RESUME
RAMBISHWAS RAY
Contact Address : Present Employer :
Kohinoor Steel & Power Pvt. Ltd. Kohinoor Steel & Power Pvt. Ltd.
Saraikela, Jamshedpur, Jharkhand. Position – Power Plant Head
India, Pin code - 832404 Designation - DGM Power Plant
Mob. Nos.- 091-775-***-****, Functional Area - Engineering O & M
778-***-****, 941******* Functional Roll – Mechanical Engineer
E – mail : **********@*****.**.** Total Experiences - 14 years & 8 Months
: ***********@*****.*** Notice Period - 01 Month
Personal Details : Present CTC - 14.5 Lacs & Family
Father’s Name – Shri Devlal Ray Accomm.
Date of birth – 25-April-1974 Expected CTC - Negotiable
Marital Status - Married Present Location – Saraikela, Jamshedpur,
Gender - Male Jharkhand, India
Passport - Yes
Qualification - B E in Mech. Engg.
OBJECTIVE
To obtain an engineering management at senior position in O & M, controls, test, continuous
improvement where I can use my strong analytical, detail-oriented and interpersonal skills along
with my exceptional common sense to improve services and products, reduce costs and lead
times, delight customers and help and mentor others. All the while engaging in new challenges
and learning experiences.
VISION & CAREER
Looking for challenging career, I aspire for a professional career in Engineering science, which will
provide me with unlimited growth, opportunities, suitably reward my skills and give a chance to
constantly add value to company and society at large by working, currency are ideas, have fun
Attitude is everything at the cutting edge of technology.
STRENGTH/CHARACTERISTICS & TALENTNS
• Positive attitude, meeting the targets, better time management, goal focus, openness & flexibility
and initiative for betterment & continuous improvement.
• Leadership Qualities, Management Capabilities, Customer Handling, Problem solving, Decision
making during any emergency operation, Ability to work under pressure and meet deadlines.
JOB PROFILE
• Work done of following Boilers such as AFBC, Travelling Grate & Dumping grate.
• Work done as O & M of Thermal power plant Coal/Pet Cock/Biomass/MSW based power plant.
• Work done as O & M of Captive power plant Coal/Rice Husk based power plant.
• Work done as O & M of Co-Generation plant Bagasse based Co-Generation plant.
• OPERATION: Responsible for achieving following data’s such as PLF, Heat rate, Efficiency of
Boiler & Turbine, Aux. Consumption, Power Factor, Zero Injury (LTI), Zero LD.
• MAINTENANCE: Effective Maintenance of predictive, Preventive, Repair, Shutdown &
Breakdown.
• CHECKING: Equipments Conditions and Lubricants: Routine/Schedule, Shift, Daily, Weekly,
Monthly, and yearly.
• INTERACTION: INTERNAL : Continuous interaction with Shift In charge, HOD Operation,
HOD Maintenance Power Plant Manager, Other HOD and Executives, Engineers, Boiler
Operators, Fitters, Technicians, Electricians, RO/DM. Chemists & Operators.
• INTERACTION: EXTERNAL: Customers, Vendors, Contractors, Service Providers, And
Visitors.
• SKILL & COMPETENCE : Communication Skills, Operation trouble shooting, Boiler Preservation,
Water chemistry, Interpersonal skills, Presentation Skills, Data interpretation Skills, Basic
Knowledge of ISO 9001 - 2000 quality systems and OHSAS 18001, Safety, First Aid, Fire Fighting.
• TECHNICAL/FUNCTIONAL COMPETENCIES: Basic Operation of following through
DCS/PLC such as Boiler, Turbine, Other Auxiliary equipments.
• PLANNING: Man power, Job, Budgeting & Costing, Inventory Control, Shutdown, Effective
Maintenance predictive, Preventive, Repair, Breakdown.
• MONITORING: Report, Operating Parameters, Analysis Parameters, and Equipment Health
Conditions, Team work Monitoring.
• MAINTAINING: Log Books, Report preparation, Equipment Status, good housekeeping.
• MANAGE: Tools & Tackles, Spare parts, Materials, and Other resources.
• COMPUTER KNOWLEDGE: MS Word, MS Excel, Power point, ERP, SAP, E-mail & Utilities.
