works included the installation of railway equipment and
signaling systems.
Business or sector: civil construction and building - railways
Site manager
From December 2010
to December 2011 IMPRESA CAVALLERI OTTAVIO S.P.A. – Reggio Calabria (Italy)
Expanding and upgrading of the existing highway A3 Salerno – Reggio Calabria.
Client: ANAS;
Amount of works: € 30.000.000
Description: total lenght of Project 3,5 km: 12 new viaducts with foundations on 800 mm poles and
micropoles, reconstruction and upgrading of existing viability.
Business or sector civil construction and building – highways
Site manager
From August 2007
to November 2010 ITALIANA COSTRUZIONI S.P.A. – Varese (Italy)
Construction of a new road interconnection between S.S. n 342 "Briantea" and S.S. 233
"Varesina" and interconnection with S.S. 344 of Porto Ceresio". – 1st and 2nd lot.
Client: Province of Varese;
Amount of works: € 33.000.000
Description: total lenght of Project 5,3 km: viaducts with foundations on 800 mm poles for 2,8 km,
reconstruction and upgrading of existing viability 1,8 km, extensive use of reinforced earth and
berlin supports with micropoles of 300 mm.
© European Union, 2002-2013 http://europass.cedefop.europa.eu Page 1 / 4
Curriculum Vitae Replace with First name(s) Surname(s)
This project is part of the works undertaken for hosting the 2010 World Cycling Championship,
it was subject to a tight completion schedule and received bonuses for quality and early
delivery.
Business or sector civil construction and building – highways
Site manager
From September 2005
to July 2007 TODINI COSTRUZIONI GENERALI s.p.a. – Roma (Italy)
Road Access System from the Roma - Fiumicinino highway to the new Roma exhibition site
Client: ANAS ( Ministry of Infrastructures) ;
Amount of works: € 82.000.000
Description: This is a highway parallel to the Rome to Fiumicino motorway, work also included the
improvement of the interconnection with the Rome Ring Road. Total lenght of project 10 km;
earthworks included lightweight fills with EPS (earth and polystirene mix); 2 viaducts with
continuous steel beams (180 m): deep mixing ground consolidation; special foundations with
Soles poles; highway and motorway boxed overpasses without traffic disruption (P.E.C.B.V
and traditional systems). and various r.c. structures to bypass local roads, canals and and
irrigation systems.
Business or sector civil construction and building – highways
Site manager
From December 2003
to August 2005 GRANDI LAVORI FINCOSIT S.p.A. – Piacenza (Italy)
New High Speed railway line Milan to Bologna, lot 1.2 Piacenza West interconnection
Client: TAV
Amount of works: € 136.000.000
Description: Construction of 3.750 m (286 spans) of railway viaducts on r.c. and steel beams,
earthworks and an artificial tunnel.
Construction of the interconnection with the existing raiway line, 3705 m (5 viaducts, 111
spans) earthworks and 2 artificial tunnels.
Works included the installation of monitoring systems on viaducts and earthworks.
Business or sector civil construction and building – railways
Assistant project manager
From April 1998
to November 2003 GRANDI LAVORI FINCOSIT S.p.A. – Cagliari (Italy)
Sa Stria Dam and ancillary works on the Monti Nieddu and is Canargius rivers
Client: Consorzio di Bonifica della Sardegna Meridonale;
Amount of works: ITL 75 millions (37,5 m €)
Description: - A RCC (rollcrete) 400.000 cu.m main dam, with an hydroelectric and pumping station
within the dam body, inclusive of the relevant equipment, spillway, consolidation and contact
grouting.
Ancillary works included a 20.000 cu.m r.c. barrage on the Rio is Canargius, a 3,5 m diameter
interconnecting tunnel (traditional method) with spritz beton and swellex anchor bolts.
Works interrupted following a request for arbitration by the contractor. Negotiations are now
underway to restart and increase the contract by about 25 m €.
All testing on works executed was positive.
