Gabriel Adei Email: accay4@r.postjobfree.com Ph: 313-***-****
Address: ***** ******* **, ******* *** MI 48038
SUMMARY
Highly adaptive individual with competence in continuous improvement and
optimization projects in Manufacturing and Production Operations. Expertise
includes simulated modeling and analysis, capacity planning, statistical
analysis of data, process flow design and optimization, problem solving in
complex electro-mechanical manufacturing equipment and assembly
environment. Results oriented team player who meets or exceeds goals with
confidence and integrity.
JOB HISTORY
Senior Manufacturing Engineering General Motors Corporation 2002 -
Current
Project assignments and responsibilities.
. 6T - Six Speed Transmission Warren Michigan
Managed a cross functional team for the acquisition of a new dunnage washer
through the design, run-off at OEM, installation and SOP. Project budget of
$700, 000 and came in on time and under budget.
Transmission assembly engineer responsible for uptime, quality and high
efficiency of the assembly line. Worked on continuous improvement projects
to enhance and refine error detection capabilities of equipment. Employed
PFMEA strategies to reduce risk. Design and re-engineering to improve
uptime and reliability. Participated in team problem solving activities to
continuously improve on OEE (overall equipment efficiency) metrics. Applied
quality principles such BIQ and APQP to improve manufacturing.
. 4T - Four Speed Transmission Warren, Michigan
Responsible for the completion of a new Transmission Case subassembly cell
implemented for the 4T65E assembly line. Complete automation of various
assembly processes on the Case Subassembly. Project completed on time.
Extended role and responsibility as Lead Manufacturing Engineer for the
entire 4T65E assembly line engineers. Attended PET meetings to coordinate
necessary changes as it pertains to the assembly line. Attended CPIT
reviews to work and improve on quality related projects.
. HVV6 Engine New and Major Program in Tonawanda, New York.
Established course of action and accomplished the project timing. Worked
with PDT and PET in various areas to analyze product designs for the most
efficient and robust form of manufacture. Liaised between the Central
Engineering Group and Tonawanda to provide maintain project requirements
and goals. Worked with the OEM to develop systems and equipment that were
robust and in accordance with GM's manufacturing specifications.
Participated in manufacturing equipment runoffs at OEM's facilities to
verify and validate OEM's equipment to meet GM standards. Supervised the
installation of OEM's equipment to conform to layout specifications and
ensured that project timing was met. Runoff equipment in Tonawanda to fine
tune all loose ends and ensure equipment projected uptime matrix and cycle
time was on track and achievable. Participated in the PPAP with all
assembly equipments as well as production ramp up to meet "start of
production" objectives.
Special assignment - Production and maintenance lead. Supervision of the 16
production and maintenance personal on the lower intake and fuel rail
subassembly line for the HVV6 engine. Achieve reduction in one production
head count by streamlining the production process at the end of 6 months.
MTTR of equipment was improved by driving the principles of TPM and quality
PMs.
Staff Engineer IBM Corporation 1999-2002
. Utilized optimization and data analysis techniques in the "Chemical
Mechanical Polish (CMP)" department of the Microelectronics Division to
enhance the efficiency of production and improve productivity of equipment.
. Achieved 3.5% overall productivity improvement in the CMP department
in a year.
. Staffing modeling techniques with the utilization of time studies and
motion economy to optimize and balance operator-staffing levels and
streamline the flow of product through the introduction of "Best Know
Methods (BKM)".
. Identified and eliminated redundant operator methods to reduce
operator work load and hence improved operator efficiency by 3% in a year.
. Developed and provided accurate and timely data of process and
manufacturing performance parameters (Speed measurements, Operator
availability, Equipment availability, Cycle Time, Bottleneck indices,
Optimum equipment utilization) to understand productivity constraints and
drew up action plans to improve them.
. Exposed to the concepts of "Lean Manufacturing" and "Six Sigma".
Team Leader Inlaks Products. 1994-
1998
. Lead and coordinated the activities of a team of 23 engineering staff
members through the installation and running off a new aluminum impact
extrusion line.
. Recruited and trained engineering technicians and machine operators.
EDUCATION
MSE -Industrial Engineering Arizona State University 2000.
Concentration: Operations Research and Production Systems.
BSc - Mechanical Engineering University of Sci & Tech 1994.
Concentration: Thermo fluids
High computer skills and knowledge in many related field.
Others: Simulation Modeling and Analysis, Design and Analysis of
Experiments, Data acquisition and analysis.
MISCELLANEOUS
Acknowledged by Professor Michael Pinedo of NYU in his book "Scheduling:
Theory, Algorithms and Systems (Second Edition)" for my contribution during
graduate school.