KEE WORDS & RESPONSIBILITIES
• Plant Head of Thermal Power Plant
• Repair & maintenance of Boiler, Turbine, Ash & Fuel handling System, Cooling Tower, Pumps,
Fans, Air Compressor and RO/DM. Plant & it’s auxiliaries.
• Errection & commissioning of Boiler, Turbine and RO/DM. plant & its auxiliaries.
• Responsible for overall activities Efficiently, Smoothly & Safely such as Power Generation,
Operation, Maintenance, liasioning, Plant Administration.
EMPLOYMENT DETAILS
Industries Plant Descriptions Designation Duration years
Kohinoor Steel & 17 MW Captive power plant Hangzhou make DGM Power 16/8/2013 8
Power Pvt. Ltd. Turbine condensing, Thermax make Boiler AFBC Plant (Power to Mont
& WHRB Coal fired 80 TPH Wr. Pr. 67 Plant Head) Till date hs
kg/cm (g), Final St. temp. 490 5 C.
Feedback Infra 12.5 MW Thermal power plant Triveni make DGM Power 15/7/2011 2
Feedback Power Turbine condensing, Thermo dyne make Boiler Plant (Unit to
O & M Service Travelling Grate Coal fired 60 TPH Wr. Pr. 67 Head) 15/8/2013
Pvt. Ltd. kg/cm (g), Final St. temp. 490 5 C.
Triveni Engg. & 8 MW Co-generation Triveni make Turbine back Manager 1/8/2007 4
Ind. Ltd. (A pressure, IJT make Dumping Grate Bagasse fired Boiler (HOD) to
Group of Triveni Boiler 80 + 40 TPH Wr. Pr. 45 kg/cm (g), Final St. 14/7/2011
Engg. & Ind. temp. 440 5 C.
Ltd.)
Akbarpur Chini 18 MW Co-generation APEE BELLIS make Dy. Manager 12/7/2005 2
Mill (A Group of Turbine back pressure, IJT make Dumping Grate Boiler to
Balrampur Chini Bagasse fired Boiler 80 + 80 TPH Wr. Pr. 45 (Section 31/7/2007
Mills) kg/cm (g), Final St. temp. 440 5 C. Head)
K R Pulp & 12 MW power plants Triveni make Turbine Sr. Engineer 26/5/2002 3
Paper Mill Pvt. extraction cum condensing, CBL make AFBC power plant to
Ltd. Coal/Pet Cock fired Boiler 60TPH Wr. Pr. 47.5 11/7/2005
kg/cm, Final St. temp. 434 5 C.
Everest Paper 3 MW power plants Triveni make Turbine Sr. Engineer 1/8/1999 3
Mill Pvt. Ltd. (A extraction cum condensing, CBL make AFBC Rice power plant to
Group of Everest Husk fired Boiler 23.5 TPH Wr. Pr. 47.5 kg/cm 25/5/2002
Paper Mills Pvt. (g), Final St. temp. 434 5 C.
Limited)
ACADEMIC QUALIFICATION
Name of Institute Branch Level Grade & % of Marks Study Passe
period d
1st & 75 %
Kyrgyz Technical Mechanical Bachelor 1995 to 1999
University 1999
EDUCATIONAL QUALIFICATIONS
Name of Institute Branch Level Grade & % Study Passe
period d
1st & 65 %
R A R K M Y College Physical Intermediate 1991 to 1993
1993
2nd & 54 %
M J B Secondary School Science SLC (Board) 1980 to 1991
1990
PROFESSIONL TRAINEE
Name of Organization Subject Level Grade & % Trainee period Passe
d
After 2nd Year 1st & 85 %
Ibhanov Metallurgy Ind. Academic 1 month 1996
After 3rd Year 1st & 90 %
Kyrgyz M/C Const. Ind. Technologica 1 month 1998
l
LANGUAGE PROFICIENCY
English Russian Hindi Nepali Maithili Bhojpuri
Read, Write & Read, Write & Read, Write & Read, Write & Read, Write & Read, Write &
Speak Speak Speak Speak Speak Speak
DECLEARATION
I hereby declare that all the above information furnished is correct to best of my knowledge.
RAMBISHWAS RAY
DGM POWER PLANT