Business or sector civil construction and building – hydraulics and dams
Site manager
From June 1997
© European Union, 2002-2013 http://europass.cedefop.europa.eu Page 2 / 4
Curriculum Vitae Paolo Lussi
to April 1998 TODINI COSTRUZIONI GENERALI s.p.a. – Gioia Tauro (Italy)
Gioia Tauro Port (RC), Containers Transhipment Terminal and infrastructures phase 2.1
Client: Area di Sviluppo Industriale di Reggio Calabria;
Amount of works: ITL 60.000.000.000 (30 m €)
Description: placement of 540.000 sq.m of open air concrete paving slabs on selected foundation
materials and geotextiles, upgrading and reconstruction of 3.800 m of crane support rails on
1000 mm poles interlocked by 50 and 100 tonn. cross members and stiffening steel cor-ten
structures. Construction of all cable ducts and drainage culverts and fire fighting grid, lighting
towers and all ancillary engineering structures
Business or sector civil construction and building – port infrastructure
Various positions
From January 1983
to May 1997 DIPENTA S.P.A DI ROMA and associate (GRUPPO COSIAC S.P.A.)
May 1995 to May 1997: Site Manager
Dredging of Lake Leone and upgrading of the western branch of Montescuro acqueduct 1st
lot West (Agrigento – Italy)
Client: Sicily Regional Council, (Public Works Dept);
Amount of works: ITL 36.200.000.00 (18 m €)
Description: partial dredging and mud clearing of the lake, construction of a barrage to divert the
course of the Tuvoli river and of a lifting and pumping station to a 600 mm 12 km long steel
pipeline leading to the lake.
May 1989 to May 1995: Site Manager
Laura Storage Basin (Campobello di Licata - Italy);
Client: Land reclamation body of Lower Salso, Caltanissetta;
Amount of works: ITL 40.000.000.000 (20 m €)
Description: construction of a 800.000 cu.m earthfill dam to form an 8 m cu.m basin; and of a 6 m
diameter 800 m long tunnel on the right bank, spillway and support works with 5000 sq.m of
deep (40 m) bank shorings and 45 tonn anchors. Works also included the diversion of the
Canale stream by barrage, and a canal partly underground (push pipe system).
Works suspended by the client for Project upgrading.
From March 1987 to May 1989: Site Manager
Leone Hydraulic Tunnel (Castronovo di Sicilia - Italy);
Client: Voltano di Agrigento Consortium;
Amount of works: ITL 20.000.000.000 (10 m €)
Description: A 4.850 m long 4 m circular diameter hydraulic tunnel under the Serra Leone pass
connecting the lakes of Fanaco and of Piano del Leone; works included the intake and outlet
structures and the hydraulic management of the nearby secondary river. Excavation carried
out by shielded tunneling machine (Tmb) with prelining concrete rings fabricated on site.
© European Union, 2002-2013 http://europass.cedefop.europa.eu Page 3 / 4
Curriculum Vitae Replace with First name(s) Surname(s)
From January 1987 to December 1987. Site Manager
Nr 2 Ventilation shafts for the Pasquasia and Realmonte Mines, (Enna - AG);
Client: Italkali S.p.A. Società Italiana Sali Alcalini
Amount of works: ITL 3.000.000.000 (1,5 m €)
Description: Circular shafts depth 250 and 300 m respectively, diameter 6 m, sinking by shielded
vertical axis shaft boring machine, lining of shafts with steel ribs, steel wire mesh bolts and
sprtizbeton.
From January 1983 to December 1986: Site, Technical office and Quality control Engineer
Dam on the Cixerri river (Cagliari);
Client: Ente Autonomo del Flumendosa di Cagliari;
Amount of works: ITL 20.000.000.000 (10 m €)
Description: a 304.000 cu.m, 1295 m long 27m high concrete gravity dam with spillways within the
dam body, (5 arch gates of 135 sq.m each) and 2 auxilliary earthfill dams 100 m and 200 m
long respectively. Lake storage capacity 32 m cu.m.
Business or sector civil construction and building – hydraulics and dams
EDUCATION AND TRAINING
Master’s Degree in Civil Engineering
12.11.1982 Replace with EQF
(or other) level if
Hydraulic Engineering section relevant
University of Palermo (Italy).
Registered Engineer with the Province of Palermo, registration nr. 3767 on 19.10.1984
PERSONAL SKILLS
Mother tongue Italian
Other language(s) UNDERSTANDING SPEAKING WRITING
Listening Reading Spoken interaction Spoken production
English B1 B2 B1 B1 B1
Spanish B1 B2 B1 A2 A1
German A1 A1 A1 A1 A1
Levels: A1/2: Basic user - B1/2: Independent user - C1/2 Proficient user
Common European Framework of Reference for Languages
Signature
© European Union, 2002-2013 http://europass.cedefop.europa.eu Page 4 / 4