Post Job Free
Sign in

Data Plant

Location:
Orlando, FL
Posted:
March 23, 2014

Contact this candidate

Resume:

PO Box ****** Orlando, Florida *****

(cell) 407-***-****

*********@*****.***

David E. Mc Rae

Lead

Telecommunications Field Technician

Time In: 1995 to Present

Summary of qualifications:

. Certified installer per Lucent Technologies/Panduit Network

Systems group and Leviton Telecom/Amp Netconnect/Verint-CCTV.

Worked with specialty systems for Wal-Mart, Costco, Lowes and BJs

i.e. CCTV, HDMI upgrades, Media Card Conversions, Access point

installations,self checkout (SCO) and Family Dollar Upgrades.

Experienced with Krone installation /Belden welded / 25 pair/

hydra cable.

. Certified in Fiber optic installation via epoxy/non epoxy

(internal/external) MTRJ/3M/Siecor/Unicam/Panduit opti-

jack/Volition/Hot Melt/

. Computer literate

. Assisted with the installation at the Jaguar Stadium in Jacksonville,

Fl, Rollins College Winter Park Cisco Wireless Access Points,

Subcontracted with Sprint United for Bay Hills Invitational

installation, Teligent, lead tech for Lockheed-Martin Jassm project

and various organizations.

. Qualified in terminating CAT5/6/7 patch panels, 110/66 blocks,

installing switch tails for PBX/switches, media retrieval patch panels

along with intercom units, testing with Penta Scanner Plus/Agilent

(HP) Wirescope (touch screen) Fluke DSP, Wavetech, Outside plant (OSP)

including ground/line protection, splicing underground dB cables,

voice and data panels. Versed in AT&T Systemax installation

procedures. Attended 10 Hour OSHA certification class.

Pending CCNA Certification (2014)

Background cleared and badged to work In Orange/Lake County School

districts and Orange County Government buildings.

Served USN Armed Forces 1985-1993 Radioman. References upon request..

Employment Timeline

2012- Structured Cabling Solutions-Orlando

Orange, Lake County Public School access point upgrades. New and Retrofit.

Outside plant for Orange County Corrections facilities. Telecom install for

Orange county courthouse.

2009-2011 Staley Technologies: Sanford

Walmart, BJs, Costco, Family Dollar Telecom Installations. Cisco switch

upgrades

Copper/fiberoptic cable install and termination. Security Camera mount and

installation. CCTV.

Mission to upgrade network equipment: switches, routers, CCTV/DVR and

cameras throughout along with wireless access points and RFIDs. Demo old

cable and reinstall compatible backbone to handle all needs of the

customer.

2008-2009 Piranha Network Cabling: Winter Park

Telecom installations. Copper and fiberoptic. Orange and Dade County.

Mission: To install voice and data backbone for LAN/WAN applications..i.e.

Outside plant and horizontal cabling. Fiber optic and wireless access

points.

2006-2007 Staley Inc: Sanford

Walmart, BJs, Costco, Family Dollar Telecom Installations. Switch upgrades

Copper/fiberoptic cable install and termination. Voice, data and Video.

Mission to upgrade network equipment: switches, routers, CCTV/DVR and

cameras throughout along with wireless access points and RFIDs. Demo old

cable and reinstall compatible backbone to handle all needs of the

customer.

2002-2006 Tri-City Electric: Altamonte Springs

Orange County School system Telecom installations.(voice and data cabling)

From the telecom closet (patch panels) to the workstation (work

outlets/jacks).

Residential and Commercial Cabling and installations. Voice, data and

video. Campus wide Cisco wireless access point installation at Rollins

College, Winter park Orlando. FiberOptic, wireless Cisco, WAN

connectivity/terminations.

1999-2002 Teksystems: Orlando (Staffing Company)

Various assignments for multiple company telecom installations.

Mostly Voice and Data cabling from telecom closet to workoutlets.

1997-1999 Network Integration: Orlando

Lockheed Martin copper and fiberoptic installations. Voice, data and video.

On call for move, adds and changes which occurred frequently onsite.

1995-1997 VCH Communications: Orlando

Jaguar Stadium (Jacksonville Fl) copper and fiberoptic installation for

voice, data and video communication. Wired for phone, computer, media

intercom and camera applications.

This was for the Newly Built stadium from start to finish. Consisted of a

Siemen ROLM switch for telephony.



Contact this candidate